HomeMy Public PortalAboutORD-CC-2016-15CITY OF MOAB ORDINANCE NO.2016-15
AN ORDINANCE ENACTING A MORATORIUM ON NEW CONNECTIONS TO THE CITY
OF MOAB WASTEWATER TREATMENT SYSTEM.
The following findings describe the reasons for this ordinance and explain its purpose:
a. The City of Moab currently operates a wastewater treatment facility situated on west 400
North Street (the "WWTP" or the "Plant"). The WWTP currently serves the combined
wastewater treatment needs of the City of Moab, the Spanish Valley Water and Sewer
Improvement District (SVWSID), and septage haulers who discharge into the Plant. Service to
persons outside of the municipal limits of the City of Moab is provided pursuant to an agreement
with the SVWSID.
b. The WWTP was constructed in 1959 and has been upgraded twice since construction.
Treated effluent from the Plant enters the Colorado River.
c. Periodically over the last few years the City has risked exceeding effluent limitations
established by the Utah Department of Environmental Quality. The City has undertaken a
number of modifications to treatment processes in an effort to improve treatment efficiency at
the Plant.
d. Engineers retained by the City have recently concluded that the WWTP is operating at
capacity, with minimal ability to accept greater inflows without changes to treatment systems.
The City is currently studying if changes to treatment systems can be implemented, and at what
cost.
e. The City is finalizing design and preparing to award contracts for the construction of a
new wastewater treatment facility. However, the new facility may not be operational until late
2018.
f. In the interim, the City is receiving additional requests for wastewater treatment service
from residential and commercial development within the City and Grand County. Reasonably
anticipated requests for sewer service are likely to exceed available WWTP capacity.
g. The City of Moab possesses authority to regulate and control connections to its
wastewater treatment system pursuant to existing ordinances. M.M.C. § 13.08.010, et seq.
h. It is in the best interests of the City of Moab, its citizens, and the environment that the
City undertake a review of WWTP capacity, and that it halt new connections to the wastewater
treatment system until such time as treatment capacity is available. The City finds a compelling
public interest to enact this ordinance.
i. The City is also cognizant that moratoria on new wastewater connections may have an
adverse effect on the City's efforts to encourage the construction of affordable housing for
people who live and work in Moab. Therefore, the City concludes that it is in the best interest of
the City of Moab that the moratorium in this ordinance contain an exception for new wastewater
connections serving the primary residence of persons who live in Moab and Grand County.
1
Now therefore, the City of Moab enacts the following:
1. Definitions.
a. The term "Equivalent Residential Unit" or "ERU" means the average wastewater
generation, measured on a calendar month basis during the peak month of the year, for a typical
residence. For purposes of this ordinance, one ERU shall be equal to a peak month flow of four
thousand four hundred (4,400) gallons of wastewater at an average Biological Oxygen Demand
(BOD) strength of 300 mg/L and a Total Suspended Solids (TSS) strength of 280 mg/L.
b. The term "Existing Connection" means a lawfully established plumbing
connection to the City of Moab wastewater system and WWTP as of the effective date of this
ordinance, whether located within or outside of the City of Moab municipal limits, where the
property owner has paid all applicable connection fees and impact fees.
c. The term "Primary Residential Connection" mean a wastewater connection
serving a residence which is established after the effective date of this ordinance where the
owner certifies, under penalty of perjury, that he/she: i) is a full-time resident of Grand County
and/or the City of Moab; and ii) the dwelling is used as a personal residence, and not for a
commercial use, overnight lodging, as a second home, or for tourism related uses.
2. Moratorium on New Sewer Connections. Except as provided in this ordinance, no new
or expanded plumbing connections to the City of Moab wastewater treatment system or WWTP,
whether occurring inside or outside of the municipal limits of the City of Moab, shall be
permitted upon the effective date of this ordinance.
3. Effective Date and Duration. This ordinance shall take effect immediately upon
passage, and shall continue for a period of ONE HUNDRED EIGHTY (180) calendar days,
following which it will automatically expire. It is the policy of the City that this ordinance will
be reviewed when City staff determines that additional wastewater treatment capacity is
available. This ordinance shall supersede and take precedence over any conflicting ordinances or
policies of the City of Moab.
