HomeMy Public PortalAbout053-2022 - Design Memo August 1, 2022 Mr. Elijah D. Welch, P.E. District Engineer Richmond Sanitary District City of Richmond 2380 Liberty Avenue Richmond, Indiana 47374 RE: Midwest Industrial Park Interceptor Project Final Design, Field Work, Permitting, Bidding, and Construction Engineering Services Dear Mr. Welch: Based on our attached anticipated scope of services, Commonwealth Engineers (CEI) has prepared a fee estimate for your review and use for the Midwest Industrial Park Interceptor Project. The proposed scope of services and fee estimate have been assembled assuming CEI provides final design, field work, permitting, bidding, and construction engineering services for the project with the assistance of several specialized sub-consultants such as SME for geotechnical engineering services, Cardno for wetland delineation, and Apex for traffic engineering services. Commonwealth has successful, long-standing partnerships with these specialized sub-consultants. The Project involves approximately 13,600 LF of gravity sanitary sewer from the existing Midwest Industrial Park Lift Station (which will be decommissioned) to the existing Round Barn Interceptor. The project will provide critical sanitary infrastructure to support significant growth in the Midwest Industrial Park. CEI has estimated a total project cost of $1,351,816 based upon our man-hour projections and anticipated project costs. The following is a breakdown of the estimated fees for your consideration. Final Design .................................................................. $ 826,980 (Lump Sum) Field Work & Easement Descriptions .................................................................. $ 286,222 (Hourly) Permits .................................................................. $ 24,919 (Lump Sum) Bidding & Negotiating .................................................................. $ 47,303 (Hourly) Construction Engineering .................................................................. $ 126,392 (Hourly) Owner Authorized Allowance .................................................................. $ 40,000 (Hourly) Total Project Cost .............................................................. $1,351,816 To provide assurance that the proposed fees align with industry standards in the field of water and wastewater engineering, below are several checks. · Typical engineering design fees (excluding permits, field work, bidding, construction engineering, and inspection) range from 6 to 10% of the construction cost estimate. Below is a summary of the construction cost estimates followed by the calculation for the design fee percentage. o Construction Cost Estimate ≈ $12,113,800 o Design Fee Percentage ≈ (100)($826,980)/($12,113,800) ≈ 6.83% · Typical construction engineering design fees range from 1 to 5% of the construction cost estimate depending on the complexity of the project and amount of work that the Owner is willing to take on during construction. Similar to past projects, it is assumed that the District (a) will provide on-site resident project representatives (RPR) services, (b) will take lead on reviewing less complex submittals and requests for information, and (c) will review and recommend the Contractor’s quantities and pay requests. Below is a summary of the construction cost estimate followed by the calculation for the construction engineering fee percentage. o Construction Cost Estimate ≈ $12,113,800 o Construction Engineering Fee Percent ≈ (100)($126,392)/($12,113,800) ≈ 1.04% · Geotechnical field work, surveying filed work, and permits vary based on the nature of each project. Thank you for giving us this opportunity to continue our professional relationship with the Richmond Sanitary District. Should you have any questions, please do not hesitate to call me at (260) 494-3223. Sincerely, COMMONWEALTH ENGINEERS, INC. Brian Desharnais, Ph.D., P.E. bdesharnais@contactcei.com Enclosures: Project Description, Scope of Services, Schedule, Fee Summary/Clarifications, and Itemized Fee Breakdown 8/1/2022 Commonwealth Engineers Inc. PART 1 Project Description, Scope of Services, and Schedule Midwest Industrial Park Interceptor Project Richmond Sanitary District GENERAL: Commonwealth Engineers, Inc. (ENGINEER) shall provide the Richmond Sanitary District (OWNER) with professional engineering services to which this scope of services applies. These services include serving as the District’s professional representative for the Project, providing professional engineering consultation and advice, furnishing civil engineering services, and other customary services incidental thereto. PROJECT DESCRIPTION: The following scope of services has been assembled assuming ENGINEER provides final design, field work, easement descriptions, permits, bidding / negotiating, and construction engineering for the Midwest Industrial Park Interceptor, which includes the components entitled “Long-Term Alternative 3” and “Leg to the West” shown in Figure 1. The component entitled “Long-Term Alternative 3” primarily consists of approximately 12,800 LF of 30-inch gravity sanitary sewer from the existing Midwest Industrial Park Lift Station (which will be decommissioned) to the existing Round Barn Interceptor. The component entitled “Leg to the West” primarily consists of approximately 800-LF of gravity sanitary sewer (size to be determined) from Round Barn Road to the new 30-inch gravity sanitary sewer associated with “Long-Term Alternative 3.” Efforts will be made to minimize construction of the sewer in the floodway and wetlands. Significant easements and tree removal are anticipated. It is also anticipated that the majority of the sewer construction will be open cut, and cost-effective trenchless construction will be considered for targeted areas such as creek crossings and potential wetlands. SCOPE OF SERVICES: 1.0 Meetings, Project Management and Quality Assurance / Quality Control 1.1 Kickoff Meeting: Prepare for and hold kickoff meeting with the OWNER to confirm scope, work plan, lines of communication, and schedule. The kickoff meeting will be held during the data collection phase of the project. Prepare and distribute meeting notes. 1.2 50% Design Meeting: Prepare for and conduct the 50% Design Meeting with the OWNER. Prepare and distribute meeting notes. Perform a field verification review after the 50% submittal to make sure field items are properly shown on the drawings or included in the specifications. 1.3 95% Design Meeting: Prepare for and conduct the 95% Design Meeting with the OWNER. Prepare and distribute meeting notes. Perform a field verification review after the 95% submittal to make sure field items are properly shown on the drawings or included in the specifications. 1.4 Virtual Meetings: Prepare for and conduct up to four (4) Virtual Meetings with the OWNER. Prepare and distribute meeting notes. 