HomeMy Public PortalAbout2010-38 Approving work authorization with C3TS re playground barriersRESOLUTION NO. 2010-38
A RESOLUTION OF THE VILLAGE COUNCIL OF THE
VILLAGE OF KEY BISCAYNE, FLORIDA, APPROVING
WORK AUTHORIZATION FOR THE SERVICES OF THE
FIRM OF CORZO CASTELLA CARBALLO THOMPSON
SALMAN, P.A. ("C3TS"); PROVIDING FOR C3TS TO
PERFORM OWNER REPRESENTATION, CONSTRUCTION
PROJECT MANAGEMENT, ADMINISTRATION AND
INSPECTION SERVICES FOR CONSTRUCTION OF 30"
HIGH SEATING WALLS ALONG THE NORTHWEST AND
SOUTH PERIMETERS OF THE EXISTING PLAYGROUND
TO SERVE AS BARRIERS; PROVIDING FOR
IMPLEMENTATION; PROVIDING FOR EFFECTIVE DATE.
WHEREAS, pursuant to Resolution No. 98-34, the Village of Key Biscayne (the "Village")
has previously entered into a series of continuing contracts with engineering and architecture firms
for necessary services; and
WHEREAS, the engineering, architecture and planning firm of Corzo Castella Carballo
Thompson Salman, P.A. ("C3TS") is under a continuing contract to the Village as authorized by
Resolution No. 98-34, and has provided professional services to the Village on several projects in
a timely and efficient manner; and
WHEREAS, the Village finds that it is in the best interest of the Village to utilize C3TS for
the purpose of performing owner representation, construction project management, administration
and inspection services for construction of 30" high seating walls along the northwest and south
perimeters of the existing playground to serve as barriers (the "Project") in accordance with the
attached Work Authorization and with the Village Manager's memorandum, which accompanies this
Resolution.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE VILLAGE
OF KEY BISCAYNE, FLORIDA, AS FOLLOWS:
Section 1. Recitals Adopted. That each of the recitals stated above is hereby adopted
and confirmed.
Section 2. Work Authorized. Specification of Funds. That pursuant to the existing
continuing contract between C3TS and the Village, the performance of additional engineering and
related services (the "Engineering Services"), as described above and as described in the attached
Work Authorization, dated July 2, 2010, is hereby approved and authorized for the Project, subject
to the funding source and any other limitations which are set forth in the above referenced Village
Manager's memorandum.
Section 3. Work Authorization Approved.
A. That the Village Manager is hereby authorized to execute the Work Authorization,
in substantially the form attached hereto, for the accomplishment of the Engineering Services which
are authorized hereunder, once approved by the Village Attorney as to form and legal sufficiency.
B. That the total fees payable pursuant to the Work Authorization shall not exceed
Fourteen Thousand Dollars ($14,000.00), unless further authorized by the Village Council.
Section 4. Implementation. That the Village Manager is hereby authorized to take any
and all action which is necessary to implement the purposes of this Resolution and the Work
Authorization.
Section 5. Effective Date. That this Resolution shall be effective immediately upon
adoption hereof and shall be applied retroactively to any Engineering Services which are authorized
herein.
2
AT
PASSED AND ADOPTED this 7th day of September, 2010.
•
za7?zr
C • CHITA H. ALVAREZ, MMC, VILLAGE CLE
APPROVED AS T • FORM AND LEGAL SUFFICI
VILLAGE ATT
3
MAYOR ROBERT L. VERNON
VILLAGE OF KEY BISCAYNE
Village Council
Robert L. Vernon, Mayor
Enrique Garcia, Vice Ma
Michael W. Davey SATE:
Robert Gusman
Michael E. Kelly TO:
Jorge E. Mendia
Thomas Thornton
FROM:
Village Manager RE:
Genaro "Chip" Iglesias
RECOMMENDATION
Office of the Village Manager
MEMORANDUM
August 30, 2010
Honorable Mayor and Members of the Vi :ge Council
Genaro "Chip" Iglesias, Village Ma
Approving work authorization to Corzo Castella Carballo
Thompson Salman, PA (C3TS) for services relating to the
bidding, construction management, and administration of the
seating/barrier wall project.