4. Applicability to Other Agencies or Agreements. This ordinance shall apply to, and
supersede, all existing agreements governing connections to the City of Moab wastewater
treatment system, whether such connections occur inside or outside of City of Moab territorial
limits. The City directs that the SVWSID, and/or the Grand Water and Sewer Service Agency
take all appropriate steps to implement this ordinance as to future connections to the City of
Moab wastewater treatment system which may be sought within the jurisdictions of those
agencies. Additionally, the City requests that the Grand County Building Inspector inform all
new building permit applicants who may require a sewer connection of the existence of this
ordinance at the time of permit application.
5. Priority Connections and Exceptions to the Moratorium. The City acknowledges that
a number of persons within the City and Grand County have procured land use entitlements
(including building permits) for the construction of new facilities as of the effective date of this
ordinance, or submitted land use applications that have been deemed complete at the time of the
2
adoption of this ordinance. In an effort to avoid hardship to those who may have relied in good
faith upon these land use approvals or review processes, the following Priority Connections, as
defined in Exhibit 1, attached, shall be excluded from the applicability of this ordinance. In every
case, Priority Connections must pay all applicable connection fees, impact fees, and service fees;
and wastewater service must be lawfully installed.
a. Future applications that are for Primary Residential Use (Primary Residential
Connections) shall be exempted from the moratorium provisions of this ordinance. In every case
Primary Residential Connections may pay all applicable connection fees, impact fees, and
service fees; and wastewater service must be lawfully installed.
b. Existing Connections are unaffected by the moratorium provisions of this
ordinance. Existing Connections may be repaired or replaced incident to lawful remodeling or
repair activities, provided that there shall be no increase in connection size or capacity associated
with any repair or remodeling work.
c. For the duration of this ordinance there shall be no transfer or assignment of
Existing Connections, Priority Connections, or Primary Residential Connections from any
location other than as specified at the time service is established. Any purported transfer of
connections or purported connection rights shall be void.
6. Implementation/Enforcement. The staff of the City of Moab is directed to take all
necessary steps to implement this ordinance. Staff is additionally directed to study and report to
the City Council on the subject of additional modifications to treatment processes at the WWTP
which may be undertaken to improve treatment efficiency and/or capacity until such time as the
new treatment plant is operational.
a. Where land use applications requiring a wastewater treatment connection are
received by the City after the effective date of this ordinance, the City is authorized to review
and, if appropriate, approve those applications, subject to the following condition:
This development requires service from the City of Moab wastewater treatment plant. Due to a
current lack of system capacity, the City will not be able to provide sewer service to this project
until treatment plant upgrades are in place. Therefore, approval of this project is subject to the
following condition: A Certificate of Occupancy will not be permitted until such time as
treatment capacity, as determined by the City of Moab, is available, and a wastewater treatment
connection is installed.
b. No person shall: i) engage in any development requiring a wastewater treatment
connection in violation of this ordinance; ii) construct or install a connection to the City
wastewater treatment system in violation of this ordinance; or iii) violate any other provisions of
this ordinance. Violation may be punishable as a Class B misdemeanor. Alternately, the City
may bring an action to enjoin or abate any violation. In any such civil enforcement proceeding
the City need only establish the fact of a violation, and need not post any bond as a condition to
obtain an injunction. In addition to any other relief, the court may award the City its reasonable
attorney fees and costs incurred in any enforcement action under this ordinance.
3
7. Severability. If any provision of this ordinance shall be found to be invalid by any court
with jurisdiction, the provision shall be severed and the remainder of the ordinance shall be
enforced without the severed provision.
Approved and adopted this 8 day of November, 2016.
(0 42--
By:
Mayor David Sakrison
Attest:
Rachel Stenta, Recorder
I1_Le
Date
Attached: Exhibit 1, List of Priority Connections
4
Cji1
r
J jl 1 �i
i/' ! �4
,, r\ 4
,.
