HomeMy Public PortalAbout2010-17 Approving work authorization for Tetra Tech, Inc re West Wood Drive Traffic Calming ProjectRESOLUTION NO. 2010-17
A RESOLUTION OF THE VILLAGE COUNCIL OF THE
VILLAGE OF KEY BISCAYNE, FLORIDA, APPROVING
WORK AUTHORIZATION FOR THE SERVICES OF THE
FIRM OF TETRA TECH, INC. ("TETRA TECH");
PROVIDING FOR TETRA TECH TO CONDUCT DATA
COLLECTION, CONDUCT REVIEW MEETINGS, PREPARE
CONSTRUCTION DOCUMENTS, PROVIDE BIDDING
SERVICES, AND PERFORM CONSTRUCTION
ADMINISTRATION/INSPECTION SERVICES FOR THE
WEST WOOD DRIVE TRAFFIC CALMING PROJECT;
PROVIDING FOR IMPLEMENTATION; PROVIDING FOR
EFFECTIVE DATE.
WHEREAS, pursuant to Resolution No. 98-34, the Village of Key Biscayne (the "Village")
has previously entered into a series of continuing contracts with engineering and architecture firms
for necessary services; and
WHEREAS, the engineering, architecture and planning firm of Tetra Tech, Inc., formerly
known as Williams, Hatfield, & Stoner, Inc. ("Tetra Tech"), is under a continuing contract to the
Village as authorized by Resolution No. 98-34, and has provided professional services to the Village
on several projects in a timely and efficient manner; and
WHEREAS, the Village finds that it is in the best interest of the Village to utilize Tetra Tech
for the purpose of conducting data collection, conducting review meetings, preparing construction
documents, providing bidding services, and performing construction administration/inspection
services for the West Wood Drive Traffic Calming Project (the "Project") in accordance with the
attached Work Authorization and with the Village Manager's memorandum, which accompanies this
Resolution.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE VILLAGE
OF KEY BISCAYNE, FLORIDA, AS FOLLOWS:
Section 1. Recitals Adopted. That each of the recitals stated above is hereby adopted
and confirmed.
Section 2. Work Authorized, Specification of Funds. That pursuant to the existing
continuing contract between Tetra Tech and the Village, the performance of additional engineering
and related services (the "Engineering Services"), as described above and as described in the
attached Work Authorization, dated April 29, 2010, is hereby approved and authorized for the
Project, subject to the funding source and any other limitations which are set forth in the above
referenced Village Manager's memorandum.
Section 3. Work Authorization Approved.
A. That the Village Manager is hereby authorized to execute the Work Authorization,
in substantially the form attached hereto, for the accomplishment of the Engineering Services which
are authorized hereunder, once approved by the Village Attorney as to form and legal sufficiency.
B. That the total fees payable pursuant to the Work Authorization shall not exceed
Thirty -Four Thousand, Four Hundred Seven and 00/100 ($34,407) Dollars, unless further authorized
by the Village Council.
Section 4. Implementation. That the Village Manager is hereby authorized to take any
and all action which is necessary to implement the purposes of this Resolution and the Work
Authorization.
Section 5. Effective Date. That this Resolution shall be effective immediately upon
adoption hereof.
PASSED AND ADOPTED this 1 lth day of May 2010.
2
MAYOR ROBERT L. VERNON
CONCHITA H. ALVAREZ, MMC, VILLAGE CLERK
APPROVED AS TO FORM AND LEGAL SUFFICIE
VILLAGE ATTORNEY
C:\OFFICEIWPWIN\RESO\2010\Approving Work for Services of Tetra Tech for West Wood Traffic Calming (2010) rev.rtf
3
VILLAGE OF KEY BISCAYNE
Village Council
Robert L. Vernon, Mayor
Enrique Garcia, Vice Mayor
Michael W. Davey DATE:
Robert Gusman
Michael E. Kelly TO:
Jorge E. Mendia
Thomas Thornton
Village Manager
Genaro "Chip" Iglesias RE:
RECOMMENDATION
Office of the Village Manager
MEMORANDUM
April 27, 2010
Honorable Mayor and Members of the Villa • - Counc
FROM: Genaro "Chip" Iglesias, Village Mana
WEST WOOD DRIVE TRAFFIC CALMING
It is recommended that the Village Council approve the proposal submitted by Tetra
Tech for engineering services in the amount of $34,407.00. The scope of work included
in this proposal is for the engineering design and construction management of West
Wood Drive Traffic Calming Improvements.