It is recommended that the Village Council consider authorizing C3TS to conduct the
work specified for the seating/barrier wall project on the Village Green playground not to
exceed $14,000.
BACKGROUND
The Village Council directed the Village Manager to investigate the feasibility of placing
a barrier around the Village Green tot lot due to the safety issues created by the
proximity of the adjacent roadways and sidewalk.
On April 27, 2010 this issue was brought before the Council. There were comments
from residents who attended the meeting regarding the different options and a possible
alternative approach. It was determined that a public meeting should be held to discuss
the project. This meeting was conducted on May 18, 2010.
On June 8, 2010 staff reported to the Village Council regarding the meeting and
provided the following recommendation:
"A barrier around the playground would not only help to prevent children from
quickly reaching Village Green Way and Fernwood Road but also help separate
the playground from the traffic on the sidewalk adjacent to the playground. A
seating wall would address the barrier concern while also providing the additional
seating around the playground frequently requested by residents. Therefore, it is
recommended that first option be selected over the fence option included as
Exhibit "B"."
The Village Council directed staff to return with plans to proceed with the seating/barrier
wall project as described in the recommendation and support documentation.
88 West McIntyre Street • Suite 210 • Key Biscayne, Florida 33149 • (305) 365-5500 • Fax (305) 365-893
MISSION STATEMENT: "TO PROVIDE A SAFE, QUALITY COMMUNITY ENVIRONMENT FOR ALL ISLANDERS THROUGH RESPONSIBLE GOVERNMENT"
www.keybiscayne.fl.gov
This resolution would permit the Village to enter into an agreement with C3TS to
perform owner representation, construction project management, administration, and
inspection services for the barrier/seating wall project. If approved the Village and
C3TS would proceed with the design, permitting and bidding phase of the proposal
totaling $9,500. Once this phase is completed, staff would bring the bid results back to
the Village Council with a recommended bidder and construction cost before proceeding
to the construction phase of this agreement for $4,500. This agreement would be
funded by the CIP line item "Tot Lot Landscape Barrier" with a balance of $10,000 with
the remainder of the project being funded by the CIP Surplus line item.
Exhibits:
Exhibit "A":
Exhibit "B":
Exhibit "C":
Work Authorization from C3TS
Preliminary Cost Estimate: Option 1
Preliminary Site Plan
cars
CCU ! / O
C ASTEI <.A
C::A(,,B.A 0
THOM C)
C A NI A N
Engineers
Architects
Planners
E80005027
AAC002142
TO:
ATTENTION:
PROJECT NAME:
WORK ORDER FOR PROFESSIONAL SERVICES
Village of Key Biscayne
88 West McIntyre Street
Key Biscayne, Florida 33149
Todd Hofferberth, Director
Parks & Recreation Department
Village Green Playground Barriers
Key Biscayne, Florida
DATE: 07/02/10
FILE: 1108-00
Dear Mr. Hofferberth:
We are pleased to submit this proposal for professional services for the above referenced project.
DESCRIPTION OF SERVICES:
SCOPE OF PROJECT
Construction of 30" high seating walls along the northwest and south perimeters of the existing
playground to serve as barriers. These walls will have ornamental features, landscaping and
irrigation, and will be configured as shown on the attached sketch. No electrical or lighting work is
anticipated.
DESIGN AND PERMITTING
Layout, design and preparation of construction plans and specifications for the proposed
improvements as described above. For the purposes of this proposal, we are assuming that the
service connection points for the proposed irrigation systems are available immediately adjacent to
the site from the existing Village Green system.