/ 'A1 i+
1 r i i 1� .y`
rrllil,i
"EXHIBIT 1"
"PRIORITY CONNECTIONS"
County/
City
Penni
Num.-
Permit
Date: ';I
City or
County
Residential .
or
Commercial
Type of Permit
sling Add --
,),
City of Moab
Residential
Nev,/ construction
1780 Mill Creek Drive
Multi -family housing - 215 units
City of Moab
Commercial
New Construction
1000 Sand Flats Road
Lionsback Development
City of Moab
Commercial
New construction
712 N. Mi Vida
Moab Bolt - Retail & bike shop
City of Moab
Commercial
Addition/Remodel
690 S. Main
Moab Brewery Distillery
2/3/2016
City of Moab
Commercial
New construction
890 N Main
Hotel - Moab Place/Hyatt Place
5/2/2016
City of Moab
Commercial
New construction
356 S Main
Hotel - Sleep Inn & MainStay Suites
6/20/2016
City of Moab
Commercial
Remodel
245 W Williams Way
Hotel - Overnight rental units 3 units
10/26/2015
City of Moab
Commercial
Addition
96 S Main
Rooftop patio addition
1702
4/5/2016
City of Moab
Commercial
Remodel
39 E 100 N
Moonflower Market addition and remodel
2683
10/13/2016
City of Moab
Commercial
Remodel
125 E Center
Jail renovation
2637
7/1/2016
City of Moab
Commercial
New construction
301 S Main
High Point Hummer rentals & office
2253
4/21/2014
City of Moab
Commercial
New construction
51 N 100 W
Hoodoo hotel and restaurant
2605
5/19/2016
City of Moab
Commercial
New construction
165 W Center St
Hotel - Overnight rental units 2 units
2611
6/2/2016
City of Moab
Commercial
New construction
301 S 400 E
Moab Realty Office Building
10/17/2016
City of Moab
Commercial
Remodel
95 N Main
Change of use - storage to kitchen
10/18/2016
City of Moab
Residential
Remodel
810 Mill Creek Dr
Change of use/duplex
2668
9/2/2016
City of Moab
Residential
Addition/Remodel
161 E 100 N
Addition/Remodel
2658
8/8/2016
City of Moab
Residential
Addition
796 Mountainview Dr
Accessory dwelling unit addition and remodel
2663
8/24/2016
City of Moab
Residential
Addition/Remodel
71 E 200 N
Change of use/ADU
2669
9/2/2016
City of Moab
Residential
Remodel
521 & 515 N Taylor Ave
Change of use/duplex
2348
12/11/2014
City of Moab
Residential
New construction
261 Walnut Ln
Hoodoo Employee housing
2607
5/23/2016
City of Moab
Residential
Manufactured home--
382 W Moenkopi
Manufactured home on private property
2598
5/11/2016
City of Moab
Residential
Manufactured home--
382 W Chinle Ave
Manufactured home on private property
10/21/2016
City of Moab
Residential
New construction
1146 E Bonita St
New residence
10/21/2016
City of Moab
Residential
New construction
1126 E Bonita St
New residence
10/21/2016
City of Moab
Residential
New construction
1104 E Bonita St
New residence
10/21/2016
City of Moab
Residential
New construction
1098 E Bonita St
New residence
10/21/2016
City of Moab
Residential
New construction
1064 E Bonita St
New residence
10/17/2016
City of Moab
Residential
New construction
780 Palisade
New residence
10/17/2016
City of Moab
Residential
New construction
621 Doc Allen Drive
New residence
10/17/2016
City of Moab
Residential
New construction
644 Doc Allen Drive
New residence
10/17/2016
City of Moab
Residential
New construction
748 W Bartlett St
New residence
10/13/2016
City of Moab
Residential
New construction
670 E Bittle Ln
New residence
10/13/2016
City of Moab
Residential
New construction
1127 E Bonita St
New residence
1/6/2016
City of Moab
Residential
New construction
414 E Secret Cove Ct
New residence
2665
8/31/2016
City of Moab
Residential
New construction
571 E Dragon Fly Tr
New residence
2656
8/4/2016
City of Moab
Residential
New construction
637 S 400 E
New residence
2655
8/4/2016
City of Moab
Residential
