HomeMy Public PortalAboutChange Order#1 Foxwood Estates Low-Pressure Sewer System ProjectSECTION 00843 CHANGEORDERFORM ENGINEER: Jacobs OWNER'S CONTRACTNO.: CHANGE IN CONTRACT PRICE: Original Contract Price $1, t 56,194.00 The following changes are hereby made to the Contract Documcnts: Original Contraot Times Substantial Completion: 240 Readv for 6lal oavment: 270 Davs Net ohangos from previous Change Orders No, to No. Net ohange from previous Change Ordeis No. _ l,o No. $0 0 days Contract Pdce pdor to this Change Order $ l,ls6,194,00 Net Increase of this Change Order Contract Times prior to this Change Order Substantial Completion: 240 da Ready for final payment: 270 days Net Increase (d€€ro€so) of this Change Order 0$t24,492.41_ Conhact Price with all approved Change Orders Contract Times with all approved Change Orders $1,280,686,41 Substanrial Completion: 240 days Ready for final payrnent: 270 days 00843-1 Project: City of Crestview Foxwood Estates Low-Pressure Sewer System Project Phase 1 Force Mains CHANGEORDERNO. 1 DATE OF ISSUANCE: &bruery.lL20ZL-CONTRACTOR:Constantine Construotor, LLC EFFECTwE DATE: F ebruarv 6. 2024 CIIANGE IN CONTRACT TIMES: CHANGES ORDERED: GENERAL This change order is necessary to covff emergercy work required due to the recent force main break along Rasberry Road. This repair involves replacernent of the existing 10-inch ductile iron aerial foroe main installed over Juniper Creek with a 12" HDPE force main installed under the creek by horizontal directional drill. Change Order No. 1 II. REQUIRED CHANGES: The conkactor will install a new forc,e main across Juniner Creek al e Rasben'v Road:tie-in the new force to the existine force maiu and demoligh the existing force main from the bddee. III. JUSTIFICATION:The work is in response to a rce maln break which requhes exoedi ted lacement of force main to avoid anv other spillase ofraw sewer, IV. PAYMENT: This chanse order will result in an toqease of $124.492.4 the total contract amount. 00843-2 I V. APPROVAL AND CHANGE AUTHORIZATION Acknowledgments: The aforementioned change, and work affected thereby, is subject to all provisions of the original contract not specifically changed by this Change Order; and, It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. Change Order Request by:Constantine Co nstructor. LLC Change(s) Ordered by Jacobs :NA Seth T ACCEPTED BY: Constantine Constructors, LLC By: ,/ n-f./' (Engincer)(Contrac tor) (Authorized Signature) Construction Manager 2t0612024 02t06t2024 (Dare)(Authorized Signaturc) Construction Manaser (Date) APPROVED BY: Citv of Crestview. Florida (Title) (Owner) By:--1 tlelz. (Authorized S ignature)(Date) END OF SECTION 00843-3 RECOMMENDED BY: (Title) Clty of Cresvlew Rasberry Road Emergency Force Main Bore Summary OESCRIPTION QTY Unit Unit Prlce Totals $/cat % OF TOTAI. MOBILIZATION Mobllize E tl t r LS s 2,s97.36 S 2,s97,36 HOD. 72r,20O fi Excavate for bore It 1 t-s s 1,298,68 s 1,298.68 Moblllze drlll equl ment 1 LS S 1o,ooo.oo S 1o,ooo.oo Drill 12" HDD 1 ts S 27,860,00 S 2z860.00 New alr telease vault 1 ts S 4,ooo,oo S 4,ooo,oo lnstallalr release wlth vault 1 LS s 1,298.68 S 1,298.58 12'HDD e and Flttl 1 IJ S 33,733.16 S 33,733.16 Tie in HDD to exstl s 2,s97.36 s as97.36 Demo existl on brld 7 LS s 1,298,58 $ 1,298.68 Flnlsh and seed 1 LS 500.00 S soo,oo TOTAL DIRECT COSTS S 85,1s3.92 66% GENERAI. CONDITIONS S 14,206.s2 SUBTOTAI.$ 99,390.44 P BONDS 2.00%S 2,s79.85 GENERA! I.IABII.ITY 0.00%s BUSINESS TICENSE RENEWAL s SUBTOTAL S 101,970,29 79% SALES TAX 0.00%s SUBTOTAL I 101,970.29 79% CONTRACTORS CONTINGENCY 70.o0%$ 10,197.03 SUETOTAL S Lt2,167.32 a7% 75.OO%S 16,82s.10 TOTAL BASE BID $ t:28,992,47 700% ITEM PROPOSED ACCEPTED REJECTED 12'r Gate Valves ln lieu of 12'Pl Deduct)$ (4,s00.00) TOTAI. COST $724,492.41 CONTRACTORS FEE Base Bld r I f- t- I f- T-L r T --__-l = T-l-- Cinch Underground Inc. P. O. Box 690 Chipley, FL 32428 US (8s0)4l s-6416 j cookcinchug@gmail.co ln ADDRESS David G. Marshall Constantine Constructors, Inc. 1988 Lewis Turner Blvd Fort Walton Beach, FL 32547 United States PROJECTNAI{E