8/1/2022 Commonwealth Engineers Inc. 1.5 Project Management: Project management including general correspondence, general coordination with the design / field work / subconsultant team, invoicing, scheduling, and budget maintenance. 1.6 50% Submittal QA/QC: Perform QA/QC on 50% submittal. 1.7 90% Submittal QA/QC: Perform QA/QC on 90% submittal. 1.8 Final Submittal QA/QC: Perform QA/QC on Final submittal. 2.0 50% Design 2.1 Basis of Design Technical Memorandum: Assemble a basis of design for the collection system improvements. Perform design-level hydraulic, structural, geotechnical, and other design computations required for new pipes, trenchless design, and structure modifications. Confirm route and ensure that future collection system improvements are compatible from a connectivity / constructability standpoint. Perform analyses and recommendations on sewer materials. 2.2 50% Drawings: Prepare 50% design drawings. The Drawings will generally include (estimated): Sheets Title Sheet 1 Drawing Index 1 General Location Map 1 General Abbreviations, Symbols, Legends, and Notes 1 General Location Plan and Survey Control 7 Existing and New Structure Data Tables 2 Demolition and Restoration Plan 29 Utility Plan & Profile 32 Structure Details 14 Access Drive Plan 10 Access Drive Cross Section 10 Erosion Control Plan 14 Traffic Control 6 Miscellaneous Details 12 TOTAL 140 2.3 50% Contract Book: Prepare 50% contract book, which includes technical specifications. Standards and material-type specifications used by the OWNER will be incorporated in the technical specifications. 2.4 50% Bid Form and Cost Estimate: Prepare a bid form and 50% design cost estimate. 2.5 50% Submittal Assembly: Submit the following to OWNER: · Geotechnical Report (PDF and 4 hard copies) · Basis of Design Technical Memorandum (PDF and 4 hard copies) · 50% Full-Size 22”x34” and Half Size 11”x17” Drawings (PDF and 1 full-size and 4 half-size hard copies) · 50% Contract Book 8/1/2022 Commonwealth Engineers Inc. (PDF and 4 hard copies) · 50% Bid Form and Cost Estimate (PDF and 4 hard copies) 3.0 90% Design 3.1 90% Drawings: Prepare 90% design drawings. 3.2 90% Contract Book: Prepare 90% contract book, which includes technical specifications. 3.3 90% Bid Form and Cost Estimate: Prepare a bid form and 90% design cost estimate. 3.4 90% Submittal Assembly: Submit the following to OWNER: · 90% Full-Size 22”x34” and Half Size 11”x17” Drawings (PDF and 1 full-size and 4 half-size hard copies) · 90% Contract Book (PDF and 4 hard copies) · 90% Bid Form and Cost Estimate (PDF and 4 hard copies) 4.0 Final Design 4.1 Final Drawings: Prepare Final design drawings. 4.2 Final Contract Book: Prepare Final contract book, which includes technical specifications. 4.3 Final Bid Form and Cost Estimate: Prepare a bid form and Final design cost estimate. 4.4 Final Submittal Assembly: Finalize the drawings for bidding. The final bidding documents will be signed and sealed by the registered Professional Engineer in the State of Indiana. Final deliverable includes the following: · Final Certified Full-Size 22”x34” and Half Size 11”x17” Drawings (PDF and 1 full-size and 4 half-size hard copies) · Final Certified Contract Book (PDF and 4 hard copies) 5.0 Field Work & Easement Descriptions 5.1 Geotechnical Field Work: Perform geotechnical investigation and assemble report for the collection system improvements. It is anticipated that up to 23 bores will be performed ranging in depth from 15 to 40 feet. 5.2 Field Surveying: Supplement existing field survey data as required to define topography and surface features: including baselines, horizontal and vertical locations of underground utilities as provided by the utility companies, apparent property and lot lines based on the Richmond Geographic Information System. Tie the proposed Project layout into existing coordinate systems and vertical monuments. Finalize files for CAD designers. 8/1/2022 Commonwealth Engineers Inc. 5.3 Wetland Delineation and Tree Inventory Survey: Perform a wetland delineation and tree inventory survey (including speciation) for trees over 10-inches in diameter in the project area. 5.4 Easement Descriptions: Prepare up to 20 easement descriptions (permanent or temporary). 6.0 Permits 6.1 IDEM Construction Permit: Prepare and submit IDEM Construction Permit. 6.2 SWPP & Indiana General Erosion Control Permit: Prepare and submit Erosion Control Permit and Stormwater Pollution Prevention Plan (SWPP). 6.3 IDNR Construction in a Floodway Permitting: Prepare construction in a floodway permitting and corresponding IDNR permitting including necessary calculations. 6.4 USACE / IDEM Permitting: Prepare USACE / IDEM permitting. 7.0 Bidding & Negotiating 7.1 Pre-Bid Meeting: Prepare and lead a pre-bid meeting and prepare meeting notes. 7.2 Contractor Questions and Addendums: Respond to Contractors’ questions and prepare and certify addendums. 7.3 Certified Bid Tabulation: Review and evaluate the bids and certify the bid tabulation. 8.0 Construction Engineering The ENGINEER shall assist the OWNER during the construction of this Project. It is assumed that the OWNER (a) will provide on-site resident project representatives (RPR) services, (b) will take lead on reviewing simpler submittals and requests for information, and (c) will review and recommend the Contractor’s quantities and pay requests. The ENGINEER shall perform the following activities on an OWNER defined as-needed basis: 8.1 Pre-Construction Meeting: Prepare for and attend the pre-construction meeting. 8.2 Construction Engineering Assistance: Assist OWNER with reviewing select record drawings, request for information, and change orders. Answer engineering related questions as they pertain to the plan and specifications throughout the construction of the Project. Site visits as needed. 9.0 Owner Authorized Allowance 9.1 Owner Authorized Allowance: For additional work authorized by the OWNER and beyond the above scope of work, such as the optional additional services listed below. OPTIONAL ADDITIONAL SERVICES (Not included in proposed fee): Upon separate written authorization by OWNER and after approval of negotiated fees, ENGINEER can provide additional service such as those listed below. 8/1/2022 Commonwealth Engineers Inc. · Issue the project in multiple phases. · Additional permitting beyond the scoped permits. · Additional bidding and construction engineering beyond the hourly budget. · Contaminated soil testing and / or groundwater monitoring. · Subsurface utility engineering. · Wetland mitigation and/or restoration plans. · Phase I environmental assessment. · Additional workshops, meetings, or site visits. · Conformed to contract drawings. · Record drawings. · Resident project representative inspection. · Post construction monitoring. · Green / sustainable infrastructure design. · Regulatory coordination beyond the scope, such as CSO LTCP updates and coordination with IDEM. · Wage monitoring of contractor during construction. · Archaeological investigation and monitoring. 