Loading...
HomeMy Public PortalAboutWater Treatment Feasibility Study 2019TOWN OF GULF STREAM Engineering Services for Wastewater Feasibility Study Update DATE: October 18, 2019 BACKGROUND The Town's service area is mostly un-sewered, with wastewater currently treated through on-site septic tanks or treatment systems and subsequently discharged to associated drain field systems. There is an area on the north side of the Town's service area, near Town Hall, which is currently serviced by a low pressure sewer system which collects and transfers flow to the City of Boynton Beach for subsequent treatment and disposal. DESCRIPTION OF WORK In 2002, Mathews Consulting (MC) completed a "Wastewater Feasibility Study" for the Town which evaluated the feasibility of installing a wastewater collection system throughout the Town's service area. The Town has requested that Baxter & Woodman, Inc. (CONSULTANT) update that report to reflect today's current design standards and construction costs. SCOPE OF WORK CONSULTANT proposes to provide the following services: Task No. 1— Evaluation of Service Area and Wastewater Flows CONSULTANT shall evaluate the service area, including the type and number of units within the existing service area. CONSULTANT shall consider future growth and build -out conditions to establish future service area conditions, number and type of units. CONSULTANT shall estimate wastewater flows for existing and future conditions, including average daily flow and peak hour flow rates. Specific tasks include the following: • Meet with Town to discuss service area, population served and property characteristics. • Conduct field inspection of service area, including potential tie-in locations with the City of Delray Beach and the City of Boynton Beach. • Collect as -built information for proposed sewer areas including tie-in points. • Research property records and verify house/building locations/characteristics. • Check water records for water consumption to assist with the development of potential wastewater generation rate estimates. • Develop flow projections for existing and future conditions. • Evaluate the use of conventional gravity vs. low pressure system, including advantages/disadvantages of each (i.e. construction and operation of systems for the specific area). • Write up task results and provide flow tables. Page I of 8 Task No. 2 — Preliminary System Layout and Design CONSULTANT shall provide preliminary layout and design of wastewater collection systems to service the Town's service area. CONSULTANT shall consider two (2) flow options for the collection system: 1) Transfer all flow to the City of Delray Beach Collection System 2) Transfer part of the flow to the City of Delray Beach and part of the flow to the City of Boynton Beach collection system. CONSULTANT shall coordinate with each of the City's to determine capacity of their system to accept the Town's wastewater flow. CONSULTANT shall consider two (2) design options for the collection system: 1) Conventional gravity system with lift stations 2) Low pressure system Preliminary layout shall include schematic of system routing, pipe sizing, pump station capacity, and acceptable tie-in locations at neighboring systems. It is assumed that a master wastewater flow meter will be provided at the connection point with the neighboring City. Specific tasks include the following: • Meet with the City of Delray Beach and the City of Boynton Beach to verify possible tie- in locations, restrictions, capacity limitations, etc. • Update system layout for Option 1 (flow to Delray Beach) • Update system layout for Option 2 (flow to Delray Beach and to Boynton Becah) • Calculate required pipe sizes and invert elevations for Option 1 • Calculate required pipe sizes and invert elevations for Option 2 • Update system layout for low pressure system. • Calculate design requirements for proposed lift stations. Identify pump, mechanical and electrical requirements. • Check capacity of Delray tie-in locations (Option 1 and 2). Calculate new conditions with proposed flow. • Check capacity of Boynton tie-in locations (Option 2). Calculate new conditions with proposed flow. • Write up task results. Task