Loading...
HomeMy Public PortalAbout2/09/1999 public hearingCity of Greencastle City Hall Four East Walnut Street Greencastle, Indiana 46135 Pamela S. Jones Clerk-Treasurer GREENCASTLE COMMON COUNCIL PUBLIC HEARING TUESDAY, FEBRUARY 9,1999 6:00 P.M. TZOUANAKIS SCHOOL The Greencastle Common Council met for a Public Hearing Tuesday, March 9, 1999, 6:00 p.m. at Tzouanakis Intermediate School. Mayor Michael called the meeting to Order. On the Roll Call, the following were found to be present: Councilor Roach, Councilor Hammer, Councilor Green, Councilor Baynard and Councilor Masten. Also present were: Tom Pitman from Baker and Daniels, Mike Cline and Gary Ladd from Hannum, Wagle and Cline, Mike Brenner from London Witte, City Attorney Trudy Selvia and Attorney Laurie Robertson. This Public Hearing is in regard to the Preliminary Engineering Report and Rate Analysis for Wastewater Treatment Facility. Mike Cline stated that if anyone has questions that are not answered tonight, written questions will be accepted for the next ten days, all of which will become a part of the record and forwarded to IDEM with the PER. Mike Cline distributed a Summary of the PER and discussed these items with the Council and public. (see attached) Councilor Hammer questioned if London Witte Group has rate analysis for different phases and scenarios. Mike Brenner stated he has several different scenarios, but didn't know if this is the appropriate time to discuss them. The floor was opened for public questions and comments. There were no public comments at this time. Mike Cline reminded everyone that there is a copy of the PER on display at the Putnam Countv Library and City Hall. Councilor Masten asked if copies of the Summary handed out tonight could be placed with those copies for people to take if desired. CT Jones stated she will make sure copies are available. Attorney Tom Pitman asked that everyone present sign in on the sheet provided and stated an Environmental Assessment Impact Statement will be mailed to everyone on the list. Being no further business Councilor Roach made the motion to adjourn, seconded by Councilor Masten. Vote was unanimous. I_1 Nancy A. i hael, Mayor ® Pamela ® CITY OF GREENCASTLE WASTEWATER FACILITIES STUDY CHAPTER 1 EXECUTIVE SUMMARY 1.0 INTRODUCTION The Wastewater Facilities Study has been prepared for the City of Greencastle, Indiana, by Hannum, Wagle & Cline Engineering and by Advanced Treatment Sciences, Inc. for the purpose of planning for a new regional wastewater treatment facility to treat the wastewater flows from anticipated growth areas, and to meet the requirements of changing environmental regulations. Additionally, the study has been prepared for the purpose of planning for a southside sewer interceptor; intended to relieve the old and overloaded sewer system of current wastewater, ® eliminate existing lift stations and to transport wastewater that will be contributed from future growth within and surrounding the community. 1.1 SUMMARY OF PROBLEMS The City of Greencastle, Indiana, currently owns and operates a conventional activated sludge wastewater treatment facility that discharges into the Big Walnut Creek. The existing treatment facility has several concerns for future operation, including: 1. The wastewater facility is currently at 96% of its rated hydraulic capacity. 2. The community has received an early sewer ban warning from the Indiana Department of Environmental Management (IDEM). 3. Chronic bypassing at the wastewater treatment plant must be eliminated. According to IDEM records, a total of 102 bypasses were reported during a 12 month period ending in 1997. No bypassing is permitted at the wastewater treatment plant. 4. Excessive infiltration and inflow are creating a problem of hydraulic overloading of the collection system and treatment plant during rain ® events. 1 -1 Hannum, Wagle & Cline Engineering Revised Jan., 1999 Citv of Greencastle Advanced Treatment Sciences. Inc. W;YTF Studv 5. The city of Greencastle is experiencing residential, commercial, and industrial growth and plans should be made for a continuation of this growth. 6. Components of the existing treatment facilities date back to the 1930'5, and many of the existing equipment items are nearing the end of their useful life. 7. The proposed NPDES permit will require the wastewater treatment plant to meet three new criteria: Ammonia- Nitrogen limitations, dissolved oxygen limitations, and reduced chlorine residual in the disinfected effluent. The existing collection system has many problems which include: 1. The collection system experiences high peak flow conditions that are largely caused by rain - induced inflow and infiltration. 2. The collection system is experiencing overloading during peak rain events. 