8/1/2022 Commonwealth Engineers Inc. ESTIMATED SCHEDULE: The Project will be completed under the tentative milestones shown below. This tentative schedule is based on receiving a Notice to Proceed in September 2022 and receiving prompt review and approvals from the OWNER. ITEM TENTATIVE DATE Kickoff Workshop September 2022 Surveying and Geotechnical Field Work September – December 2022 50% Design Services September – February 2023 50% Review Workshop March 2023 95% Design Services & Easement Descriptions March – July 2023 95% Design Review Workshop August 2023 Final Detailed Design Services and Permitting August – December 2023 Bidding Phase January – February 2024 Contract Award March 2024 Construction Engineering Phase April 2024 – October 2025 8/1/2022 Commonwealth Engineers Inc. PART 2 Fee Summary and Clarifications Midwest Industrial Park Interceptor Project Richmond Sanitary District FEE SUMMARY: TASK FEE Final Design (Tasks 1 – 4) $ 826,980 (Lump Sum) Field Work & Easement Descriptions (Task 5) $ 286,222 (Hourly) Permits (Task 6) $ 24,919 (Lump Sum) Bidding & Negotiating (Task 7) $ 47,303 (Hourly) Construction Engineering (Task 8) $ 126,392 (Hourly) Owner Authorized Allowance (Task 9) $ 40,000 (Hourly) Grand Total $ 1,351,816 FEE CLARIFICATIONS: The following clarifications pertain to the fee structure (i.e. lump sum or hourly) for scope items described above in Part 1. 1.0 Lump Sum - Clarifications 1.1 ENGINEER may alter the distribution of compensation between individual tasks noted herein to be consistent with services actually rendered but shall not exceed the total Lump Sum amount unless approved in writing by the OWNER. 1.2 The Lump Sum includes compensation for ENGINEER’s services and services of ENGINEER’s Sub-Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to account for labor, overhead, profit, and Reimbursable Expenses. 1.3 The portion of the Lump Sum amount billed for ENGINEER’s services will be based upon ENGINEER’s estimate of the percentage of the total services actually completed during the billing period. 2.0 Standard Hourly Rates - Clarifications 2.1 ENGINEER may alter the distribution of compensation between individual tasks of the work noted herein to be consistent with services actually rendered but shall not exceed the total estimated compensation amount unless approved in writing by OWNER. 2.2 The total estimated compensation for ENGINEER’s services included in the breakdown by tasks incorporates all labor, overhead, profit, Reimbursable Expenses and ENGINEER’s Sub-Consultants' charges. 2.3 The amounts billed for ENGINEER’s services will be based on the cumulative hours charged to the Project during the billing period by each class of ENGINEER’s employees times Standard Hourly Rates for each applicable billing class, plus Reimbursable 8/1/2022 Commonwealth Engineers Inc. Expenses and ENGINEER’s Sub-Consultants' charges. Standard Hourly Rates are subject to change on July 1 of each year. 3.0 Additional Services - Clarifications 3.1 Additional service provided by ENGINEER can be provided based on the Standard Hourly Rates listed in Part 2, 4.0. Standard Hourly Rates are subject to change on July 1 of each year. 8/1/2022 Commonwealth Engineers Inc. 4.0 Employee Billing Rate Schedule 8/1/2022 Commonwealth Engineers Inc. Figure 1 – Midwest Industrial Park (i.e. Long Term Alternative 3 and Leg to West) Note: Costs Include Construction and Non-Construction Costs ENGINEERING FEE ESTIMATIONPROJECT NAME/DESCRIPTION:Midwest Industrial Park Interceptor ProjectESTIMATE DATE:PROJECT MANAGER:RATE YEAR WORK WILL BE COMPLETED:START DATE:DURATION (MONTHS):Design & Permits (15 months); Bidding & Award (3 months); Construction (18 months)DIRECT LABOR MULTIPLIER:SUB-CONSULTANT ADMINISTRATIVE CHARGE:REIMBURSABLE EXPENSES ADMINISTRATIVE CHARGE: TASK\HOUR SUMMARYTotalPrincipal Principal Principal Project Project Project Project Engineer Designer Designer Env Compl Compliance Clerical Survey Project Total Direct Sub- CostIII II I Manager IV Manager III Manager I Engineer II Intern II Grade IV Grade III Manager Specialist Grade II Manager Surveyor Hours Labor ConsultantExpensesw. MultiplierEMPLOYEE NAMEDesharnais Harner Wilson Burns / Zac WheatleyWaterman / BearmanDryer Utz Dustman Sanford JanneckTASKTASK 1 - MEETINGS, PM, & QA / QC--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- 1.1 Kickoff Meeting12 12 12 1450 $3,062 $200 $10,182 1.2 50% Design Meeting12 12 12 1450 $3,062 $200 $10,182 1.3 95% Design Meeting12 12 12 1450 $3,062 $200 $10,182 1.4 Virtual Meetings (Assumed 4)4 4 4 820 $1,162 $3,787 1.5 Project Management120120 $10,456 $34,084 1.6 50% Submittal QA/QC8080 $5,118 $16,683 1.7 90% Submittal QA/QC8080 $5,118 $16,683 1.8 Final Submittal QA/QC4040 $2,559 $8,341 Task 1 Sub-total0 0 0 0 160 240 40 50 0 0 0 0 0 0 0 490 $33,597 $0 $600 $110,124TASK 2 - 50% DESIGN--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- 2.1 Basis of Design Tech Memo10 40 80 8138 $6,852 $5,000 $400 $28,488Sub = SME 2.2 50% Drawings0.25 0.25 0.5 23 $165 $537 Sheet 1 (G1) Title Sheet0.5 1 2 69.5 $514 $1,675 Sheet 2 (G2) Drawing Index0.5 1 2 69.5 $514 $1,675 Sheet 3 (G3) General Location Map0.5 1 2 69.5 $514 $1,675 Sheet 4 (G4) General Abbreviations, Symbols, Legends, and Notes0.5 1 2 69.5 $514 $1,675 Sheet 5 (G5) General Location Plan and Survey Control View 10.5 1 2 69.5 $514 $1,675 Sheet 6 (G6) General Location Plan and Survey Control View 20.5 1 2 69.5 $514 $1,675 Sheet 7 (G7) General Location Plan and Survey Control View 30.5 1 2 69.5 $514 $1,675 Sheet 8 (G8) General Location Plan and Survey Control View 40.5 1 2 69.5 $514 $1,675 Sheet 9 (G9) General Location Plan and Survey Control View 50.5 1 2 69.5 $514 $1,675 Sheet 10 (G10) General Location Plan and Survey Control View 60.5 1 2 69.5 $514 $1,675 Sheet 11 (G11) General Location Plan and Survey Control View 70.5 1 2 69.5 $514 $1,675 Sheet 12 (G12) Existing Structure Data Table0.5 1 2 69.5 $514 $1,675 Sheet 13 (G13) New Structure Data Table0.5 1 2 69.5 $514 $1,675 Sheet 14 (DR1) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 10.5 1 2 69.5 $514 $1,675 Sheet 15 (DR2) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 20.5 1 2 69.5 $514 $1,675 Sheet 16 (DR3) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 30.5 1 2 69.5 $514 $1,675 Sheet 17 (DR4) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 40.5 1 2 69.5 $514 $1,675 Sheet 18 (DR5) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 50.5 1 2 69.5 $514 $1,675 Sheet 19 (DR6) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 60.5 1 2 69.5 $514 $1,675 Sheet 20 (DR7) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 70.5 1 2 69.5 $514 $1,675 Sheet 21 (DR8) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 80.5 1 2 69.5 $514 $1,675 Sheet 