HomeMy Public PortalAboutRE_ Gulstream Unit Clarifications (5)
IPM.Note
RE: Gulstream Unit Clarifications
RE:
John Zoerhof
SMTP
jzoerhof@HYPOWERINC.COM
Gulstream Unit Clarifications
Received: from impinc06.yourhostingaccount.com ([10.1.13.106] helo=impinc06.yourhostingaccount.com)
by mailscan09.yourhostingaccount.com with esmtp (Exim)
id 1VCDp0-0004jh-Vn
for dbrannon@bngengineers.com; Wed, 21 Aug 2013 15:11:59 -0400
Received: from db8outboundpool.messaging.microsoft.com ([213.199.154.189])
by impinc06.yourhostingaccount.com with NO UCE
id FXAy1m03i45T1Y502XAyhQ; Wed, 21 Aug 2013 15:10:59 -0400
Received: from mail200-db8-R.bigfish.com (10.174.8.233) by
DB8EHSOBE015.bigfish.com (10.174.4.78) with Microsoft SMTP Server id
14.1.225.22; Wed, 21 Aug 2013 19:10:58 +0000
Received: from mail200-db8 (localhost [127.0.0.1]) by
mail200-db8-R.bigfish.com (Postfix) with ESMTP id E721F50014E for
<DBrannon@BnGEngineers.com>; Wed, 21 Aug 2013 19:10:57 +0000 (UTC)
Received: from mail200-db8 (localhost.localdomain [127.0.0.1]) by mail200-db8
(MessageSwitch) id 1377112197396576_12386; Wed, 21 Aug 2013 19:09:57 +0000
(UTC)
Received: from DB8EHSMHS015.bigfish.com (unknown [10.174.8.254]) by
mail200-db8.bigfish.com (Postfix) with ESMTP id 59B384C0048 for
<DBrannon@BnGEngineers.com>; Wed, 21 Aug 2013 19:09:57 +0000 (UTC)
Received: from BL2PRD0710HT004.namprd07.prod.outlook.com (157.56.240.133) by
DB8EHSMHS015.bigfish.com (10.174.4.25) with Microsoft SMTP Server (TLS) id
14.16.227.3; Wed, 21 Aug 2013 19:09:54 +0000
Received: from BN1PR07MB183.namprd07.prod.outlook.com (10.242.216.148) by
BL2PRD0710HT004.namprd07.prod.outlook.com (10.255.102.39) with Microsoft SMTP
Server (TLS) id 14.16.347.3; Wed, 21 Aug 2013 19:09:50 +0000
Received: from BN1PR07MB183.namprd07.prod.outlook.com (10.242.216.148) by
BN1PR07MB183.namprd07.prod.outlook.com (10.242.216.148) with Microsoft SMTP
Server (TLS) id 15.0.745.25; Wed, 21 Aug 2013 19:09:45 +0000
Received: from BN1PR07MB183.namprd07.prod.outlook.com ([169.254.9.224]) by
BN1PR07MB183.namprd07.prod.outlook.com ([169.254.9.224]) with mapi id
15.00.0745.000; Wed, 21 Aug 2013 19:09:45 +0000
From: John Zoerhof <jzoerhof@HYPOWERINC.COM>
To: "Danny Brannon (DBrannon@BnGEngineers.com)" <DBrannon@BnGEngineers.com>
Subject: RE: Gulstream Unit Clarifications
Thread-Topic: Gulstream Unit Clarifications
Thread-Index: AQJzJlxtedBVTSbvmO69fBGWdGNWyg==
Disposition-Notification-To: John Zoerhof <jzoerhof@HYPOWERINC.COM>
X-MS-Exchange-MessageSentRepresentingType: 1
Date: Wed, 21 Aug 2013 19:09:44 +0000
Message-ID:
<7e370dcddc7a40658e800e758d195bca@BN1PR07MB183.namprd07.prod.outlook.com>
Content-Language: en-US
X-MS-Has-Attach: yes
X-MS-TNEF-Correlator:
x-en-origip: 213.199.154.189
Content-Type: multipart/mixed;
boundary="_007_7e370dcddc7a40658e800e758d195bcaBN1PR07MB183namprd07pro_"
MIME-Version: 1.0
John Zoerhof
SMTP
jzoerhof@HYPOWERINC.COM
Danny Brannon (DBrannon@BnGEngineers.com)
Hypower
Gulstream Unit Clarifications
Danny,
Is this what you were looking for? Comments?