During the preliminary design phase, we will produce a preliminary site layout plan for review and
approval of the general layout by the Parks & Recreation and Public Works Department. No
presentations or preparation of presentation graphics are included in this project. Upon approval of
preliminary site plan, we will proceed to finalize the design and the construction plans. We will
process the construction plans for approval through the Village Building & Zoning Department.
Village shall provide us with current project site survey in AutoCad electronic format.
BIDDING/NEGOTIATION PHASE
During the bidding or negotiation phase, we shall attend pre -bid conference, answer contractor
inquiries, prepare any addendums, review bid proposals and contractor qualifications, prepare bid
tabulation, and prepare recommendation for Village Council award.
CONSTRUCTION PHASE
During the construction phase, we will provide limited services as described below.
1. Attend pre -construction conference.
901 Ponce de Leon Blvd., Suite 900, Car& Gables, Florida 33134
Web S•te. www c3ts corn Equal Opportunity Employer
305 445 2900 1 800 448 0227 Facsimile 305 445 3366
Work Order for Professional Services
Village Green Playground Barriers
July 2, 2010
Page 2
1. Attend pre -construction conference.
2. Shop drawing review.
3. Respond to Contractor request for information and clarifications/interpretation of
contract documents.
4. Provide project inspection, as determined by us to be necessary to check for general
conformance with contract documents and to certify the project upon completion.
5. Review of Contractor payment requisitions.
6. Preparation of project punch list and contract close-out.
TERMS AND CONDITIONS:
Our fees for the above services shall be as follows:
Design & Permitting $8,500
Bidding Phase $1,000
Construction Phase $4,500
Total $14,000
All terms and conditions shall be per our current Agreement for Professional Services. We are
ready' to begin working on this assignment upon your authorization to proceed. If acceptable to
you, we will accept a signed copy of this form as your written authorization to proceed with the
assignment.
Thank you.
Corzo Castella Carballo Thompson Salman, P.A.
Ramon Castella, P.E.
Principal
RC/er
Village o ey Biscayne
Approv by:
Date:
l \Protects11108-00\W O-Proposals1W0070110VGPtaygroundBarriL doc
Apr 14, 2010
Key Biscayne Village Green
Playground Barrier
OPTION 1
Clearing & grubbing $1,500
Irrigation system extension & connection $3,750
Three gallon Shrubs (incl mulch, fertilizer, etc) 290 C 15 $4,350
30" high curved masonry seat wall, with cap 380 @ 140 $53,200
Masonry columns with cap 8 C 750 $6,000
3 x 3 alum picket gates 2 C 500 $1,000
Sub -total $69,800
Contractors general conditions, overhead & profi 35% $24,430
Design, permits, management, inspections 15% $14,135
TOTAL $108,365
OPTION 2
Clearing & grubbing $1,500
Irrigation system extension & connection $3,750
Three gallon Shrubs (incl mulch, fertilizer, etc) 540 C 15 $8,100
3 ft aluminum picket fence 380 @ 65 $24,700
3 x 3 alum picket gates 2 C 500 $1,000
Sub -total $39,050
Contractors general conditions, overhead & profi 35% $13,668
Design, permits, management, inspections 15% $7,908
TOTAL $60,625
At.uM. Pi T
\♦
75 t!
4E4Ik14-
�"� t r
•
Jr
r.:
{Village Green W
POLY ty1.4
f.Y
4/
Playground
100 f✓' r
as
41161.2.
left* fu,
as
/
/ Water
/ Playground
Oil t.Z
a.;r.
aar
' 4 rem.
au'
)-+a
0-11. 'L �0 wyTr
4.1V.c-I,-
`l RYw.. i
61y
slI]i0
hts' I�adja
a.t r
II
Playground
K+a 2 ..
0.4.'1,4 .
C., :
�V "? dr ♦.
c -If '-IT
av
y KrX u,�
♦
Key Biscayne Village Green
Playground Barrier Option i