22 (DR9) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 90.5 1 2 69.5 $514 $1,675 Sheet 23 (DR10) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 100.5 1 2 69.5 $514 $1,675 Sheet 24 (DR11) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 110.5 1 2 69.5 $514 $1,675 Sheet 25 (DR12) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 120.5 1 2 69.5 $514 $1,675 Sheet 26 (DR13) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 130.5 1 2 69.5 $514 $1,675 Sheet 27 (DR14) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 140.5 1 2 69.5 $514 $1,675 Sheet 28 (DR15) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 150.5 1 2 69.5 $514 $1,675 Sheet 29 (DR16) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 160.5 1 2 69.5 $514 $1,675 Sheet 30 (DR17) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 170.5 1 2 69.5 $514 $1,675 Sheet 31 (DR18) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 180.5 1 2 69.5 $514 $1,675 Sheet 32 (DR19) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 190.5 1 2 69.5 $514 $1,675 Sheet 33 (DR20) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 200.5 1 2 69.5 $514 $1,675 Sheet 34 (DR21) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 210.5 1 2 69.5 $514 $1,675 Sheet 35 (DR22) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 220.5 1 2 69.5 $514 $1,675 Sheet 36 (DR23) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 230.5 1 2 69.5 $514 $1,675 Sheet 37 (DR24) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 240.5 1 2 69.5 $514 $1,675 Sheet 38 (DR25) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 250.5 1 2 69.5 $514 $1,675 Sheet 39 (DR26) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 260.5 1 2 69.5 $514 $1,675 Sheet 40 (DR27) Leg to the West Demolotion and Restoration Plan View 10.5 1 2 69.5 $514 $1,675 Sheet 41 (DR28) Leg to the West Demolotion and Restoration Plan View 20.5 1 2 69.5 $514 $1,675 Sheet 42 (DR29) Demolotion of Existing Midwest Industrial Park Lift Station0.5 1 2 69.5 $514 $1,675 Sheet 43 (PP1) Midwest Industrial Park Interceptor Plan and Profile 10.5 1 2 69.5 $514 $1,675 Sheet 44 (PP2) Midwest Industrial Park Interceptor Plan and Profile 20.5 1 2 69.5 $514 $1,675 Sheet 45 (PP3) Midwest Industrial Park Interceptor Plan and Profile 30.5 1 2 69.5 $514 $1,675 Sheet 46 (PP4) Midwest Industrial Park Interceptor Plan and Profile 40.5 1 2 69.5 $514 $1,675 Sheet 47 (PP5) Midwest Industrial Park Interceptor Plan and Profile 50.5 1 2 69.5 $514 $1,675 Sheet 48 (PP6) Midwest Industrial Park Interceptor Plan and Profile 60.5 1 2 69.5 $514 $1,675 Sheet 49 (PP7) Midwest Industrial Park Interceptor Plan and Profile 70.5 1 2 69.5 $514 $1,675 Sheet 50 (PP8) Midwest Industrial Park Interceptor Plan and Profile 80.5 1 2 69.5 $514 $1,675 Sheet 51 (PP9) Midwest Industrial Park Interceptor Plan and Profile 90.5 1 2 69.5 $514 $1,675 Sheet 52 (PP10) Midwest Industrial Park Interceptor Plan and Profile 100.5 1 2 69.5 $514 $1,675 Sheet 53 (PP11) Midwest Industrial Park Interceptor Plan and Profile 110.5 1 2 69.5 $514 $1,675 Sheet 54 (PP12) Midwest Industrial Park Interceptor Plan and Profile 120.5 1 2 69.5 $514 $1,675 Sheet 55 (PP13) Midwest Industrial Park Interceptor Plan and Profile 130.5 1 2 69.5 $514 $1,675 Sheet 56 (PP14) Midwest Industrial Park Interceptor Plan and Profile 140.5 1 2 69.5 $514 $1,675 Sheet 57 (PP15) Midwest Industrial Park Interceptor Plan and Profile 150.5 1 2 69.5 $514 $1,675 Sheet 58 (PP16) Midwest Industrial Park Interceptor Plan and Profile 160.5 1 2 69.5 $514 $1,675 Sheet 59 (PP17) Midwest Industrial Park Interceptor Plan and Profile 170.5 1 2 69.5 $514 $1,675 Sheet 60 (PP18) Midwest Industrial Park Interceptor Plan and Profile 180.5 1 2 69.5 $514 $1,675 Sheet 61 (PP19) Midwest Industrial Park Interceptor Plan and Profile 190.5 1 2 69.5 $514 $1,6753.259915%0%8/1/2022DesharnaisJuly 1, 2022 - June 30, 2023September 2022 Sheet 62 (PP20) Midwest Industrial Park Interceptor Plan and Profile 200.5 1 2 69.5 $514 $1,675 Sheet 63 (PP21) Midwest Industrial Park Interceptor Plan and Profile 210.5 1 2 69.5 $514 $1,675 Sheet 64 (PP22) Midwest Industrial Park Interceptor Plan and Profile 220.5 1 2 69.5 $514 $1,675 Sheet 65 (PP23) Midwest Industrial Park Interceptor Plan and Profile 230.5 1 2 69.5 $514 $1,675 Sheet 66 (PP24) Midwest Industrial Park Interceptor Plan and Profile 240.5 1 2 69.5 $514 $1,675 Sheet 67 (PP25) Midwest Industrial Park Interceptor Plan and Profile 250.5 1 2 69.5 $514 $1,675 Sheet 68 (PP26) Midwest Industrial Park Interceptor Plan and Profile 260.5 1 2 69.5 $514 $1,675 Sheet 69 (PP27) Leg to the West Plan and Profile 10.5 1 2 69.5 $514 $1,675 Sheet 70 (PP28) Leg to the West Plan and Profile 20.5 1 2 69.5 $514 $1,675 Sheet 71 (PP29) Misc Utility Relocation Plan and Profile 10.5 1 2 69.5 $514 $1,675 Sheet 72 (PP30) Misc Utility Relocation Plan and Profile 20.5 1 2 69.5 $514 $1,675 Sheet 73 (PP31) Misc Utility Relocation Plan and Profile 30.5 1 2 69.5 $514 $1,675 Sheet 74 (PP32) Misc Utility Relocation Plan and Profile 40.5 1 2 69.5 $514 $1,675 Sheet 75 (SS1) Structure Details 10.5 1 2 69.5 $514 $1,675 Sheet 76 (SS2) Structure Details 20.5 1 2 69.5 $514 $1,675 Sheet 77 (SS3) Structure Details 30.5 1 2 69.5 $514 $1,675 Sheet 78 (SS4) Structure Details 40.5 1 2 69.5 $514 $1,675 Sheet 79 (SS5) Structure Details 50.5 1 2 69.5 $514 $1,675 Sheet 80 (SS6) Structure Details 60.5 1 2 69.5 $514 $1,675 Sheet 81 (SS7) Structure Details 70.5 1 2 69.5 $514 $1,675 Sheet 82 (SS8) Structure Details 80.5 1 2 69.5 $514 $1,675 Sheet 83 (SS9) Structure Details 90.5 1 2 69.5 $514 $1,675 Sheet 84 (SS10) Structure Details 100.5 1 2 69.5 $514 $1,675 Sheet 85 (SS11) Structure Details 110.5 1 2 69.5 $514 $1,675 Sheet 86 (SS12) Structure Details 120.5 1 2 69.5 $514 $1,675 Sheet 87 (SS13) Structure Details 130.5 1 2 69.5 $514 $1,675 Sheet 88 (SS14) Structure Details 140.5 1 2 69.5 $514 $1,675 Sheet 89 (AD1) Access Drive Plan 10.5 1 2 69.5 $514 $1,675 Sheet 90 (AD2) Access Drive Plan 20.5 1 2 69.5 $514 $1,675 Sheet 91 (AD3) Access Drive Plan 30.5 1 2 69.5 $514 $1,675 Sheet 92 (AD4) Access Drive Plan 40.5 1 2 69.5 $514 $1,675 Sheet 93 (AD5) Access Drive Plan 50.5 1 2 69.5 $514 $1,675 Sheet 94 (AD6) Access Drive Plan 60.5 1 2 69.5 $514 $1,675 Sheet 95 (AD7) Access Drive Plan 70.5 1 2 69.5 $514 $1,675 Sheet 96 (AD8) Access Drive Plan 80.5 1 2 69.5 $514 $1,675 Sheet 97 (AD9) Access Drive Plan 90.5 1 2 69.5 $514 $1,675 Sheet 98 (AD10) Access Drive Plan 100.5 1 2 69.5 $514 $1,675 Sheet 99 (CS1) Access Drive Cross Sections 10.5 1 2 69.5 $514 $1,675 Sheet 100 (CS2) Access Drive Cross Sections 20.5 1 2 69.5 $514 $1,675 Sheet 101 (CS3) Access Drive Cross Sections 30.5 1 2 69.5 $514 $1,675 Sheet 102 (CS4) Access Drive Cross Sections 40.5 1 2 69.5 $514 $1,675 Sheet 103 (CS5) Access Drive Cross Sections 50.5 1 2 69.5 $514 $1,675 Sheet 104 (CS6) Access Drive Cross Sections 60.5 1 2 69.5 $514 $1,675 Sheet 105 (CS7) Access Drive Cross Sections 