Regards,
John Zoerhof
Division Manager – Power Services Group
954.448.0369 Cell
954.917.1439 Direct
[Description: HYPOWER one company pwrfl sol.jpg]<http://www.hypowerinc.com/>
From: John Zoerhof
Sent: Monday, August 19, 2013 5:35 PM
To: Danny Brannon (DBrannon@BnGEngineers.com)
Subject: Gulstream Unit Clarifications
Danny,
The following is a narrative addressing items discussed at the review meeting 8/16/13;
Item 11. Directional Bore Machine Set Up with Pits Complete (Includes all Pits and site restoration work)
Clarifications; This item as proposed assumed a remobilization as well as work completed. If remobilization is not required and crews are still onsite you can expect
a deduction of this price by $1,400 dollars.
Item 40-43. Rock Conditions
Clarifications; These were proposed as adders. Below will be the per foot cost of each total.
40. Install 24” Trench (Rock Conditions) $32.00
41. Install 30” Trench (Rock Conditions) $34.00
42. Install 36” Trench (Rock Conditions) $37.00
43. Install 48” Trench (Rock Conditions) $48.00
Item 65. Install Vista Switch complete with terminations & Grounding on existing pad
Clarifications; This item as proposed assumed the maximum terminations (6 – 600A & 6-200A, Total 12), grounding, tagging and also energizing / switching. Eliminating
switching costs reduces this line item to $3,059.00. Further deductions can be issued at $100 for each termination if 12 are not required.
Item 69. Access Customer Cable to intercept existing UG customer owned electrical service (Locating Service, cutting customer metal Pipe, and assocoiated excavation and site restoration)
Clarifications; This item as proposed had included the service change over tasks of splicing, cable etc. Per our discussion this task will be inclusive of location of
conduit, excavation to expose conduit, cutting conduit, attaching existing conduit to existing conduit utilizing FPL provided materials. Revised cost: $786.00
Item 71. Install FPL UG Service (4/0 TPX including 2” conduit, cable 24” trench Hand Dig and Site restoration)
Clarification; Cost revised to a per ft price of $29.63
Item 72. Install FPL UG Service (Parallel 4/0 TPX including 2” conduit, cable 24” trench Hand Dig and Site restoration)
Clarification; Cost revised to per ft price assuming 2-2” conduits of $33.18
I believe that covers all the items. Please let me know if I have missed anything or further clarifications are needed. Also let me know if you need this in another form.
Regards,
John Zoerhof
Division Manager – Power Services
Direct 954.917.1439
Cell 954.448.0369
[cid:image002.jpg@01CE9E7F.C5EC5C80]<http://www.hypowerinc.com/power>
954.978.9300 – Main 954.969-3139 - Fax
P Please consider the environment before printing this e-mail
________________________________
NOTICE: This email is intended solely for the use of the individual to whom it is addressed and may contain information that is privileged, confidential or otherwise exempt from disclosure.
If the reader of this email is not the intended recipient or the employee or agent responsible for delivering the message to the intended recipient, you are hereby notified that any
dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, please immediately notify us by telephone and
return the original message to us at the listed email address. Thank You.
________________________________
8D97FFE6099DCB42AF00129386D18642@namprd09.prod.outlook.com
<7e370dcddc7a40658e800e758d195bca@BN1PR07MB183.namprd07.prod.outlook.com>
Renee Basel
Renee Basel
EX
/O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=3BAA9F04D837426B9ED16B03EC111B7B-RBASEL
EX
/O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=3BAA9F04D837426B9ED16B03EC111B7B-RBASEL
SMTP
jzoerhof@HYPOWERINC.COM
John Zoerhof
John Zoerhof
John Zoerhof
John Zoerhof
Renee Basel
Renee Basel
jzoerhof@HYPOWERINC.COM
jzoerhof@HYPOWERINC.COM
jzoerhof@HYPOWERINC.COM
rbasel@gulf-stream.org
rbasel@gulf-stream.org
II=[CID=4d55d079-ef26-ee98-bd7c-1196746356ca;IDXHEAD=0273265C6D;IDXCOUNT=1];SBT=16;S2=<4a233f9f1905486b8e83b3ee5b38a022@BN1PR07MB183.namprd07.prod.outlook.com>;RTP=Ancestor;TDN=Mismatch;TP=Same;TFR=N
otForking;Version=Version 15.20 (Build 2157.0), Stage=H5;UP=D0;DP=105
en
72CBF27A84CCE603
RBasel@gulf-stream.org
00000002/o=ExchangeLabs/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=3baa9f04d837426b9ed16b03ec111b7b-rbasel
Danny Brannon (DBrannon@BnGEngineers.com)
SMTP
DBrannon@BnGEngineers.com
DBrannon@BnGEngineers.com
Danny Brannon (DBrannon@BnGEngineers.com)
image001.jpg
.jpg
image001.jpg
image001.jpg
image/jpeg
image001.jpg@01CE9E7F.C5EC5C80
EnUs
image002.jpg
.jpg
image002.jpg
image002.jpg
image/jpeg
image002.jpg@01CE9E7F.C5EC5C80
EnUs
Hypower Selected Unit Cost Clarifications.pdfHypower Unit Clarifications.xlsx