3. The collection system is made up of sections of gravity sewer and many lift stations. In the past, lift stations were built in locations without a master plan; thus, some lift stations were built that could have been combined, resulting in additional operation, maintenance and replacement costs for the City. 4. The existing collection system is old, with some portions of the system having been built in the 1930's or earlier. Many sewers were cut into rock. 5. The future growth in the City is anticipated to occur primanly on the south and eastem sides of the City. Thus, all wastewater contributed by those new developments will need to be transported by a collection system to the treatment plant, which is located on the west side of the City. Without a new interceptor, flow from these growth areas would have to pass through the old and overloaded sewers that exist between those areas of future growth and the treatment plant. 6. The City of Greencastle is expected to continue growing residentially, commercially, and industrially. Future area wide growth that could be served could add as much as 0.80 million gallons per day (MGD) from areas inside the current city limits and as much as 2.43 MGD for potential growth areas immediately adjacent to the City to the southeast, east, northeast, and north. When this occurs, the existing collection system will not be able to meet the increased needs of the City. 1.2 PROPOSED IMPROVEMENTS As stated earlier, there are many main areas of concem with the City wastewater collection and treatment facilities that will need to be addressed in order to bring the City into compliance with State and Federal standards and to facilitate a 1 -2 Hammm, ivagle & Cline Fngineering Remised Jan., 1999 City of Grcencasite Advanced Treatment Sciences, Inc. W11 Studv continuation of the residential. commercial, industrial and institutional growth that the City is now experiencing. In order to achieve these goals, the following recommendations should be implemented: Construction of a new, 2.4 MGD Wastewater Treatment Plant (WWTP) on existing City-owned property to the west of the existing plant. The new facility will be a vertical loop reactor (VLR) process that will be capable of treating peak flows up to 24.0 MGD. The existing facility will be left in place with all flow initially being diverted to the new facility with a portion of the facility being converted to a class "A" pH stabilized sludge processing and storage facility. The existing administrative and laboratory facilities will remain in service at their present location. The new plant will be designed to be expanded in the future up to an ultimate design capacity of 4.8 MGD in average daily flow. A complete description of the proposed facility is found in Chapter 6. 2. A new ` southside" interceptor sewer, 36 inches in diameter and approximately 11,200 feet in length will be constructed. Additionally, approximately 7000 feet of 15 inch diameter force main will be constructed from the Fox Ridge lift station to the southside sewer interceptor. This construction will partially relieve the existing sanitary sewer collection system and facilitate future growth to the east, southeast and south sides of the City. Specifically, this sewer will have a design capacity of 3.11 MGD and will e liminate the following existing lift stations: A. The Cornstalk Lift Station B. The South College Lift Station C. The South Jackson Lift Station When the new interceptor is placed into service, it will have an initial estimated daily flow loading of approximately 0.625 MGD. This volume of flow will effectively be taken off of the existing and overloaded city sewer collection system. 3. The City engineering and wastewater collection system staff continue to investigate and correct rain induced infiltration/inflow over the next 10 years. A system wide flow - monitoring program is recommended to be 0 undertaken in 1999 to assist these offices in assessing the scope of the 1 -3 11annum, Wagle K Cline Engineering Remised Jan.. 1999 City of Greencastle Ach Treatment Sciences. Inc. WWTF Study problem and prioritizing specific areas for future investigative and corrective efforts. These recommendations should be accepted by the City Board of Public Works and Citv Council then submitted to IDEM for their input and approval. 1.3 FINANCIAL CONSIDERATIONS The preliminary cost estimate for a 2.4 MGD wastewater treatment facility and installation of a southside gravity sewer interceptor is $10,936,502; which includes non - construction costs. The new WWTF and interceptor will significantly lower the annual operation, maintenance and replacement costs for the entire system. Assuming project financing with the Indiana State Revolving Loan Fund and the retirement of an existing sewer bond issue prior to incurring the new SRF loan debt, the average monthly sewer bill is expected to increase by approximately $12.84 per home per month. The estimated minimum monthly sewer bill (300 ft 2 ) is expected to rise $4.74. 