Crestview Emergency Repair Mobilization Mobilization Vermeer 24x40 Fusion Machine and Crew Direotional Bore Emergency Bore estimated 240 LF of 12" HDPE DRI I Sewer Line Price includes fusion. Fusion of 72"- 260 LF @ $8/ft: $2080 Fusion of 12" MJs @ $ 150.00/ea.: $300 Pre-Ream Bore Path with 16" Reamer 260LF @ $38/FT: S9,880 Directional Bore and Pull 12" HDPE 260 LF @ $60/LF= S15,600 This includes directional drill fluids. Disposal of Directional drill fluids. CINCH will provide the following: Fusion Crew Drill Crew Mini Excavator for pits Materials CINCH willNOT provide: Pennitting Survey As-Builts Updated to reflect 12" HDPE. I , 10,000.00 10,000.00 I 27,860.00 27,860.00 CINCH lt;t ESTIIV(ATE # 3s77 DATE 0130t2024 HPIRATION O3IO1I2O24 DATE Thank you for clroosing tro accept a quote frorn Cinch Underground Inc. TOTAL Accepted By Accepted Date $37,86'0"oo QUOTE , \ iDr;; ;;""ti*.a ".., "ralrppry-"rrrr."e* i" rh-. Du&iltin-olr irpe. pvc ""a trope ,titi"-s'iti - ! ^ | i pJi"g "rthcse producs willbe based solely on theavailability at the tim. ofshipment. Also' Siren lhe [ ! J I vorariliV in rhese ma*cts we will nol bc r6poNible for plDdtrcl availability ard shipmcnt delays, as they aN ! 7 r our ofour contml. Bid prices should be considard an estimate, materisls will only ba priccd at time of FORTILINE WATERWORKS a l/tOISCo brard I shipment until the curmt supply chain challcrtges art Iesolved. These lerms are in leu oIourstardad tenns r we apprcciate your plrtnership. 6444808FORTII,INE PANAIUA CITY QUOTE NOQUOTING BRANCHCUSTOMER NO L/29/24 1 QUOTE DATE CRESTV]EW EMERGENCY REPAIR PROJECT INFORMATION i*i******t****** GIVEN THE CURRENT PRICING AND SUPPLY CHAIN CHALLENGES ALL MATERIAI, WILI, BE PRICED AT TIME OF SHI PMEI{T AND THE PRICES BELOW ARE TO BE USED AS AN ESTIMATE FOR BID PURPOSES ONI,Y******l*r*****rt***rr********* ].2" MJ LONG SLEEVE P4O1 C153 12( ONE-r,OK PVC W/ACC SLCEP12 L2X2 IP 317 SDL 72.75-L3.20 2 nx12' SS NTPPLE 3042f SS COUPLING 304 2tr THD SS BAJ,L VLV 3042' THD COMBO AIR VAI,VE D.025 12 DR11 HDPE DIPS GREEN STRIPE 12' M.] PLUG Vl,V W/GEAR 4615 SCREW VB W/SEWER LrD vI,V BOX PROTECTOR RING ROI'ND CONCRETE12' ONE-LOK PVC W/ACC SLCEP12 12' C9OO DR],8 PIPE GREEN ].2'X1O " REDUCER 12rX10n M,J REDUCER P401 C153].2' DR1l DIPS HDPEXM.J ADAPTER ],ESS STIFFENER, WITH KIT10' ONE.LOK PVC W/ACC SLCEP1O 1OAWG CC WIRE GREEN 5OO' ROLL 12' L2't2,c153 SLDE P 12 158.0000 40.0000 41.0000 83.0000 1,500.0000 s,000.0000 100.0000 25.0000 35.5000 50.?300 .2000 155.0000 913 .0000 156.0000 952.0000 141.0000 0000 0000 2,130 L56 't72 308 193.2800 0000 0000 100.00 9, 940.00 1, 014 .60 158.00 80.00 41.00 83 .00 1, 500.00 3,808.00 1, 1"28.00 5,500.00 312.00 10, 000 . 00 200.00 50.00 524 .00 1,544.00 615.00 110 180 290 160 230 10 20 40 50 50 '74 80 250 260 270 310 320 130 14 0 150 200 2LO 220 2 2 1 2 1 1 1 2AO 20 4 4 8 500 2 2 2 2 ALL STOCK DELIVERI CUSTOMER CONSTANTINE CONSTRUCTORS LLC1988 I.,EWIS TURNER BLVD UNIT 3 FORT WALTON BEACH, FL 3254'7 PAGE 2257 L0 TOTAL PRICEUNIT PRICEUOMDESCRIPTIONLINEQTY EA EA EA EA E,A EA EA EA EA EA EA EA EA EA EA EA FT EA EA 12, MJ GV O/L A236t-23 L/ACC12' ONE-LOK PVC W/ACC SLCEP12 45 MJ 45 P4 01 ONE.LOK DIP W/ACC 185.55 1,826.00 312.00 2 2 2 2 2 4 AIIPVC and HDPE materialis quored lbrshipment within 7 days ofquotctid date. A ll other matefial is q uoted fo r sh ipmcnt w ithin l0 days o l quorc/bid datc. Allcr ? davs for PVC and HDPE or J0 dirvs lbr nll other material. ALL ouoled prices are subiect to rcvaew based on curftnt martcl conditions. CRESTVIEW EMERGENCY REPAIR22s7 L0 CUSTOMER NO 27/29 /245444808 QUOTE DATEQiroTE NO subtobal r Tax : lact 1oEa-L: 39 t233,L6 2 ,7 46 ,32 4r,9'.7 9 .48 ALL STOCK DELMRIES ARE SUB,fECT TO SHIPPING CHARGES All PVC and HDPEmaterialis quoted forshipmont within 7 days ofquote/bid date. All othei matedal is quoted forshipment within 30 days ofquote/bld date. After7 days for PVCand HDPEoT 30 davs forall ofter moterial. ALL ouoted rr ces aae subieot to rcviow bosed on cunen! market oonditions. Ent By TMP 2to2t24 1OiO7t44 .fOB NAME I2AGE IlNE QTY UOM DESCRIPTION UNIT PR]CE TOTAI, PRICE