No. 3 — Preliminary Cost Evaluation CONSULTANT shall provide preliminary capital cost evaluation for the proposed system layouts and flow routing options. Specific tasks to be completed: • Contact the City of Delray Beach and the City of Boynton Beach to identify applicable services fees and rates. • Perform material quantity take -offs and prepare costs summary tables. Page 2 of 8 Contact vendors and obtain costs for mechanical/electrical equipment. Write up task results. Task No. 4 — Regulatory Impacts CONSULTANT shall identify potential regulatory impacts to constructing a new wastewater collection system and tying into a neighboring City. Impacts that will be considered include required permitting and associated fees, and contractual obligations that will be imposed by the neighboring City, if any. Specific tasks to be completed: • Research all regulatory impacts of project, including construction permits, operation permits, and contractual obligations with neighboring cities. • Correspond with FDOT to identify requirements and/or restrictions associated with installing wastewater systems adjacent to State road. • Write up task results. Task No. 5 — Final Report CONSULTANT shall develop a final report documenting results of task activities. Three (3) copies of the DRAFT report shall be submitted to the Town for review. CONSULTANT shall attend a review meeting with Town staff to discuss report and to obtain Town comments. CONSULTANT shall also prepare and present a PowerPoint presentation to the Town Commission. The presentation shall include a summary of findings of the Wastewater Feasibility Study. Upon receipt of Town comments, CONSULTANT shall finalize the report and submit four (4) FINAL copies plus one (1) PDF copy to the Town. ASSUMPTIONS Work described herein is based upon the assumptions listed below. If conditions differ from those assumed in a manner that will affect schedule of Scope of Work, CONSULTANT shall advise Town in writing of the magnitude of the required adjustments. Changes in completion schedule or compensation to CONSULTANT will be negotiated with Town. 1. Town shall provide CONSULTANT all background information regarding number of units, person per household and estimated water usage for the Town's service area. 2. Town shall provide information relative to future build -out conditions. 3. Scope of services does not include providing recommendations for project financing or identification of debt service and/or rate structure to support financing the program. Page 3 of 8 ADDITIONAL PROVISIONS • The services described herein will be provided in accordance with the current generally accepted standards of the engineering profession. Reasonable material changes between work tasks, or level of effort actually required and those budgeted, may serve as a basis for modifying this scope and budget, as mutually agreed to between CONSULTANT and the Town. • CONSULTANT is entitled to rely upon the accuracy of historical and existing data and in provided by the Town and others without independent review and verification. CONSULTANT is not responsible for the means, methods, sequences, techniques or procedures of Town and vendor operations or for safety precautions and programs. • Any Opinion of the Construction Cost prepared by CONSULTANT represents its judgment as a design professional and is supplied for the general guidance of Town. Since CONSULTANT has no control over the cost of labor and material, or over competitive bidding or market conditions, CONSULTANT does not guarantee the accuracy of such opinions as compared to contractor bids or actual costs to the Town. DELIVERABLES TASKS DELIVERABLES QUANTITY 5 Wastewater Feasibility DRAFT Report 3 — Hard Copies Study FINAL Report 4 — Hard Copies 1 —Electronic i.e. PDF) PROJECT SCHEDULE The duration and completion times of all tasks are summarized below and as indicated in the project schedule shown in Attachment A: Completion Time (Calendar Days) from Engineering Services Task Duration Notice to Proceed* Task 1 —Evaluate Service Area & WW Flows 45 days 45 days Task 2 — Preliminary System Layout 15 days 60 days Task 3 — Preliminary Cost Evaluation 15 days 75 days Task 4 — Regulatory Impacts 10 days 85 days Task 5 — Final Report - DRAFT Report 30 days 115 days - Town Review** 30 days 145 days - FINAL Report 10 days 155 days Total Project Time Period: 155 Calendar Days *Assumes Town provides requested information within 30 days of Notice to proceed **Includes time to present summary of report findings at Town Commission meeting on March 13, 2020 Page 4 of 8 SUMMARY OF PROPOSED FEES Proposed labor costs and associated expense for engineering services are tabulated below. Engineering Services Fees (Lump Sum) Task No. 1 - Evaluate Service Area & WW Flows $ 6,350.00 Task No. 2 - Preliminary System Layout $12,554.00 Task No. 3 - Preliminary Cost Evaluation $ 4,241.00 Task No. 4 - Regulatory Impacts $ 2,333.00 Task No. 5 - Final Report $ 6,037.00 Reimbursables $ 750.00 Total Engineering Services $32,265.00 Additional Services - The fee for Additional Services shall be billed using the Hourly Rate Schedule contained in Attachment B. Page 5 of 8 IN WITNESS WHEREOF, the parties have made and executed this Agreement on the respective dates under each signature. TOWN OF GULF STREAM, through an authorized official of the Town and Baxter & Woodman, Inc. signing by and through Jason A. Pugsley (Vice President) duly authorized to execute same. TOWN OF GULF STREAM: BAXTER & WOODMAN, Inc.: Jagoin A. Pugsley, P.E., Vicent Date: f �/ Date: ///f-7//9 Page 6 of 8 ATTACHMENT A Project 2019 2020 Oct Nov Dec Jan Feb Mar Apr May NTP (November 11, 2019) Kick -Off Meeting 0 Evaluate Service Area & WW Flows (45 days) Preliminary System Layout (15 days) Preliminary Cost Evaluation (15 days) Regulatory Impacts Review (10 days) DRAFT Report Submission (30 days) (3/5/2020) Town Review (30 days)* FINAL Report Submission (10 days) (4/14/2020) *Includes time to present summary of findings at Town Commision meeting on March 73, zozo Page 7 of 8 Attachment B Town of Gulfstream 2019 Wastewater Feasibility Study Baxter & Woodman Fee Table Task No. Task Description Principal Engineer $165 Sr Project Engineer $150 Engineer $112 Labor Classification and Hourly Rates Sr. Construction Sr. Eng. Inspector Tech. Cadd $110 $110 $95 Clerical $68 Total Labor Sub - Consultant Services 1.0 Evaluate Service Area and WW Flows Meet with Town to discuss area, population & properties 2 2 $524 Conduct field inspection 4 $448 Collect as -built information 2 4 1 1 1 $748 Research property records 2 5 $860 Renew water records De%elop wastewater flow projections existign & future 2 1 4 4 $748 $598 E%eluate use of grauty vs. low pressure Task writeup 1 1 3 2 6 6 $1,287 $1,137 Subtotal Task 1 2 14 35 0 0 0 0 $6,350 $0 2.0 Preliminary System Layout and Design Meet with Delray & Boynton for tie-in requirements 4 4 $1,048 Update system layout Option 1 1 1 6 1 8 $1,582 Update system layout Option 2 1 6 8 $1,582 Calculate pipe size & imerts Option 1 1 8 1 $1,046 Calculate pipe size & inverts Option 2 1 8 $1,046 Update system layout for low pressure system Calculate design requirements for lift stations 1 1 4 4 8 8 $1,358 $1,661 Check capacity of Delray tie-in location Check capacity of Boynton tie-in location 2 2 6 6 $972 $972 Task writeup 1 3 6 $1,287 Subtotal Task 2 2 20 62 0 0 24 0 $12,554 $0 3.0 Preliminary Cost Evaluation Contact Delray & Boynton for seNce fees & rates 1 1 4 1 1 $598 Perform quantity takeoff & cost estimates Contact %endors & obtain meth/elect equipment costs 4 4 8 8 $1,496 $1,496 Task writeup Subtotal Task 3 1 1 1 10 3 23 0 0 0 0 $651 $4,241 $0 4.0 Regulatory Impacts Research and summarize regulatory impacts 2 8 $1,196 Identify FDOT requirements and restrictions 1 2 $374 Task writeup 1 1 4 1 $763 Subtotal Task 4 1 4 14 0 0 0 0 $2,333 $0 5.0 Final Report Compile DRAFT Report Retiew meeting with Town Staff 2 4 3 8 3 4 4 $2,478 $786 Prepare and present findings to Town Commission Prepare and issue FINAL Report 2 1 4 1 6 4 2 4 $1,738 $1,035 Subtotal Task 5 5 12 21 0 0 4 10 $6,037 $0 Labor Subtotal Hours 11 60 155 0 0 28 10 Labor Subtotal Costs Labor Total Costs $1,815 $31,515 $9,000 $17,360 $0 $0 $2,660 $680 $31,515 $0 Subconsultant Costs Total $0 Subconsultant Multiplier 1.1 Subconsultant Total $0 Reimbursable Expenses $750 Project Total $32,265 Page 8 of 8