Loading...
HomeMy Public PortalAboutPlanning Board Packet 11/02/21 supplementalSUPPLEMENTAL PACKET, 11/02/21 1 Draft Stormwater Management Regulations dated 10/22/21: Comparison of Minor and Major Stormwater Permit Requirements Minor Permit Major Permit Threshold 500-2,000 sq. ft. of net impervious area and/or 10,000-20,000 sq. ft. of land disturbance Exceeds thresholds for Minor Permit Application Form Required Required Stormwater Management Plan • Project narrative • Drawing, map, or plans of existing conditions, proposed work and erosion and sediment controls • Stormwater volume calculations for stormwater best management practices (BMPs) • Operations and maintenance description • Site plan including: - Existing conditions - Proposed conditions - Erosion and sediment control - Construction details • Stormwater Management Report • Operations and Maintenance Plan Public Meeting Not required Required Stormwater Management Certificate of Compliance (SMCC) Not required Required Review and Waiver Authority Designated Agent (Town Staff) Stormwater Authority (Conservation Commission or Planning Board) Construction-site Stormwater Management Maximum extent practicable; Prevent erosion, sediment, and waste nuisance conditions Required Low Impact Development Required unless impracticable (a lower standard than “infeasible”) Required unless infeasible Post-Construction Stormwater Management At least one stormwater BMP installed (e.g., rain garden, rain barrel) to manage 1 inch runoff from net impervious area or 500 sq. ft., whichever is greater. Meet MA Stormwater Standards and pollutant removal standards for phosphorus and nitrogen. Design for shutdown and containment if on commercial or industrial land uses. Construction Inspections Requirements determined by Designated Agent, as needed Required and procedures documented Long-Term Operations and Maintenance (O+M) Maintain to ensure BMP function Required: • O+M Plan • Documentation of O+M • Additional O+M requirements determined by Stormwater Authority or Designated Agent, as needed Surety Not Required May be required by Stormwater Authority Application Fee $50 $100 Example Site Approximate Areas Image Brewster Town Hall 2198 Main Street (6A) Parking Lot: ~35,000 sq ft Building: ~13,000 sq ft Eddy Elementary School 2298 Main Street (6A) Parking Lot #1: ~9,700 sq ft Parking Lot #2: ~25,000 sq ft Building: 57,000 sq ft Commercial Property at Corner of Main Street (6A) and Underpass Road Parking Lot: ~16,000 sq ft Building: ~3,800 sq ft Underpass Road #2 #1 Example Site Approximate Areas Image Cumberland Farms and Foster Square 2639 & 2655 Main Street (6A) Parking Lot: ~50,000 sq ft Building: ~5,000 sq ft (Cumberland Farms*) Sample Residential Addition Existing Building: 2,000 sq ft Garage Addition: 400 sq ft Typical Two Car Garage Building: 400-700 sq ft 20’ 20’ 20’ 50’ Existing Proposed 40’ ' * Example Site Approximate Areas Image Typical Driveways 700 - 3,000 sq ft and up Typical long driveway: 12 ft wide x 100 ft long = 1,200 sq ft