Item No. Unit Description and Clarifications Unit of Measure Contractor's Unit Price DIRECTIONAL BORING 11 Directional Bore Machine Setup with Pits Complete (includes all pits and site restoratio
n work) EA $1,100.00 11.a Cost if Remobilization is required for item 11. (Mobilization per each occurrence. IE: if multiple locations are requested and can be performed at the same time, only one
mobilization would apply for that group) EA $1,400.00 MISCELLANEOUS 65 Install Vista Switch complete with terminations & grounding on existing pad and chambers (Cost includes installation of
gear, all grounding, tagging and a maximum of 12 terminations [6 ‐ 600A & 6‐200A]) EA $3,059.00 65.a Item 65 with only 9 Terminations. All else remains the same EA $2,315.00 65.b Item 65 with only
6 Terminations. All else remains the same EA $1,970.00 69 Access Customer Conduit to intercept existing UG customer owned electrical service. (Includes locating, excavation, cutting customer metal
pipe, connection of new system conduit to existing froming a singl new path to service, backfill and associated restoration) EA $786.00 Unit Price Schedule of Values (for Pricing Change Order Work
) Hypower Clarifications to requested items
.pdf
Hypowe~1.pdf
Hypower Selected Unit Cost Clarifications.pdf
application/pdf
5618BFE589464E4A8025A17BB99BA486@namprd09.prod.outlook.com
EnUs
[if !mso]><style>v\:* {behavior:url(#default#VML);} o\:* {behavior:url(#default#VML);} w\:* {behavior:url(#default#VML);} .shape {behavior:url(#default#VML);} </style><![endif]
Danny,
Is this what you were looking for? Comments?
Regards,
John Zoerhof
Division Manager – Power Services Group
954.448.0369 Cell
954.917.1439 Direct
http://www.hypowerinc.com/
Description: HYPOWER one company pwrfl sol.jpg
cid:image001.jpg@01CE9E7F.C5EC5C80
From: John Zoerhof
Sent: Monday, August 19, 2013 5:35 PM
To: Danny Brannon (DBrannon@BnGEngineers.com)
Subject: Gulstream Unit Clarifications
Danny,
The following is a narrative addressing items discussed at the review meeting 8/16/13;
Item 11. Directional Bore Machine Set Up with Pits Complete (Includes all Pits and site restoration work)
Clarifications; This item as proposed assumed a remobilization as well as work completed. If remobilization is not required and crews are still onsite you can expect
a deduction of this price by $1,400 dollars.
Item 40-43. Rock Conditions
Clarifications; These were proposed as adders. Below will be the per foot cost of each total.
40. Install 24” Trench (Rock Conditions) $32.00
41. Install 30” Trench (Rock Conditions) $34.00
42. Install 36” Trench (Rock Conditions) $37.00
43. Install 48” Trench (Rock Conditions) $48.00
Item 65. Install Vista Switch complete with terminations & Grounding on existing pad
Clarifications; This item as proposed assumed the maximum terminations (6 – 600A & 6-200A, Total 12), grounding, tagging and also energizing / switching. Eliminating
switching costs reduces this line item to $3,059.00. Further deductions can be issued at $100 for each termination if 12 are not required.
Item 69. Access Customer Cable to intercept existing UG customer owned electrical service (Locating Service, cutting customer metal Pipe, and assocoiated excavation and site restoration)
Clarifications; This item as proposed had included the service change over tasks of splicing, cable etc. Per our discussion this task will be inclusive of location of
conduit, excavation to expose conduit, cutting conduit, attaching existing conduit to existing conduit utilizing FPL provided materials. Revised cost: $786.00
Item 71. Install FPL UG Service (4/0 TPX including 2” conduit, cable 24” trench Hand Dig and Site restoration)
Clarification; Cost revised to a per ft price of $29.63
Item 72. Install FPL UG Service (Parallel 4/0 TPX including 2” conduit, cable 24” trench Hand Dig and Site restoration)
Clarification; Cost revised to per ft price assuming 2-2” conduits of $33.18
I believe that covers all the items. Please let me know if I have missed anything or further clarifications are needed. Also let me know if you need this in another form.
Regards,
John Zoerhof
Division Manager – Power Services
Direct 954.917.1439
Cell 954.448.0369
http://www.hypowerinc.com/power
cid:image002.jpg@01CE9E7F.C5EC5C80 954.978.9300 – Main 954.969-3139 - Fax
P Please consider the environment before printing this e-mail
NOTICE: This email is intended solely for the use of the individual to whom it is addressed and may contain information that is privileged, confidential or otherwise exempt from disclosure.
If the reader of this email is not the intended recipient or the employee or agent responsible for delivering the message to the intended recipient, you are hereby notified that any
dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, please immediately notify us by telephone and
return the original message to us at the listed email address. Thank You.