Loading...
HomeMy Public PortalAboutAddition, Deck, Porch ChecklistBUILDING PERMIT APPLICATION CHECKLIST FOR ADDITIONS, DECKS, PORCHES, WHEN BUILDING FOOTPRINT IS EXPANDING 1. (3) Sets of plans* (with elevations and framing details). Applications for additions must include proposed and existing floor plans of the entire building, Stamped by Registered Design Professional when required, (Architect or Engineer), *One (1) large set (18’ x 24” or larger) and two (2) 11”x17.” FLOOR PLANS MUST INCLUDE LOCATION OF ALL REQUIRED FIRE PROTECTION SYSTEMS, HEATING SYSTEM COMPONENTS AND STORAGE AREAS BEING ADDED. (NOTE: Entire Fire Protection System must be upgraded to current code if a bedroom is being added). A COPY OF THE PLAN WILL BE FORWARDED TO THE BREWSTER FIRE DEPARTMENT FOR REVIEW. 1. (1) Site Plan (drawn and stamped by surveyor or engineer). Include location of existing and proposed setbacks, all utilities, lot coverage calculations, setbacks, all overlay districts 2. Energy Calculation (IECC 2012 ResCheck) Include # of Square Feet and Window Ratings 3. Septic Permit or Waiver Issued by Brewster Health Dept. (if applicable) – (Filed Separately) 4.MA Checklist for Compliance (780 CMR 5301.2.1.1) to meet Wind Code Requirements 5.Copy of Current Worker’s Compensation Insurance Certificate (if applicable) 6.Copy of Current MA C.S.L. & H.I.C. Registration (if applicable), signed Homeowner Authorization Form or completed Homeowner’s License Exemption Certificate 7.Completed and signed Debris Disposal Affidavit (State Requirement) 8.Copy of MA Construction Supervisor’s license and Home Improvement Contractor’s Registration, with numbers and expiration dates, or Homeowners Exemption Certificate and Affidavit 9.Copy of Worker’s Compensation Certificate of Insurance 10.RECORDED COPY of Conservation Commission Order of Conditions or copy of Negative Determination documents (if applicable). (NOTE: Any construction within 100 ft. of a Conservancy District is under the jurisdiction of the Conservation Commission.) 11. RECORDED COPY of ZBA Special Permit or Variance, or Planning Board Statement of Conditions (if applicable) NOTE: A FOOTING FORM INSPECTION IS REQUIRED ON ALL SONOTUBE INSTALLATIONS. You must call the Building Department to schedule your inspection before concrete is poured. Failure to do so will result in a failed inspection, and excavation of all poured footings. Please contact the Brewster Building department if you have any questions regarding the above requirements. BBD Application Checklist Additions 1/10/2022