70.5 1 2 69.5 $514 $1,675 Sheet 106 (CS8) Access Drive Cross Sections 80.5 1 2 69.5 $514 $1,675 Sheet 107 (CS9) Access Drive Cross Sections 90.5 1 2 69.5 $514 $1,675 Sheet 108 (CS10) Access Drive Cross Sections 100.5 1 2 69.5 $514 $1,675 Sheet 109 (EC1) Erosion Control Plans 10.5 1 2 69.5 $514 $1,675 Sheet 110 (EC2) Erosion Control Plans 20.5 1 2 69.5 $514 $1,675 Sheet 111 (EC3) Erosion Control Plans 30.5 1 2 69.5 $514 $1,675 Sheet 112 (EC4) Erosion Control Plans 40.5 1 2 69.5 $514 $1,675 Sheet 113 (EC5) Erosion Control Plans 50.5 1 2 69.5 $514 $1,675 Sheet 114 (EC6) Erosion Control Plans 60.5 1 2 69.5 $514 $1,675 Sheet 115 (EC7) Erosion Control Plans 70.5 1 2 69.5 $514 $1,675 Sheet 116 (EC8) Erosion Control Plans 80.5 1 2 69.5 $514 $1,675 Sheet 117 (EC9) Erosion Control Plans 90.5 1 2 69.5 $514 $1,675 Sheet 118 (EC10) Erosion Control Plans 100.5 1 2 69.5 $514 $1,675 Sheet 119 (EC11) Erosion Control Plans 110.5 1 2 69.5 $514 $1,675 Sheet 120 (EC12) Erosion Control Plans 120.5 1 2 69.5 $514 $1,675 Sheet 121 (EC13) Erosion Control Plans 130.5 1 2 69.5 $514 $1,675 Sheet 122 (EC14) Erosion Control Plans 140.5 1 2 69.5 $514 $1,675 Sheet 123 (TC1) Traffic Control and Maintenance Plans 10.25 0.5 0.5 23.25 $178 $1,000 $1,732Sub = Apex Sheet 124 (TC2) Traffic Control and Maintenance Plans 20.25 0.5 0.5 23.25 $178 $1,000 $1,732Sub = Apex Sheet 125 (TC3) Traffic Control and Maintenance Plans 30.25 0.5 0.5 23.25 $178 $1,000 $1,732Sub = Apex Sheet 126 (TC4) Traffic Control and Maintenance Plans 40.25 0.5 0.5 23.25 $178 $1,000 $1,732Sub = Apex Sheet 127 (TC5) Traffic Control and Maintenance Plans 50.25 0.5 0.5 23.25 $178 $1,000 $1,732Sub = Apex Sheet 128 (TC6) Traffic Control and Maintenance Plans 60.25 0.5 0.5 23.25 $178 $1,000 $1,732Sub = Apex Sheet 129 (MD1) Miscellaneous Details 10.5 1 2 69.5 $514 $1,675 Sheet 130 (MD2) Miscellaneous Details 20.5 1 2 69.5 $514 $1,675 Sheet 131 (MD3) Miscellaneous Details 30.5 1 2 69.5 $514 $1,675 Sheet 132 (MD4) Miscellaneous Details 40.5 1 2 69.5 $514 $1,675 Sheet 133 (MD5) Miscellaneous Details 50.5 1 2 69.5 $514 $1,675 Sheet 134 (MD6) Miscellaneous Details 60.5 1 2 69.5 $514 $1,675 Sheet 135 (MD7) Miscellaneous Details 70.5 1 2 69.5 $514 $1,675 Sheet 136 (MD8) Miscellaneous Details 80.5 1 2 69.5 $514 $1,675 Sheet 137 (MD9) Miscellaneous Details 90.5 1 2 69.5 $514 $1,675 Sheet 138 (MD10) Miscellaneous Details 100.5 1 2 69.5 $514 $1,675 Sheet 139 (MD11) Miscellaneous Details 110.5 1 2 69.5 $514 $1,675 Sheet 140 (MD12) Miscellaneous Details 120.5 1 2 69.5 $514 $1,675 2.3 50% Contract Book10 40 8012142 $6,796 $22,155 2.4 50% Bid Form & Cost Estimate5 20 40 469 $3,426 $11,169 2.5 50% Submittal Assembly4 8 4 81236 $1,712 $5,582 Task 2 Sub-total0 0 0 0 97.75 0 245.25 204 271.5 838 0 0 24 0 0 1680.5 $88,894 $11,000 $400 $302,836TASK 3 - 90% DESIGN--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- 3.1 90% Drawings0 $0$0 Sheet 1 (G1) Title Sheet0.25 0.25 0.5 23 $165 $537 Sheet 2 (G2) Drawing Index0.5 1 2 69.5 $514 $1,675 Sheet 3 (G3) General Location Map0.5 1 2 69.5 $514 $1,675 Sheet 4 (G4) General Abbreviations, Symbols, Legends, and Notes0.5 1 2 69.5 $514 $1,675 Sheet 5 (G5) General Location Plan and Survey Control View 10.5 1 2 69.5 $514 $1,675 Sheet 6 (G6) General Location Plan and Survey Control View 20.5 1 2 69.5 $514 $1,675 Sheet 7 (G7) General Location Plan and Survey Control View 30.5 1 2 69.5 $514 $1,675 Sheet 8 (G8) General Location Plan and Survey Control View 40.5 1 2 69.5 $514 $1,675 Sheet 9 (G9) General Location Plan and Survey Control View 50.5 1 2 69.5 $514 $1,675 Sheet 10 (G10) General Location Plan and Survey Control View 60.5 1 2 69.5 $514 $1,675 Sheet 11 (G11) General Location Plan and Survey Control View 70.5 1 2 69.5 $514 $1,675 Sheet 12 (G12) Existing Structure Data Table0.5 1 2 69.5 $514 $1,675 Sheet 13 (G13) New Structure Data Table0.5 1 2 69.5 $514 $1,675 Sheet 14 (DR1) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 10.5 1 2 69.5 $514 $1,675 Sheet 15 (DR2) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 20.5 1 2 69.5 $514 $1,675 Sheet 16 (DR3) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 30.5 1 2 69.5 $514 $1,675 Sheet 17 (DR4) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 40.5 1 2 69.5 $514 $1,675 Sheet 18 (DR5) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 50.5 1 2 69.5 $514 $1,675 Sheet 19 (DR6) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 60.5 1 2 69.5 $514 $1,675 Sheet 20 (DR7) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 70.5 1 2 69.5 $514 $1,675 Sheet 21 (DR8) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 80.5 1 2 69.5 $514 $1,675 Sheet 22 (DR9) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 90.5 1 2 69.5 $514 $1,675 Sheet 23 (DR10) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 100.5 1 2 69.5 $514 $1,675 Sheet 24 (DR11) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 110.5 1 2 69.5 $514 $1,675 Sheet 25 (DR12) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 120.5 1 2 69.5 $514 $1,675 Sheet 26 (DR13) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 130.5 1 2 69.5 $514 $1,675 Sheet 27 (DR14) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 140.5 1 2 69.5 $514 $1,675 Sheet 28 (DR15) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 150.5 1 2 69.5 $514 $1,675 Sheet 29 (DR16) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 160.5 1 2 69.5 $514 $1,675 Sheet 30 (DR17) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 170.5 1 2 69.5 $514 $1,675 Sheet 31 (DR18) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 180.5 1 2 69.5 $514 $1,675 Sheet 32 (DR19) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 190.5 1 2 69.5 $514 $1,675 Sheet 33 (DR20) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 200.5 1 2 69.5 $514 $1,675 Sheet 34 (DR21) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 210.5 1 2 69.5 $514 $1,675 Sheet 35 (DR22) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 220.5 1 2 69.5 $514 $1,675 Sheet 36 (DR23) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 230.5 1 2 69.5 $514 $1,675 Sheet 37 (DR24) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 240.5 1 2 69.5 $514 $1,675 Sheet 38 (DR25) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 250.5 1 2 69.5 $514 $1,675 Sheet 39 (DR26) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 260.5 1 2 69.5 $514 $1,675 Sheet 40 (DR27) Leg to the West Demolotion and Restoration Plan View 10.5 1 2 69.5 $514 $1,675 Sheet 41 (DR28) Leg to the West Demolotion and Restoration Plan View 20.5 1 2 69.5 $514 $1,675 Sheet 42 (DR29) Demolotion of Existing Midwest Industrial Park Lift Station0.5 1 2 69.5 $514 $1,675 Sheet 43 (PP1) Midwest Industrial Park Interceptor Plan and Profile 10.5 1 2 69.5 $514 $1,675 Sheet 44 (PP2) Midwest Industrial Park Interceptor Plan and Profile 20.5 1 2 69.5 $514 $1,675 Sheet 45 (PP3) Midwest Industrial Park Interceptor Plan and Profile 30.5 1 2 69.5 $514 $1,675 