BACKGROUND
At the April 13th, 2010 Council Meeting Tetra Tech provided Council with three proposed
plans depicting different combinations of traffic devices at four intersections. Council
approved Option 2 with the following four devices:
• Speed table between Curtiswood Road and Allendale Road
• Speed table between Warren Road and Hampton Lane
• Traffic Circle at Ridgewood Road
• Decorative intersection at Fernwood with choked -down curbing and enhanced
landscaping.
This project was originally packaged for bid under the West Heather Drive & West
Wood Drive Traffic Calming Improvements & Sidewalk. The traffic calming portion for
West Wood Drive was not installed at the time of construction in the year 2000.
The duration of this project will be accomplished within thirty nine weeks of acceptance
of this proposal.
The funding for this project will be obtained from the Capital Outlay Master Plan
Initiatives.
88 West McIntyre Street • Suite 210 • Key Biscayne, Florida 33149 • (305) 365-5500 • Fax (305) 365-8936
MISSION STATEMENT: "TO PROVIDE A SAFE, QUALITY COMMUNITY ENVIRONMENT FOR ALL ISLANDERS THROUGH RESPONSIBLE GOVERNMENT."
www.keybiscayne.fl.gov
PROPOSAL FOR PROFESSIONAL ENGINEERING SERVICES
VILLAGE OF KEY BISCAYNE
WEST WOOD DRIVE - TRAFFIC CALMING
INTRODUCTION:
Tetra Tech (Tt) is pleased to provide professional engineering services for the above
referenced project. This project was originally packaged for bid under the West Heather
Drive & West Wood Drive Traffic Calming Improvements & Sidewalk. The traffic
calming portion for West Wood Drive was not installed at the time of construction in the
year 2000. The revised traffic calming design shall include four devices: a speed table
between Curtiswood Drive and Allendale Road; a speed table between Warren Lane and
Hampton Lane; a traffic circle at the intersection of Ridgewood Road; and a decorative
intersection at Fernwood Road with choked -down curbing and enhanced landscaping.
The scope of work for the revised design included in this proposal is as follows:
SCOPE OF SERVICES:
Task 1-- Data Gathering
Tetra tech will gather the necessary data by field verifying topographic features
including trees, driveways, and landscape improvements in the area where the
traffic device will be located and coordinating with Sanitary Sewer Project
engineers to obtain latest as -built information.
Task 2 — Meetings
For the purpose of this proposal, Tt has budgeted to conduct two (2) review
meetings with the Village during the course of preparing the design to the Traffic
Calming Plans and one (1) meeting to present to the Village Council. Should the
Village request any further meetings, Tt will amend this agreement as needed to
cover the additional time.
Task 3 - Construction Documents
Tetra Tech will update and revise the Civil Plans and Specifications accordingly
for this project. This proposal also includes preparation of Opinion of Probable
Construction Cost. These plans will include the following sheets:
• Cover Sheet, Index of Drawings (1 sheet)
• Traffic Device Layout (5 sheets)
• Details (2 sheets)
• Signing and Marking Plans & Details (1 sheet)
Total 9 sheets
Tetra Tech
Village of Key Biscayne Page 1
West Wood Drive — Traffic Calming
Task 4 — Bidding & Award Services
Tetra Tech will facilitate a pre -bid conference and the bid opening. Tetra Tech
will assist the Village in evaluating the Bids and recommending a bidder to the
Village.
