Loading...
HomeMy Public PortalAboutGulstream Unit Clarifications (2) IPM.Note Gulstream Unit Clarifications John Zoerhof SMTP jzoerhof@HYPOWERINC.COM Gulstream Unit Clarifications Received: from impinc06.yourhostingaccount.com ([10.1.13.106] helo=impinc06.yourhostingaccount.com) by mailscan11.yourhostingaccount.com with esmtp (Exim) id 1VBXBc-0003Wf-6K for dbrannon@bngengineers.com; Mon, 19 Aug 2013 17:40:28 -0400 Received: from co9outboundpool.messaging.microsoft.com ([207.46.163.28]) by impinc06.yourhostingaccount.com with NO UCE id ElgS1m04E0d4L6f02lgT4N; Mon, 19 Aug 2013 17:40:27 -0400 Received: from mail183-co9-R.bigfish.com (10.236.132.245) by CO9EHSOBE017.bigfish.com (10.236.130.80) with Microsoft SMTP Server id 14.1.225.22; Mon, 19 Aug 2013 21:40:26 +0000 Received: from mail183-co9 (localhost [127.0.0.1]) by mail183-co9-R.bigfish.com (Postfix) with ESMTP id 33C52D20101 for <DBrannon@BnGEngineers.com>; Mon, 19 Aug 2013 21:40:26 +0000 (UTC) Received: from mail183-co9 (localhost.localdomain [127.0.0.1]) by mail183-co9 (MessageSwitch) id 1376948423335351_17452; Mon, 19 Aug 2013 21:40:23 +0000 (UTC) Received: from CO9EHSMHS030.bigfish.com (unknown [10.236.132.244]) by mail183-co9.bigfish.com (Postfix) with ESMTP id 43951DA00A2 for <DBrannon@BnGEngineers.com>; Mon, 19 Aug 2013 21:40:23 +0000 (UTC) Received: from BL2PRD0710HT004.namprd07.prod.outlook.com (157.56.240.133) by CO9EHSMHS030.bigfish.com (10.236.130.40) with Microsoft SMTP Server (TLS) id 14.16.227.3; Mon, 19 Aug 2013 21:40:22 +0000 Received: from BN1PR07MB181.namprd07.prod.outlook.com (10.242.216.143) by BL2PRD0710HT004.namprd07.prod.outlook.com (10.255.102.39) with Microsoft SMTP Server (TLS) id 14.16.347.3; Mon, 19 Aug 2013 21:40:20 +0000 Received: from BN1PR07MB183.namprd07.prod.outlook.com (10.242.216.148) by BN1PR07MB181.namprd07.prod.outlook.com (10.242.216.143) with Microsoft SMTP Server (TLS) id 15.0.745.25; Mon, 19 Aug 2013 21:40:18 +0000 Received: from BN1PR07MB183.namprd07.prod.outlook.com ([169.254.9.224]) by BN1PR07MB183.namprd07.prod.outlook.com ([169.254.9.224]) with mapi id 15.00.0745.000; Mon, 19 Aug 2013 21:40:18 +0000 From: John Zoerhof <jzoerhof@HYPOWERINC.COM> To: "Danny Brannon (DBrannon@BnGEngineers.com)" <DBrannon@BnGEngineers.com> Subject: Gulstream Unit Clarifications Thread-Topic: Gulstream Unit Clarifications Thread-Index: AQE6TafG5q7xuAe/Bm2yqckqnQRoIg== Disposition-Notification-To: John Zoerhof <jzoerhof@HYPOWERINC.COM> X-MS-Exchange-MessageSentRepresentingType: 1 Date: Mon, 19 Aug 2013 21:40:17 +0000 Message-ID: <c9d948a3024440f589dc6d753bc7e09f@BN1PR07MB183.namprd07.prod.outlook.com> Content-Language: en-US X-MS-Has-Attach: yes X-MS-TNEF-Correlator: x-en-origip: 207.46.163.28 Content-Type: multipart/related; boundary="_004_c9d948a3024440f589dc6d753bc7e09fBN1PR07MB183namprd07pro_"; type="multipart/alternative" MIME-Version: 1.0 John Zoerhof SMTP jzoerhof@HYPOWERINC.COM Danny Brannon (DBrannon@BnGEngineers.com) Hypower Gulstream Unit Clarifications Danny, The following is a narrative addressing items discussed at the review meeting 8/16/13; Item 11. Directional Bore Machine Set Up with Pits Complete (Includes all Pits and site restoration work) Clarifications; This item as proposed assumed a remobilization as well as work completed. If remobilization is not required and crews are still onsite you can expect a deduction of this price by $1,400 dollars. Item 40-43. Rock Conditions Clarifications; These were proposed as adders. Below will be the per foot cost of each total. 40. Install 24” Trench (Rock Conditions) $32.00 41. Install 30” Trench (Rock Conditions) $34.00 42. Install 36” Trench (Rock Conditions) $37.00 43. Install 48” Trench (Rock Conditions) $48.00 Item 65. Install Vista Switch complete with terminations & Grounding on existing pad Clarifications; This item as proposed assumed the maximum terminations (6 – 600A & 6-200A, Total 12), grounding, tagging and also energizing / switching. Eliminating switching costs reduces this line item to $3,059.00. Further deductions can be issued at $100 for each termination if 12 are not required. Item 69. Access Customer Cable to intercept existing UG customer owned electrical service (Locating Service, cutting customer metal Pipe, and assocoiated excavation and site restoration) Clarifications; This item as proposed had included the service change over tasks of splicing, cable etc. Per our discussion this task will be inclusive of location of conduit, excavation to expose conduit, cutting conduit, attaching existing conduit to existing conduit utilizing FPL provided materials. Revised cost: $786.00 Item 71. Install FPL UG Service (4/0 TPX including 2” conduit, cable 24” trench Hand Dig and Site restoration) Clarification; Cost revised to a per ft price of $29.63 Item 72. Install FPL UG Service (Parallel 4/0 TPX including 2” conduit, cable 24” trench Hand Dig and Site restoration) Clarification; Cost revised to per ft price assuming 2-2” conduits of $33.18 I believe that covers all the items. Please let me know if I have missed anything or further clarifications are needed. Also let me know if you need this in another form. Regards, John Zoerhof Division Manager – Power Services Direct 954.917.1439 Cell 954.448.0369 [cid:image003.jpg@01CE9D02.7C7C7630]<http://www.hypowerinc.com/power> 954.978.9300 – Main 954.969-3139 - Fax P Please consider the environment before printing this e-mail ________________________________ NOTICE: This email is intended solely for the use of the individual to whom it is addressed and may contain information that is privileged, confidential or otherwise exempt from disclosure. If the reader of this email is not the intended recipient or the employee or agent responsible for delivering the message to the intended recipient, you are hereby notified that any dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, please immediately notify us by telephone and return the original message to us at the listed email address. Thank You. ________________________________ 007F43AADE5EAC48963AB92C1BF90845@namprd09.prod.outlook.com <c9d948a3024440f589dc6d753bc7e09f@BN1PR07MB183.namprd07.prod.outlook.com> Renee Basel Renee Basel EX /O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=3BAA9F04D837426B9ED16B03EC111B7B-RBASEL EX /O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=3BAA9F04D837426B9ED16B03EC111B7B-RBASEL SMTP jzoerhof@HYPOWERINC.COM John Zoerhof John Zoerhof John Zoerhof John Zoerhof Renee Basel Renee Basel jzoerhof@HYPOWERINC.COM jzoerhof@HYPOWERINC.COM jzoerhof@HYPOWERINC.COM rbasel@gulf-stream.org rbasel@gulf-stream.org II=[CID=b8f1aee6-bf07-6d06-b2a9-c92a9d046822;IDXHEAD=013A4DA7C6;IDXCOUNT=1];TFR=NotForking;Version=Version 15.20 (Build 2157.0), Stage=H4;UP=10;DP=1C5 en 41C36DD09100DE8F RBasel@gulf-stream.org 00000002/o=ExchangeLabs/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=3baa9f04d837426b9ed16b03ec111b7b-rbasel Danny Brannon (DBrannon@BnGEngineers.com) SMTP DBrannon@BnGEngineers.com DBrannon@BnGEngineers.com Danny Brannon (DBrannon@BnGEngineers.com) image003.jpg .jpg image003.jpg image003.jpg image/jpeg image003.jpg@01CE9D02.7C7C7630 EnUs [if !mso]><style>v\:* {behavior:url(#default#VML);} o\:* {behavior:url(#default#VML);} w\:* {behavior:url(#default#VML);} .shape {behavior:url(#default#VML);} </style><![endif] Danny, The following is a narrative addressing items discussed at the review meeting 8/16/13; Item 11. Directional Bore Machine Set Up with Pits Complete (Includes all Pits and site restoration work)                 Clarifications; This item as proposed assumed a remobilization as well as work completed. If remobilization is not required and crews are still onsite you can expect a deduction of this price by $1,400 dollars. Item 40-43. Rock Conditions                 Clarifications; These were proposed as adders. Below will be the per foot cost of each total.                 40. Install 24” Trench (Rock Conditions) $32.00                 41. Install 30” Trench (Rock Conditions) $34.00                 42. Install 36” Trench (Rock Conditions) $37.00                 43. Install 48” Trench (Rock Conditions) $48.00 Item 65. Install Vista Switch complete with terminations & Grounding on existing pad                 Clarifications; This item as proposed assumed the maximum terminations (6 – 600A & 6-200A, Total 12), grounding, tagging and also energizing / switching. Eliminating switching costs reduces this line item to $3,059.00. Further deductions can be issued at $100 for each termination if 12 are not required. Item 69. Access Customer Cable to intercept existing UG customer owned electrical service (Locating Service, cutting customer metal Pipe, and assocoiated excavation and site restoration)                 Clarifications; This item as proposed had included the service change over tasks of splicing, cable etc. Per our discussion this task will be inclusive of location of conduit, excavation to expose conduit, cutting conduit, attaching existing conduit to existing conduit utilizing FPL provided materials. Revised cost: $786.00 Item 71. Install FPL UG Service (4/0 TPX including 2” conduit, cable 24” trench Hand Dig and Site restoration)                 Clarification; Cost revised to a per ft price of $29.63 Item 72.  Install FPL UG Service (Parallel 4/0 TPX including 2” conduit, cable 24” trench Hand Dig and Site restoration)                 Clarification; Cost revised to per ft price assuming 2-2” conduits of $33.18 I believe that covers all the items. Please let me know if I have missed anything or further clarifications are needed. Also let me know if you need this in another form. Regards, John Zoerhof Division Manager – Power Services Direct    954.917.1439 Cell       954.448.0369 http://www.hypowerinc.com/power cid:image003.jpg@01CE9D02.7C7C7630 954.978.9300 – Main                                               954.969-3139 - Fax P Please consider the environment before printing this e-mail NOTICE: This email is intended solely for the use of the individual to whom it is addressed and may contain information that is privileged, confidential or otherwise exempt from disclosure. If the reader of this email is not the intended recipient or the employee or agent responsible for delivering the message to the intended recipient, you are hereby notified that any dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, please immediately notify us by telephone and return the original message to us at the listed email address. Thank You.