Sheet 46 (PP4) Midwest Industrial Park Interceptor Plan and Profile 40.5 1 2 69.5 $514 $1,675 Sheet 47 (PP5) Midwest Industrial Park Interceptor Plan and Profile 50.5 1 2 69.5 $514 $1,675 Sheet 48 (PP6) Midwest Industrial Park Interceptor Plan and Profile 60.5 1 2 69.5 $514 $1,675 Sheet 49 (PP7) Midwest Industrial Park Interceptor Plan and Profile 70.5 1 2 69.5 $514 $1,675 Sheet 50 (PP8) Midwest Industrial Park Interceptor Plan and Profile 80.5 1 2 69.5 $514 $1,675 Sheet 51 (PP9) Midwest Industrial Park Interceptor Plan and Profile 90.5 1 2 69.5 $514 $1,675 Sheet 52 (PP10) Midwest Industrial Park Interceptor Plan and Profile 100.5 1 2 69.5 $514 $1,675 Sheet 53 (PP11) Midwest Industrial Park Interceptor Plan and Profile 110.5 1 2 69.5 $514 $1,675 Sheet 54 (PP12) Midwest Industrial Park Interceptor Plan and Profile 120.5 1 2 69.5 $514 $1,675 Sheet 55 (PP13) Midwest Industrial Park Interceptor Plan and Profile 130.5 1 2 69.5 $514 $1,675 Sheet 56 (PP14) Midwest Industrial Park Interceptor Plan and Profile 140.5 1 2 69.5 $514 $1,675 Sheet 57 (PP15) Midwest Industrial Park Interceptor Plan and Profile 150.5 1 2 69.5 $514 $1,675 Sheet 58 (PP16) Midwest Industrial Park Interceptor Plan and Profile 160.5 1 2 69.5 $514 $1,675 Sheet 59 (PP17) Midwest Industrial Park Interceptor Plan and Profile 170.5 1 2 69.5 $514 $1,675 Sheet 60 (PP18) Midwest Industrial Park Interceptor Plan and Profile 180.5 1 2 69.5 $514 $1,675 Sheet 61 (PP19) Midwest Industrial Park Interceptor Plan and Profile 190.5 1 2 69.5 $514 $1,675 Sheet 62 (PP20) Midwest Industrial Park Interceptor Plan and Profile 200.5 1 2 69.5 $514 $1,675 Sheet 63 (PP21) Midwest Industrial Park Interceptor Plan and Profile 210.5 1 2 69.5 $514 $1,675 Sheet 64 (PP22) Midwest Industrial Park Interceptor Plan and Profile 220.5 1 2 69.5 $514 $1,675 Sheet 65 (PP23) Midwest Industrial Park Interceptor Plan and Profile 230.5 1 2 69.5 $514 $1,675 Sheet 66 (PP24) Midwest Industrial Park Interceptor Plan and Profile 240.5 1 2 69.5 $514 $1,675 Sheet 67 (PP25) Midwest Industrial Park Interceptor Plan and Profile 250.5 1 2 69.5 $514 $1,675 Sheet 68 (PP26) Midwest Industrial Park Interceptor Plan and Profile 260.5 1 2 69.5 $514 $1,675 Sheet 69 (PP27) Leg to the West Plan and Profile 10.5 1 2 69.5 $514 $1,675 Sheet 70 (PP28) Leg to the West Plan and Profile 20.5 1 2 69.5 $514 $1,675 Sheet 71 (PP29) Misc Utility Relocation Plan and Profile 10.5 1 2 69.5 $514 $1,675 Sheet 72 (PP30) Misc Utility Relocation Plan and Profile 20.5 1 2 69.5 $514 $1,675 Sheet 73 (PP31) Misc Utility Relocation Plan and Profile 30.5 1 2 69.5 $514 $1,675 Sheet 74 (PP32) Misc Utility Relocation Plan and Profile 40.5 1 2 69.5 $514 $1,675 Sheet 75 (SS1) Structure Details 10.5 1 2 69.5 $514 $1,675 Sheet 76 (SS2) Structure Details 20.5 1 2 69.5 $514 $1,675 Sheet 77 (SS3) Structure Details 30.5 1 2 69.5 $514 $1,675 Sheet 78 (SS4) Structure Details 40.5 1 2 69.5 $514 $1,675 Sheet 79 (SS5) Structure Details 50.5 1 2 69.5 $514 $1,675 Sheet 80 (SS6) Structure Details 60.5 1 2 69.5 $514 $1,675 Sheet 81 (SS7) Structure Details 70.5 1 2 69.5 $514 $1,675 Sheet 82 (SS8) Structure Details 80.5 1 2 69.5 $514 $1,675 Sheet 83 (SS9) Structure Details 90.5 1 2 69.5 $514 $1,675 Sheet 84 (SS10) Structure Details 100.5 1 2 69.5 $514 $1,675 Sheet 85 (SS11) Structure Details 110.5 1 2 69.5 $514 $1,675 Sheet 86 (SS12) Structure Details 120.5 1 2 69.5 $514 $1,675 Sheet 87 (SS13) Structure Details 130.5 1 2 69.5 $514 $1,675 Sheet 88 (SS14) Structure Details 140.5 1 2 69.5 $514 $1,675 Sheet 89 (AD1) Access Drive Plan 10.5 1 2 69.5 $514 $1,675 Sheet 90 (AD2) Access Drive Plan 20.5 1 2 69.5 $514 $1,675 Sheet 91 (AD3) Access Drive Plan 30.5 1 2 69.5 $514 $1,675 Sheet 92 (AD4) Access Drive Plan 40.5 1 2 69.5 $514 $1,675 Sheet 93 (AD5) Access Drive Plan 50.5 1 2 69.5 $514 $1,675 Sheet 94 (AD6) Access Drive Plan 60.5 1 2 69.5 $514 $1,675 Sheet 95 (AD7) Access Drive Plan 70.5 1 2 69.5 $514 $1,675 Sheet 96 (AD8) Access Drive Plan 80.5 1 2 69.5 $514 $1,675 Sheet 97 (AD9) Access Drive Plan 90.5 1 2 69.5 $514 $1,675 Sheet 98 (AD10) Access Drive Plan 100.5 1 2 69.5 $514 $1,675 Sheet 99 (CS1) Access Drive Cross Sections 10.5 1 2 69.5 $514 $1,675 Sheet 100 (CS2) Access Drive Cross Sections 20.5 1 2 69.5 $514 $1,675 Sheet 101 (CS3) Access Drive Cross Sections 30.5 1 2 69.5 $514 $1,675 Sheet 102 (CS4) Access Drive Cross Sections 40.5 1 2 69.5 $514 $1,675 Sheet 103 (CS5) Access Drive Cross Sections 50.5 1 2 69.5 $514 $1,675 Sheet 104 (CS6) Access Drive Cross Sections 60.5 1 2 69.5 $514 $1,675 Sheet 105 (CS7) Access Drive Cross Sections 70.5 1 2 69.5 $514 $1,675 Sheet 106 (CS8) Access Drive Cross Sections 80.5 1 2 69.5 $514 $1,675 Sheet 107 (CS9) Access Drive Cross Sections 90.5 1 2 69.5 $514 $1,675 Sheet 108 (CS10) Access Drive Cross Sections 100.5 1 2 69.5 $514 $1,675 Sheet 109 (EC1) Erosion Control Plans 10.5 1 2 69.5 $514 $1,675 Sheet 110 (EC2) Erosion Control Plans 20.5 1 2 69.5 $514 $1,675 Sheet 111 (EC3) Erosion Control Plans 30.5 1 2 69.5 $514 $1,675 Sheet 112 (EC4) Erosion Control Plans 40.5 1 2 69.5 $514 $1,675 Sheet 113 (EC5) Erosion Control Plans 50.5 1 2 69.5 $514 $1,675 Sheet 114 (EC6) Erosion Control Plans 60.5 1 2 69.5 $514 $1,675 Sheet 115 (EC7) Erosion Control Plans 70.5 1 2 69.5 $514 $1,675 Sheet 116 (EC8) Erosion Control Plans 80.5 1 2 69.5 $514 $1,675 Sheet 117 (EC9) Erosion Control Plans 90.5 1 2 69.5 $514 $1,675 Sheet 118 (EC10) Erosion Control Plans 100.5 1 2 69.5 $514 $1,675 Sheet 119 (EC11) Erosion Control Plans 110.5 1 2 69.5 $514 $1,675 Sheet 120 (EC12) Erosion Control Plans 120.5 1 2 69.5 $514 $1,675 Sheet 121 (EC13) Erosion Control Plans 130.5 1 2 69.5 $514 $1,675 Sheet 122 (EC14) Erosion Control Plans 140.5 1 2 69.5 $514 $1,675 Sheet 123 (TC1) Traffic Control and Maintenance Plans 10.5 1 2 69.5 $514 $1,675 Sheet 124 (TC2) Traffic Control and Maintenance Plans 20.25 0.5 0.5 23.25 $178 $1,000 $1,732Sub = Apex Sheet 125 (TC3) Traffic Control and Maintenance Plans 30.25 0.5 0.5 23.25 $178 $1,000 $1,732Sub = Apex Sheet 126 (TC4) Traffic Control and Maintenance Plans 40.25 0.5 0.5 23.25 $178 $1,000 $1,732Sub = Apex Sheet 127 (TC5) Traffic Control and Maintenance Plans 50.25 0.5 0.5 23.25 $178 $1,000 $1,732Sub = Apex Sheet 128 (TC6) Traffic Control and Maintenance Plans 60.25 0.5 0.5 23.25 $178 $1,000 $1,732Sub = Apex Sheet 129 (MD1) Miscellaneous Details 10.25 0.5 0.5 23.25 $178 $1,000 $1,732Sub = Apex Sheet 130 (MD2) Miscellaneous Details 20.5 1 2 69.5 $514 $1,675 Sheet 131 (MD3) Miscellaneous Details 30.5 1 2 69.5 $514 $1,675 Sheet 132 (MD4) Miscellaneous Details 40.5 1 2 69.5 $514 $1,675 Sheet 133 (MD5) Miscellaneous Details 50.5 1 2 69.5 $514 $1,675 Sheet 134 (MD6) Miscellaneous Details 60.5 1 2 69.5 $514 $1,675 Sheet 135 (MD7) Miscellaneous Details 70.5 1 2 69.5 $514 $1,675 Sheet 136 (MD8) Miscellaneous Details 80.5 1 2 69.5 $514 $1,675 Sheet 137 (MD9) Miscellaneous Details 90.5 1 2 69.5 $514 $1,675 Sheet 138 (MD10) Miscellaneous