Task 5 - Construction Services
Tetra Tech will provide construction administration and inspections for this
project. These services will include being the primary contact for the Contractor
and the following services:
• facilitate pre -construction meeting
• review shop drawings
• review pay requests
• respond to Requests For Information (RFI)
• regular inspections
• final inspection
• preparation of final change order
SERVICES NOT INCLUDED:
• Permitting
• Geotechnical
• Surveying
PROPOSED FEE:
Tetra Tech proposes to accomplish the work for a lump sum fee of $34,407.00. Construction
Services can be provided by Tetra Tech on an hourly basis. Our rates will be per the attached
Tetra Tech billing rate schedule. The breakdown of our fee is as follows:
Task 1— Data Gathering
Task 2 — Meetings
Task 3 — Construction Documents
Task 4 - Bid Related Services
Tales 5 - Construction Services
$ 1,500.00
$ 3,000.00
$15,907.00
$ 2,000.00
$12,000.00
Total $34,407.00
Tetra Tech
Village of Key Biscayne Page 2
West Wood Drive — Traffic Calming
PROPOSED SCHEDULE:
The above described work will be accomplished within 39 weeks of acceptance of this proposal
with the break down as follows:
Task 1 - Data Gathering
Task 2 - Meetings
Task 3 - Preparation of Construction Documents
Task 4 - Bidding
Notice to Proceed
Construction Substantially Complete
Construction Final Complete
From Acceptance
30 days
60 days
90 days
150 days
240 days
270 days
If this proposal is acceptable to you, please sign below and return one copy to our office so that
we may proceed. Thank you for the opportunity to serve you.
ACCE
ED AND AGREED
VILL - E OF KEY B
Genaro Chip Igle
Village Manager
Date: //1//ife
TETRA TECH
Rod Cashe, P.E.
Senior Project Manager
Date:
Tetra Tech
Village of Key Biscayne
West Wood Drive — Traffic Calming
Page 3
UMBRELLA
TREE
p1/450"'
4.5' CONC
WALL
•
\• ---
-
\ f
6' CONC WALL
EXIST. SIDEWALK
N.T.S.
Drawing Description
TETRA TECH
www.tetratech.com
6 " WOOD FENCE
6'x3'-1 1/4" CONC. SLAB
WOOD PILES
a_
W WOO
}
7220 NW 36th STREET, SUITE 408
MIAMI, FL 33166
PHONE: 305-632-8321
OPTION 2 -CONCEPTUAL
SPEED TABLE
CURTISWOOD RD-ALLENDALE RD
VILLAGE OF KEY BISCAYNE
W WOOD DR TRAFFIC CALMING
Project No.: 200-15460-10001
Date:
April 29, 2010
Designed By: AMVF
Figure
1
N.T.S.
6' WOOD
FENCE
6' CONC
WALL
BAN YON
TREE X I
6' WOOD
FENCE
----'--------- EX/ST. SIDEWALK
m
TETRA TECH
www.tetratech.com
7220 NW 36th STREET, SUITE 408
MIAMI, FL 33166
PHONE: 305-632-8321
Drawing Description
OPTION 2 -CONCEPTUAL
SPEED TABLE
'WARREN LN-HAMPTON RD
VILLAGE OF KEY BISCAYNE
W WOOD DR TRAFFIC CALMING
Project No.: 200-15460-10001
Date: April 29, 2010
Designed By: AMVF
Figure
2
1•
"x4.-5"
SLAB
/N LINK
CONC
'ALL
WOOD UTILITY
POLE
cc
7
N.T.S.
74-z
CO/140U/T.
W WOOD DR
CONC. WA
TETRA TECH
www.tetratech.com
7220 NW 36th STREET, SUITE 408
MIAMI, FL 33166
PHONE: 305-632-8321
Drawing Description
OPTION 2 -CONCEPTUAL
TRAFFIC CIRCLE
RI DG EWOOD RD
VILLAGE OF KEY BISCAYNE
W WOOD DR TRAFFIC CALMING
Project No.: 200-15760-10001
Date:
April 29, 2010
Designed By:
AMVF
FIGURE
3
N.T.S.
n'IST. SIDEWALK
CURB
6' WOOD FENCE
TETRA TECH
www.tetratech.corn
4--
�0,
P
S
Drawing Description
OPTION 2 -CONCEPTUAL
DECORATIVE CIRCLE
FERNWOOD RD
G\'
FP
v
v
EXIST. SIDEWALK
EXIST. SIDEWALK
IREMMEMEM
Project No.: 200-15760-10001
Date: April 29, 2010
Designed By: AMVF
FIGURE
7220 NW 36th STREET, SUITE 408
MIAMI, FL 33166
PHONE: 305-632-8321
VILLAGE OF KEY BISCAYNE
W WOOD DR TRAFFIC CALMING
4
I