HomeMy Public PortalAboutGulstream Unit Clarifications (2)
IPM.Note
Gulstream Unit Clarifications
John Zoerhof
SMTP
jzoerhof@HYPOWERINC.COM
Gulstream Unit Clarifications
Received: from impinc06.yourhostingaccount.com ([10.1.13.106] helo=impinc06.yourhostingaccount.com)
by mailscan11.yourhostingaccount.com with esmtp (Exim)
id 1VBXBc-0003Wf-6K
for dbrannon@bngengineers.com; Mon, 19 Aug 2013 17:40:28 -0400
Received: from co9outboundpool.messaging.microsoft.com ([207.46.163.28])
by impinc06.yourhostingaccount.com with NO UCE
id ElgS1m04E0d4L6f02lgT4N; Mon, 19 Aug 2013 17:40:27 -0400
Received: from mail183-co9-R.bigfish.com (10.236.132.245) by
CO9EHSOBE017.bigfish.com (10.236.130.80) with Microsoft SMTP Server id
14.1.225.22; Mon, 19 Aug 2013 21:40:26 +0000
Received: from mail183-co9 (localhost [127.0.0.1]) by
mail183-co9-R.bigfish.com (Postfix) with ESMTP id 33C52D20101 for
<DBrannon@BnGEngineers.com>; Mon, 19 Aug 2013 21:40:26 +0000 (UTC)
Received: from mail183-co9 (localhost.localdomain [127.0.0.1]) by mail183-co9
(MessageSwitch) id 1376948423335351_17452; Mon, 19 Aug 2013 21:40:23 +0000
(UTC)
Received: from CO9EHSMHS030.bigfish.com (unknown [10.236.132.244]) by
mail183-co9.bigfish.com (Postfix) with ESMTP id 43951DA00A2 for
<DBrannon@BnGEngineers.com>; Mon, 19 Aug 2013 21:40:23 +0000 (UTC)
Received: from BL2PRD0710HT004.namprd07.prod.outlook.com (157.56.240.133) by
CO9EHSMHS030.bigfish.com (10.236.130.40) with Microsoft SMTP Server (TLS) id
14.16.227.3; Mon, 19 Aug 2013 21:40:22 +0000
Received: from BN1PR07MB181.namprd07.prod.outlook.com (10.242.216.143) by
BL2PRD0710HT004.namprd07.prod.outlook.com (10.255.102.39) with Microsoft SMTP
Server (TLS) id 14.16.347.3; Mon, 19 Aug 2013 21:40:20 +0000
Received: from BN1PR07MB183.namprd07.prod.outlook.com (10.242.216.148) by
BN1PR07MB181.namprd07.prod.outlook.com (10.242.216.143) with Microsoft SMTP
Server (TLS) id 15.0.745.25; Mon, 19 Aug 2013 21:40:18 +0000
Received: from BN1PR07MB183.namprd07.prod.outlook.com ([169.254.9.224]) by
BN1PR07MB183.namprd07.prod.outlook.com ([169.254.9.224]) with mapi id
15.00.0745.000; Mon, 19 Aug 2013 21:40:18 +0000
From: John Zoerhof <jzoerhof@HYPOWERINC.COM>
To: "Danny Brannon (DBrannon@BnGEngineers.com)" <DBrannon@BnGEngineers.com>
Subject: Gulstream Unit Clarifications
Thread-Topic: Gulstream Unit Clarifications
Thread-Index: AQE6TafG5q7xuAe/Bm2yqckqnQRoIg==
Disposition-Notification-To: John Zoerhof <jzoerhof@HYPOWERINC.COM>
X-MS-Exchange-MessageSentRepresentingType: 1
Date: Mon, 19 Aug 2013 21:40:17 +0000
Message-ID:
<c9d948a3024440f589dc6d753bc7e09f@BN1PR07MB183.namprd07.prod.outlook.com>
Content-Language: en-US
X-MS-Has-Attach: yes
X-MS-TNEF-Correlator:
x-en-origip: 207.46.163.28
Content-Type: multipart/related;
boundary="_004_c9d948a3024440f589dc6d753bc7e09fBN1PR07MB183namprd07pro_";
type="multipart/alternative"
MIME-Version: 1.0
John Zoerhof
SMTP
jzoerhof@HYPOWERINC.COM
Danny Brannon (DBrannon@BnGEngineers.com)
Hypower
Gulstream Unit Clarifications
Danny,
The following is a narrative addressing items discussed at the review meeting 8/16/13;
Item 11. Directional Bore Machine Set Up with Pits Complete (Includes all Pits and site restoration work)
Clarifications; This item as proposed assumed a remobilization as well as work completed. If remobilization is not required and crews are still onsite you can expect
a deduction of this price by $1,400 dollars.