New construction
635 S 400 E
New residence
2652
7/22/2016
City of Moab
Residential
New construction/straw
608 River Sands Dr
New residence
2653
7/26/2016
City of Moab
Residential
New construction
1299 E Dream Dr
New residence
Page: 1 of 4
Residential
Commercial
Change of use/intensity
Workforce Housing
Manufactured Home
2627
6/28/2016
City of Moab
Residential
New construction/straw
671 E Dragon Fly Trail
New residence
2626
6/28/2016
City of Moab
Residential
New construction/straw
661 E Dragon Fly Trail
New residence
2675
9/29/2016
City of Moab
Residential
New construction
486 Locust Ln
New residence
2586
4/20/2016
City of Moab
Residential
New construction
258 S 200 E
New residence
2580
4/4/2016
City of Moab
Residential
New construction
1316 E Dream Dr
New residence
2576
3/23/2016
City of Moab
Residential
New construction
1293 E Dream Dr
New residence
2543
2/2/2016
City of Moab
Residential
New construction
1291 E Dream Dr
New residence
2564
3/4/2016
City of Moab
Residential
New construction
1389 Powerhouse Ln
New residence
2468
9/15/2015
City of Moab
Residential
New construction/straw
491 E Nichols Ln
New residence
2453
8/21/2015
City of Moab
Residential
New construction
191 E 200 N
New residence
2673
9/12/2016
City of Moab
Residential
New construction
295 Aspen Ave
New residence - accessory dwelling unit
2640
7/12/2016
City of Moab
Residential
New construction/ADU
532 Doc Allen Dr
New residence - accessory dwelling unit
2450
8/18/2015
City of Moab
Residential
New construction
434 Ute Cir
New residence - accessory dwelling unit
2600
5/16/2016
City of Moab
Residential
New construction
631 W 470 N
New residence - Building 3, Unit 1, Plan C
2601
5/16/2016
City of Moab
Residential
New construction
635 W 470 N
New residence - Building 3, Unit 2, Plan B
2602
5/16/2016
City of Moab
Residential
New construction
639 W 470 N
New residence - Building 3, Unit 3, Plan B
2603
5/16/2016
City of Moab
Residential
New construction
643 W 470 N
New residence - Building 3, Unit 4, Plan C
2628
6/29/2016
City of Moab
Residential
New construction
672 W 470 N
New residence - Building 4, Unit 1, Plan C
2629
6/29/2016
City of Moab
Residential
New construction
668 W 470 N
New residence - Building 4, Unit 2, Plan B
2630
6/29/2016
City of Moab
Residential
New construction
664 W 470 N
New residence - Building 4, Unit 3, Plan B
2631
6/29/2016
City of Moab
Residential
New construction
660 W 470 N
New residence - Building 4, Unit 4, Plan A
2632
6/29/2016
City of Moab
Residential
New construction
652 W 470 N
New residence - Building 5, Unit 1, Plan C
2633
6/29/2016
City of Moab
Residential
New construction
648 W 470 N
New residence - Building 5, Unit 2, Plan B
2634
6/29/2016
City of Moab
Residential
New construction
644 W 470 N
New residence - Building 5, Unit 3, Plan B
2635
6/29/2016
City of Moab
Residential
New construction
640 W 470 N
New residence - Building 5, Unit 4, Plan C
2621
6/13/2016
City of Moab
Residential
Modular home
396 & 398 Loveridge
New residence - duplex
2651
8/11/2016
City of Moab
Residential
New construction
1136 E Bonita St
New residence - Valley View - Model B
2647
7/21/2016
City of Moab
Residential
New construction
1079 E Bonita St
New residence - Valley View - Model B
2645
8/1/2016
City of Moab
Residential
New construction
1095 E Bonita St
New residence - Valley View - Model B
2644
7/21/2016
City of Moab
Residential
New construction
1103 E Bonita St
New residence - Valley View - Model B
2643
7/21/2016
City of Moab
Residential
New construction
1111 E Bonita St
New residence - Valley View - Model B
2642
7/21/2016