Details 100.5 1 2 69.5 $514 $1,675 Sheet 139 (MD11) Miscellaneous Details 110.5 1 2 69.5 $514 $1,675 Sheet 140 (MD12) Miscellaneous Details 120.5 1 2 69.5 $514 $1,675 3.2 90% Contract Book10 40 8012142 $6,796 $22,155 3.3 90% Bid Form & Cost Estimate5 20 40 469 $3,426 $11,169 3.4 90% Submittal Assembly4 8 4 81236 $1,712 $5,582 Task 3 Sub-total0 0 0 0 87.75 0 205.25 124 270.5 830 0 0 24 0 0 1541.5 $81,986 $6,000 $0 $274,167TASK 4 - FINAL DESIGN--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- 4.1 FInal Drawings0 $0$0 Sheet 1 (G1) Title Sheet0.25 0.25 0.25 0.51.25 $75 $244 Sheet 2 (G2) Drawing Index0.25 0.5 1 34.75 $257 $838 Sheet 3 (G3) General Location Map0.25 0.5 1 34.75 $257 $838 Sheet 4 (G4) General Abbreviations, Symbols, Legends, and Notes0.25 0.5 1 34.75 $257 $838 Sheet 5 (G5) General Location Plan and Survey Control View 10.25 0.5 1 34.75 $257 $838 Sheet 6 (G6) General Location Plan and Survey Control View 20.25 0.5 1 34.75 $257 $838 Sheet 7 (G7) General Location Plan and Survey Control View 30.25 0.5 1 34.75 $257 $838 Sheet 8 (G8) General Location Plan and Survey Control View 40.25 0.5 1 34.75 $257 $838 Sheet 9 (G9) General Location Plan and Survey Control View 50.25 0.5 1 34.75 $257 $838 Sheet 10 (G10) General Location Plan and Survey Control View 60.25 0.5 1 34.75 $257 $838 Sheet 11 (G11) General Location Plan and Survey Control View 70.25 0.5 1 34.75 $257 $838 Sheet 12 (G12) Existing Structure Data Table0.25 0.5 1 34.75 $257 $838 Sheet 13 (G13) New Structure Data Table0.25 0.5 1 34.75 $257 $838 Sheet 14 (DR1) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 10.25 0.5 1 34.75 $257 $838 Sheet 15 (DR2) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 20.25 0.5 1 34.75 $257 $838 Sheet 16 (DR3) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 30.25 0.5 1 34.75 $257 $838 Sheet 17 (DR4) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 40.25 0.5 1 34.75 $257 $838 Sheet 18 (DR5) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 50.25 0.5 1 34.75 $257 $838 Sheet 19 (DR6) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 60.25 0.5 1 34.75 $257 $838 Sheet 20 (DR7) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 70.25 0.5 1 34.75 $257 $838 Sheet 21 (DR8) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 80.25 0.5 1 34.75 $257 $838 Sheet 22 (DR9) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 90.25 0.5 1 34.75 $257 $838 Sheet 23 (DR10) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 100.25 0.5 1 34.75 $257 $838 Sheet 24 (DR11) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 110.25 0.5 1 34.75 $257 $838 Sheet 25 (DR12) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 120.25 0.5 1 34.75 $257 $838 Sheet 26 (DR13) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 130.25 0.5 1 34.75 $257 $838 Sheet 27 (DR14) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 140.25 0.5 1 34.75 $257 $838 Sheet 28 (DR15) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 150.25 0.5 1 34.75 $257 $838 Sheet 29 (DR16) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 160.25 0.5 1 34.75 $257 $838 Sheet 30 (DR17) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 170.25 0.5 1 34.75 $257 $838 Sheet 31 (DR18) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 180.25 0.5 1 34.75 $257 $838 Sheet 32 (DR19) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 190.25 0.5 1 34.75 $257 $838 Sheet 33 (DR20) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 200.25 0.5 1 34.75 $257 $838 Sheet 34 (DR21) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 210.25 0.5 1 34.75 $257 $838 Sheet 35 (DR22) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 220.25 0.5 1 34.75 $257 $838 Sheet 36 (DR23) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 230.25 0.5 1 34.75 $257 $838 Sheet 37 (DR24) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 240.25 0.5 1 34.75 $257 $838 Sheet 38 (DR25) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 250.25 0.5 1 34.75 $257 $838 Sheet 39 (DR26) Midwest Industrial Park Interceptor Demolotion and Restoration Plan View 260.25 0.5 1 34.75 $257 $838 Sheet 40 (DR27) Leg to the West Demolotion and Restoration Plan View 10.25 0.5 1 34.75 $257 $838 Sheet 41 (DR28) Leg to the West Demolotion and Restoration Plan View 20.25 0.5 1 34.75 $257 $838 Sheet 42 (DR29) Demolotion of Existing Midwest Industrial Park Lift Station0.25 0.5 1 34.75 $257 $838 Sheet 43 (PP1) Midwest Industrial Park Interceptor Plan and Profile 10.25 0.5 1 34.75 $257 $838 Sheet 44 (PP2) Midwest Industrial Park Interceptor Plan and Profile 20.25 0.5 1 34.75 $257 $838 Sheet 45 (PP3) Midwest Industrial Park Interceptor Plan and Profile 30.25 0.5 1 34.75 $257 $838 Sheet 46 (PP4) Midwest Industrial Park Interceptor Plan and Profile 40.25 0.5 1 34.75 $257 $838 Sheet 47 (PP5) Midwest Industrial Park Interceptor Plan and Profile 50.25 0.5 1 34.75 $257 $838 Sheet 48 (PP6) Midwest Industrial Park Interceptor Plan and Profile 60.25 0.5 1 34.75 $257 $838 Sheet 49 (PP7) Midwest Industrial Park Interceptor Plan and Profile 70.25 0.5 1 34.75 $257 $838 Sheet 50 (PP8) Midwest Industrial Park Interceptor Plan and Profile 80.25 0.5 1 34.75 $257 $838 Sheet 51 (PP9) Midwest Industrial Park Interceptor Plan and Profile 90.25 0.5 1 34.75 $257 $838 Sheet 52 (PP10) Midwest Industrial Park Interceptor Plan and Profile 100.25 0.5 1 34.75 $257 $838 Sheet 53 (PP11) Midwest Industrial Park Interceptor Plan and Profile 110.25 0.5 1 34.75 $257 $838 Sheet 54 (PP12) Midwest Industrial Park Interceptor Plan and Profile 120.25 0.5 1 34.75 $257 $838 Sheet 55 (PP13) Midwest Industrial Park Interceptor Plan and Profile 130.25 0.5 1 34.75 $257 $838 Sheet 56 (PP14) Midwest Industrial Park Interceptor Plan and Profile 140.25 0.5 1 34.75 $257 $838 Sheet 57 (PP15) Midwest Industrial Park Interceptor Plan and Profile 150.25 0.5 1 34.75 $257 $838 Sheet 58 (PP16) Midwest Industrial Park Interceptor Plan and Profile 160.25 0.5 1 34.75 $257 $838 Sheet 59 (PP17) Midwest Industrial Park Interceptor Plan and Profile 170.25 0.5 1 34.75 $257 $838 Sheet 60 (PP18) Midwest Industrial Park Interceptor Plan and Profile 180.25 0.5 1 34.75 $257 $838 Sheet 61 (PP19) Midwest Industrial Park Interceptor Plan and Profile 190.25 0.5 1 34.75 $257 $838 Sheet 62 (PP20) Midwest Industrial Park Interceptor Plan and Profile 200.25 0.5 1 34.75 $257 $838 Sheet 63 (PP21) Midwest Industrial Park Interceptor Plan and Profile 210.25 0.5 1 34.75 $257 $838 Sheet 64 (PP22) Midwest Industrial Park Interceptor Plan and Profile 220.25 0.5 1 34.75 $257 $838 Sheet 65 (PP23) Midwest Industrial Park Interceptor Plan and Profile 230.25 0.5 1 34.75 $257 $838 Sheet 66 (PP24) Midwest Industrial Park Interceptor Plan and Profile 240.25 0.5 1 34.75 $257 $838 Sheet 67 (PP25) Midwest Industrial Park Interceptor Plan and Profile 250.25 0.5 1 34.75 $257 $838 Sheet 68 (PP26) Midwest Industrial Park Interceptor Plan and Profile 260.25 0.5 1 34.75 $257 $838 Sheet 69 (PP27) Leg to the West Plan and Profile 10.25 0.5 1 34.75 $257 $838 Sheet 70 (PP28) Leg to the West Plan and Profile 20.25 0.5 1 34.75 $257 $838 Sheet 71 (PP29) Misc Utility Relocation Plan and Profile 10.25 0.5 1 34.75 $257 $838 Sheet 72 (PP30) Misc Utility Relocation Plan and Profile 20.25 0.5 1 34.75 $257 $838 Sheet 73 (PP31) Misc Utility Relocation Plan and Profile 30.25 0.5 1 34.75 $257 $838 Sheet 74 (PP32) Misc Utility Relocation Plan and Profile 40.25 0.5 1 34.75 $257 $838 Sheet 75 (SS1) Structure Details 10.25 0.5 1 34.75 $257 $838 Sheet 76 (SS2) Structure Details 20.25 0.5 1 34.75 $257 $838 Sheet 77 (SS3) Structure Details 30.25 0.5 1 34.75 $257 $838 Sheet 78 (SS4) Structure Details 40.25 0.5 1 34.75 $257 $838 Sheet 79 (SS5) Structure Details 50.25 0.5 1 34.75 $257 $838 Sheet 80 (SS6) Structure Details 60.25 0.5 1 34.75 $257 $838 Sheet 81 (SS7) Structure Details 70.25 0.5 1 34.75 $257 $838 Sheet 82 (SS8) Structure Details 80.25 0.5 1 34.75 $257 $838 Sheet 83 (SS9) Structure Details 90.25 0.5 1 34.75 $257 $838 Sheet 84 (SS10) Structure Details 100.25 0.5 1 34.75 $257 $838 Sheet 85 (SS11) Structure Details 110.25 0.5 1 34.75 $257 $838 Sheet 86 (SS12) Structure Details 120.25 0.5 1 34.75 $257 $838 Sheet 87 (SS13) Structure Details 130.25 0.5 1 34.75 $257 $838 Sheet 88 (SS14) Structure Details 140.25 0.5 1 34.75 $257 $838 Sheet 89 (AD1) Access Drive Plan 10.25 0.5 1 34.75 $257 $838 Sheet 90 (AD2) Access Drive Plan 20.25 0.5 1 34.75 $257 $838 Sheet 91 (AD3) Access Drive Plan 30.25 0.5 1 34.75 $257 $838 Sheet 92 (AD4) Access Drive Plan 40.25 0.5 1 34.75 $257 $838 Sheet 93 (AD5) Access Drive Plan 50.25 0.5 1 34.75 $257 $838 Sheet 94 (AD6) Access Drive Plan 60.25 0.5 1 34.75 $257 $838 Sheet 95 (AD7) Access Drive Plan 70.25 0.5 1 34.75 $257 $838 Sheet 96 (AD8) Access Drive Plan 80.25 0.5 1 34.75 $257 $838 Sheet 97 (AD9) Access Drive Plan 90.25 0.5 1 34.75 $257 $838 Sheet 98 (AD10) Access Drive Plan 100.25 0.5 1 34.75 $257 $838 Sheet 99 (CS1) Access Drive Cross Sections 10.25 0.5 1 34.75 $257 $838 Sheet 100 (CS2) Access Drive Cross Sections 20.25 0.5 1 34.75 $257 $838 Sheet 101 (CS3) Access Drive Cross Sections 30.25 0.5 1 34.75 $257 $838 Sheet 102 (CS4) Access Drive Cross Sections 40.25 0.5 1 34.75 $257 $838 Sheet 103 (CS5) Access Drive Cross Sections 50.25 0.5 1 34.75 $257 $838 Sheet 104 (CS6) Access Drive Cross Sections 60.25 0.5 1 34.75 $257 $838 Sheet 105 (CS7) Access Drive Cross Sections 70.25 0.5 1 34.75 $257 $838 Sheet 106 (CS8) Access Drive Cross Sections 80.25 0.5 1 34.75 $257 $838 Sheet 107 (CS9) Access Drive Cross Sections 90.25 0.5 1 34.75 $257 $838 Sheet 108 (CS10) Access Drive Cross Sections 100.25 0.5 1 34.75 $257 $838 Sheet 109 (EC1) Erosion Control Plans 10.25 0.5 1 34.75 $257 $838 Sheet 110 (EC2) Erosion Control Plans 20.25 0.5 1 34.75 $257 $838 Sheet 111 (EC3) Erosion Control Plans 30.25 0.5 1 34.75 $257 $838 Sheet 112 (EC4) Erosion Control Plans 40.25 0.5 1 34.75 $257 $838 Sheet 113 (EC5) Erosion Control Plans 50.25 0.5 1 34.75 $257 $838 Sheet 114 (EC6) Erosion Control Plans 60.25 0.5 1 34.75 $257 $838 Sheet 115 (EC7) Erosion Control Plans 70.25 0.5 1 34.75 $257 $838 Sheet 116 (EC8) Erosion Control Plans 80.25 0.5 1 34.75 $257 $838 Sheet 117 (EC9) Erosion Control Plans 90.25 0.5 1 34.75 $257 $838 Sheet 118 (EC10) Erosion Control Plans 100.25 0.5 1 34.75 $257 $838 Sheet 119 (EC11) Erosion Control Plans 110.25 0.5 1 34.75 $257 $838 Sheet 120 (EC12) Erosion Control Plans 120.25 0.5 1 34.75 $257 $838 Sheet 121 (EC13) Erosion Control Plans 130.25 0.5 1 34.75 $257 $838 Sheet 122 (EC14) Erosion Control Plans 140.25 0.5 1 34.75 $257 $838 Sheet 123 (TC1) Traffic Control and Maintenance Plans 10.25 0.5 1 34.75 $257 $838 Sheet 124 (TC2) Traffic Control and Maintenance Plans 20.25 0.5 0.5 12.25 $128 $500 $991Sub = Apex Sheet 125 (TC3) Traffic Control and Maintenance Plans 30.25 0.5 0.5 12.25 $128 $500 $991Sub = Apex Sheet 126 (TC4) Traffic Control and Maintenance Plans 40.25 0.5 0.5 12.25 $128 $500 $991Sub = Apex Sheet 127 (TC5) Traffic Control and Maintenance Plans 50.25 0.5 0.5 12.25 $128 $500 $991Sub = Apex Sheet 128 (TC6) Traffic Control and Maintenance Plans 60.25 0.5 0.5 12.25 $128 $500 $991Sub = Apex Sheet 129 (MD1) Miscellaneous Details 10.25 0.5 0.5 12.25 $128 $500 $991Sub = Apex Sheet 130 (MD2) Miscellaneous Details 20.25 0.5 1 34.75 $257 $838 Sheet 131 (MD3) Miscellaneous Details 30.25 0.5 1 34.75 $257 $838 Sheet 132 (MD4) Miscellaneous Details 40.25 0.5 1 34.75 $257 $838 Sheet 133 (MD5) Miscellaneous Details 50.25 0.5 1 34.75 $257 $838 Sheet 134 (MD6) Miscellaneous Details 60.25 0.5 1 34.75 $257 $838 Sheet 135 (MD7) Miscellaneous Details 70.25 0.5 1 34.75 $257 $838 Sheet 136 (MD8) Miscellaneous Details 80.25 0.5 1 34.75 $257 $838 Sheet 137 (MD9) Miscellaneous Details 90.25 0.5 1 34.75 $257 $838 Sheet 138 (MD10) Miscellaneous Details 100.25 0.5 1 34.75 $257 $838 Sheet 139 (MD11) Miscellaneous Details 110.25 0.5 1 34.75 $257 $838 Sheet 140 (MD12) Miscellaneous Details 120.25 0.5 1 34.75 $257 $838 4.2 Final Contract Book52040671$3,398$11,078 4.3 Final Bid Form & Cost Estimate2.51020234.5$1,713$5,584 4.4 Final Submittal Assembly48481236$1,712$5,582 Task 4 Sub-total000046.50107.7564136.25415.5001800788$41,843$3,000$0$139,853TASK 5 - FIELD WORK & EASEMENT DESCRIPTIONS--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- 5.1 Geotechnical Field Work8816$776$95,000$111,780Sub = SME 5.2 Field Surveying88340340696$35,490$25,000$140,694 5.3 Wetland Delineation and Tree Inventory Survey8816$690$10,000$13,749 5.4 Easement Descriptions (assumed 20 permanant or temporary)0$0$20,000 Task 5 Sub-total000000161600880340340728$36,956$105,000$25,000$286,222 TASK 6 - PERMITS--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- 6.1 IDEM Construction Permit112204239$1,870$125$6,220 6.2 SWPP & Indiana General Erosion Control Permit112208243$2,055$125$6,824 6.3 IDNR Construction in a Floodway Permitting2020242$1,783$125$5,938 6.4 USACE / IDEM Permitting2020242$1,783$125$5,938 Task 6 Sub-total0000202440084440800166$7,491$0$500$24,919TASK 7 - BIDDING & NEGOTIATING--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- 7.1 Pre-Bid Meeting1010101242$2,566$200$8,564 7.2 Contractor Questions and Addendums10208080204214$11,044$1,000$37,153Sub = SME 7.3 Certified Bid Tabulation114410$487$1,586 Task 7 Sub-total00002131949202000800266$14,096$1,000$200$47,303TASK 8 - CONSTRUCTION ENGINEERING--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- 8.1 & 8.2 Pre-Construction Meeting and Construction Engineering Assitance808020020020401010640$35,474$5,000$5,000$126,392Sub = SME Task 8 Sub-total0000808020020020401001000640$35,474$5,000$5,000$126,392TASK 9 - OWNER AUTHORIZED ALLOWANCE--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- 9.1 Owner Authorized Allowance0$0$40,000 Task 9 Sub-total0000000000000000$0$0$0$40,000 GRAND TOTAL0000495351932.25790698.252151.56248923403406300$340,338$131,000$31,700$1,351,816