Item 40-43. Rock Conditions
Clarifications; These were proposed as adders. Below will be the per foot cost of each total.
40. Install 24” Trench (Rock Conditions) $32.00
41. Install 30” Trench (Rock Conditions) $34.00
42. Install 36” Trench (Rock Conditions) $37.00
43. Install 48” Trench (Rock Conditions) $48.00
Item 65. Install Vista Switch complete with terminations & Grounding on existing pad
Clarifications; This item as proposed assumed the maximum terminations (6 – 600A & 6-200A, Total 12), grounding, tagging and also energizing / switching. Eliminating
switching costs reduces this line item to $3,059.00. Further deductions can be issued at $100 for each termination if 12 are not required.
Item 69. Access Customer Cable to intercept existing UG customer owned electrical service (Locating Service, cutting customer metal Pipe, and assocoiated excavation and site restoration)
Clarifications; This item as proposed had included the service change over tasks of splicing, cable etc. Per our discussion this task will be inclusive of location of
conduit, excavation to expose conduit, cutting conduit, attaching existing conduit to existing conduit utilizing FPL provided materials. Revised cost: $786.00
Item 71. Install FPL UG Service (4/0 TPX including 2” conduit, cable 24” trench Hand Dig and Site restoration)
Clarification; Cost revised to a per ft price of $29.63
Item 72. Install FPL UG Service (Parallel 4/0 TPX including 2” conduit, cable 24” trench Hand Dig and Site restoration)
Clarification; Cost revised to per ft price assuming 2-2” conduits of $33.18
I believe that covers all the items. Please let me know if I have missed anything or further clarifications are needed. Also let me know if you need this in another form.
Regards,
John Zoerhof
Division Manager – Power Services
Direct 954.917.1439
Cell 954.448.0369
[cid:image003.jpg@01CE9D02.7C7C7630]<http://www.hypowerinc.com/power>
954.978.9300 – Main 954.969-3139 - Fax
P Please consider the environment before printing this e-mail
________________________________
NOTICE: This email is intended solely for the use of the individual to whom it is addressed and may contain information that is privileged, confidential or otherwise exempt from disclosure.
If the reader of this email is not the intended recipient or the employee or agent responsible for delivering the message to the intended recipient, you are hereby notified that any
dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, please immediately notify us by telephone and
return the original message to us at the listed email address. Thank You.