City of Moab
Residential
New construction
1119 E Bonita St
New residence - Valley View - Model B
2646
7/21/2016
City of Moab
Residential
New construction
1087 E Bonita St
New residence - Valley View - Model C
2650
7/21/2016
City of Moab
Residential
New construction
1116 E Bonita St
New residence - Valley View - Model D
2649
7/21/2016
City of Moab
Residential
New construction
1110 E Bonita St
New residence - Valley View - Model D
2648
8/1/2016
City of Moab
Residential
New construction
1073 E Bonita St
New residence - Valley View - Model D
9/12/2016
Grand County
Commercial
New construction
1030 S Bowling Alley Ln
Modular building
9/26/2016
Grand County
Commercial
Utilities
1151 S Hwy 191
Six RV hookups
7427
6/25/2013
Grand County
Commercial
New construction
2176 S Hwy 191
Warehouse
7841
12/11/2015
Grand County
Commercial
New construction
3071 S Hwy 191
Storage/shop
7994
9/30/2016
Grand County
Residential
Remodel
3126 S Spanish Valley Dr
Change of use/ADU
7711
3/11/2015
Grand County
Residential
Remodel
1805 S Shumway Ln
Change of use/remodel
10/19/2016
Grand County
Residential
Modular home
2449 E San Jose Rd
New residence - modular home
10/20/2016
Grand County
Residential
New construction
780 Palisade
New residence
10/13/2016
Grand County
Residential
New construction
11B S Village Loop
New residence
10/13/2016
Grand County
Residential
New construction
11A S Village Loop
New residence
10/13/2016
Grand County
Residential
New construction
18B S Village Loop
New residence
10/13/2016
Grand County
Residential
New construction
18A S Village Loop
New residence
Page: 2 of 4
10/4/2016
Grand County
Residential
New construction
2921 E Desert Rd
New residence
8/17/2016
Grand County
Residential
New construction
1366 West Kayenta Dr
New residence
9/26/2016
Grand County
Residential
New construction
4370 Blu Vista Dr
New residence
10/4/2016
Grand County
Residential
New construction
2911 E Desert Rd
New residence - accessory dwelling unit
10/3/2016
Grand County
Residential
New construction
2511 E Redcliff Rd, #2
Redcliff Condominiums - Bldg 2 12 units
7302
3/15/2012
Grand County
Residential
New construction
2464 Spanish Valley Dr
New residence
7540
3/24/2014
Grand County
Residential
New construction
4058 Mountain Ct
Shop/ADU
7681
7/29/2015
Grand County
Residential
New construction
1888 S Desert Hills Dr
Garage/ADU
8008
10/11/2016
Grand County
Residential
New construction
3853 Red Valley Cir #11-A8
New residence
8007
10/11/2016
Grand County
Residential
New construction
3853 Red Valley Cir #11-A7
New residence
8006
10/11/2016
Grand County
Residential
New construction
3853 Red Valley Cir #11-A6
New residence
7988
9/23/2016
Grand County
Residential
New construction
3853 Red Valley Cir #10-A5
New residence
7987
9/23/2016
Grand County
Residential
New construction
3853 Red Valley Cir #10-A4
New residence
7986
9/23/2016
Grand County
Residential
New construction
3853 Red Valley Cir #10-A3
New residence
8002
10/11/2016
Grand County
Residential
New construction
3853 Red Valley Cir #11-A2
New residence
8001
10/11/2016
Grand County
Residential
New construction
3853 Red Valley Cir #11-Al
New residence
7991
9/23/2016
Grand County
Residential
New construction
3853 Red Valley Cir #10-A8
New residence
7990
9/23/2016
Grand County
Residential
New construction
3853 Red Valley Cir #10-A7
New residence
7989
9/23/2016
Grand County
Residential
New construction
3853 Red Valley Cir #10-A6
New residence
7988
9/23/2016
Grand County
Residential
New construction
3853 Red Valley Cir #10-A5
New residence
7987
9/23/2016
Grand County
Residential
New construction
3853 Red Valley Cir #10-A4
New residence
7986
9/23/2016
Grand County
Residential
New construction
3853 Red Valley Cir #10-A3
New residence
7985
9/23/2016
Grand County
Residential
New construction
3853 Red Valley Cir #10-A2
New residence
7984
9/23/2016
Grand County
Residential
New construction
3853 Red Valley Cir #10-A1
New residence
7998
10/4/2016
Grand County
Residential
New construction
3998 Chapman Ln
New residence
7976
9/2/2016
Grand County
Residential
New construction
20 Desert Wind Dr
New residence
7975
9/2/2016
Grand County
Residential
New construction
19 Desert Wind Dr
New residence
7974
9/2/2016
Grand County
Residential
New construction
18 Desert Wind Dr
New residence
7973
9/2/2016
Grand County
Residential
New construction
17 Desert Wind Dr
New residence
7983
9/22/2016
Grand County
Residential
New construction
4144 E Moffitt Ln
New residence
7963
8/10/2016
Grand County
Residential
New construction
1381E Spanish Valley Dr
New residence - accessory dwelling unit
7944
7/21/2016
Grand County
Residential
New construction
2251 S Rio Verde
New residence
7947
7/22/2016
Grand County
Residential
New construction/straw
1140 E San Juan Dr
New residence
7942
_ 7/7/2016
Grand County
Residential
New construction
2136 E Wagon Trail Rd
New residence
7971
8/31/2016
Grand County
Residential
New construction
4308 Blu Vista Dr
New residence
7935
6/21/2016
Grand County
Residential
New construction
4175 E Easy St
New residence
7931
6/13/2016
Grand County
Residential
New construction
2250 S Arena Raja
New residence
7915
5/24/2016
Grand County
Residential
New construction
1081 Wagner Ave
New residence
7911
5/12/2016
Grand County
Residential
New construction
4631 S Pueblo Verde Dr
New residence
7903
4/25/2016
Grand County
Residential
New construction
4293 Blu Vista Dr
New residence
7937
6/23/2016
Grand County
Residential
New construction
3171 George White Rd
New residence
7908
5/2/2016
Grand County
Residential
New construction
4194 E Lipizzan Jump
New residence
7893
4/1/2016
Grand County
Residential
New construction
4264 Valle Del Sol Dr
New residence
7855
1/15/2016
Grand County
Residential
Addition/Remodel
1081 N Kayenta Dr
New residence
7848
12/22/2015
Grand County
Residential
New construction
966 W Westwood
New residence
7856
1/20/2016
Grand County
Residential
New construction
3257 Far Country Dr
New residence
7831
11/10/2015
Grand County
Residential
New construction
3862 S Desert Willow Cir #9-A6
New residence
7830
11/10/2015
Grand County
Residential
New construction
3862 S Desert Willow Cir #9-A5
New residence
Page: 3 of 4
7829
11/10/2015
Grand County
Residential
New construction
3862 S Desert Willow Cir #9-A4
New residence
7827
11/10/2015
Grand County
Residential
New construction
3862 S Desert Willow Cir #9-A2
New residence
7826
11/10/2015
Grand County
Residential
New construction
3862 S Desert Willow Cir #9-Al
New residence
7858
1/22/2016
Grand County
Residential
New construction
2726 Old City Park Rd
New residence
7759
6/5/2015
Grand County
Residential
New construction
3862 S Desert Willow Cir #8-A6
New residence
7756
6/5/2015
Grand County
Residential
New construction
3862 S Desert Willow Cir #8-A3
New residence
7837
12/7/2015
Grand County
Residential
New construction
2070 E Munsey Dr
New residence w/ADU
7863
2/3/2016
Grand County
Residential
New construction
821 & 823 S 400 E
New residence w/ ADU
7683
1/30/2015
Grand County
Residential
Permit renewal
3270 Rimrock Rd
New residence w/ADU final CO
7925
6/6/2016
Grand County
Residential
New construction
2511 E Redcliff Rd, #5
Redcliff Condominiums - Bldg 5
Page: 4 of 4