________________________________
007F43AADE5EAC48963AB92C1BF90845@namprd09.prod.outlook.com
<c9d948a3024440f589dc6d753bc7e09f@BN1PR07MB183.namprd07.prod.outlook.com>
Renee Basel
Renee Basel
EX
/O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=3BAA9F04D837426B9ED16B03EC111B7B-RBASEL
EX
/O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=3BAA9F04D837426B9ED16B03EC111B7B-RBASEL
SMTP
jzoerhof@HYPOWERINC.COM
John Zoerhof
John Zoerhof
John Zoerhof
John Zoerhof
Renee Basel
Renee Basel
jzoerhof@HYPOWERINC.COM
jzoerhof@HYPOWERINC.COM
jzoerhof@HYPOWERINC.COM
rbasel@gulf-stream.org
rbasel@gulf-stream.org
II=[CID=b8f1aee6-bf07-6d06-b2a9-c92a9d046822;IDXHEAD=013A4DA7C6;IDXCOUNT=1];TFR=NotForking;Version=Version 15.20 (Build 2157.0), Stage=H4;UP=10;DP=1C5
en
41C36DD09100DE8F
RBasel@gulf-stream.org
00000002/o=ExchangeLabs/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=3baa9f04d837426b9ed16b03ec111b7b-rbasel
Danny Brannon (DBrannon@BnGEngineers.com)
SMTP
DBrannon@BnGEngineers.com
DBrannon@BnGEngineers.com
Danny Brannon (DBrannon@BnGEngineers.com)
image003.jpg
.jpg
image003.jpg
image003.jpg
image/jpeg
image003.jpg@01CE9D02.7C7C7630
EnUs
[if !mso]><style>v\:* {behavior:url(#default#VML);} o\:* {behavior:url(#default#VML);} w\:* {behavior:url(#default#VML);} .shape {behavior:url(#default#VML);} </style><![endif]
Danny,
The following is a narrative addressing items discussed at the review meeting 8/16/13;
Item 11. Directional Bore Machine Set Up with Pits Complete (Includes all Pits and site restoration work)
Clarifications; This item as proposed assumed a remobilization as well as work completed. If remobilization is not required and crews are still onsite you can expect
a deduction of this price by $1,400 dollars.
Item 40-43. Rock Conditions
Clarifications; These were proposed as adders. Below will be the per foot cost of each total.
40. Install 24” Trench (Rock Conditions) $32.00
41. Install 30” Trench (Rock Conditions) $34.00
42. Install 36” Trench (Rock Conditions) $37.00
43. Install 48” Trench (Rock Conditions) $48.00
Item 65. Install Vista Switch complete with terminations & Grounding on existing pad
Clarifications; This item as proposed assumed the maximum terminations (6 – 600A & 6-200A, Total 12), grounding, tagging and also energizing / switching. Eliminating
switching costs reduces this line item to $3,059.00. Further deductions can be issued at $100 for each termination if 12 are not required.
Item 69. Access Customer Cable to intercept existing UG customer owned electrical service (Locating Service, cutting customer metal Pipe, and assocoiated excavation and site restoration)
Clarifications; This item as proposed had included the service change over tasks of splicing, cable etc. Per our discussion this task will be inclusive of location of
conduit, excavation to expose conduit, cutting conduit, attaching existing conduit to existing conduit utilizing FPL provided materials. Revised cost: $786.00
Item 71. Install FPL UG Service (4/0 TPX including 2” conduit, cable 24” trench Hand Dig and Site restoration)
Clarification; Cost revised to a per ft price of $29.63
Item 72. Install FPL UG Service (Parallel 4/0 TPX including 2” conduit, cable 24” trench Hand Dig and Site restoration)
Clarification; Cost revised to per ft price assuming 2-2” conduits of $33.18
I believe that covers all the items. Please let me know if I have missed anything or further clarifications are needed. Also let me know if you need this in another form.
Regards,
John Zoerhof
Division Manager – Power Services
Direct 954.917.1439
Cell 954.448.0369
http://www.hypowerinc.com/power
cid:image003.jpg@01CE9D02.7C7C7630 954.978.9300 – Main 954.969-3139 - Fax
P Please consider the environment before printing this e-mail
NOTICE: This email is intended solely for the use of the individual to whom it is addressed and may contain information that is privileged, confidential or otherwise exempt from disclosure.
If the reader of this email is not the intended recipient or the employee or agent responsible for delivering the message to the intended recipient, you are hereby notified that any
dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, please immediately notify us by telephone and
return the original message to us at the listed email address. Thank You.