1.4 IMPLEMENTATION SCHEDULE AND PUBLIC INPUT 1.4.1 IMPLEMENTATION SCHEDULE The proposed project is large in scope and will take several years to complete. Once approval is received from the City Council and the Board of Public Works the first step is to insure that the City is placed on the funding list for the State Revolving Fund (SRF). This will involve a preplanning meeting at the Indiana Department of Environmental Management then submittal of SRF pre - application forms. The SRF Preliminary Engineering Report (this study) should then be submitted for review and approval. A public hearing will be held and verbatim meeting minutes developed and submitted as a part of this process. Since the City is working with the IDEM Compliance Section on correcting the chronic bypassing problem in the shortest possible time, the design of the recommended facilities will be initiated during the preliminary engineering study review process. Any modifications required as a result of the study review process will be incorporated into the design process. Since it is recommended that the SRF financing not be finalized until the project is bid (and the actual costs known), the City will need to arrange for interim financing to cover all pre -bid costs, which include: 1 -4 Hannum. wugle & Cline F_nginecring Revised Jan.. 1999 Ciry of Greencastle Advanced Trealmeni Sciences. Inc. ;HVTF Stuay IN 1. Design Engineering 2. Legal Services 3. Rate Consultant Services 4. Bond Consultant Services 5. Easement Costs 6. Administrative Costs. It is possible that the City could borrow against existing bond funds to be repaid at the SRF loan closing. The SRF Program may also offer interim financing. Note that a 1991 bond issue could possibly be retired in advance to provide revenue to cover any interim financing repayments. Following completion of the design to the point where it is submitted to IDEM for construction permit review, a much more detailed construction cost estimate can be developed. At this point in time, the user rate study can be prepared, the bond council can also complete their preliminary documentation. Any easements or other project costs will also be developed and finalized during this IDEM permit review period. Once all the permits are approved and in place, the project can then be advertised for bidding. The bids will be opened and held for up to 90 days as the SRF loan/bond issue can be finalized, sold and closed during this period. Once the financing is in place the contractor(s) can be issued their notice to proceed. It is anticipated that the New W WTF will take approximately 20 months to construct and the southside interceptor 12 months. A preliminary implementation schedule was developed that anticipated project financing and sewer rate adjustment in May of 2000 and project construction completed in March of the year 2002- Refer to Figure 1.1 for the preliminary implementation schedule. 1.4.2 PUBLIC INPUT This wastewater facilities study has been developed using substantial input from a "study session" group that has been meeting every month since June, 1997. This group included representatives from: The Mayor's office The City Council The Board of Public Works The City Engineer's office The City Legal Council Special Legal Council The WWTF Staff 1 -5 Hannum. Wa,gle & Cline Engineering Revised Jan., 1999 City of Greencastle Advanced Treatmew Sciences, lnc. WWTF Study The Water Plant Superintendent The Putnam County Commissioner's Development Center HWC Staff ATS Staff The Media As the meetings progressed, alternatives to the selected plan as presented in this report were developed and discussed at length, including: upgrading and expanding the existing WWTF (eliminated by the Comprehensive Performance Evaluation), installing flow equalization (hydraulically and site /volume limited, VLP process could accommodate peak flows without equalization) and different sites for the new WWTF (extensive soils investigation yielded fact that city - owned land adjacent to existing plant was suitable and could be gravity fed). Essentially, the altematives development and altematives screening that normally are a part of this printed study were completed over the 12 month study session period by the study group. This process allowed for much more involvement, interest and education by the individuals involved than the typical completed study then present final recommendation process. Meeting minutes for each Wastewater Study Session Group meeting are included in Appendix A. It is proposed that these monthly meetings continue through the design and ® construction phases. Formal approval of this study in its final form will be solicited from the Board of Public Works, the City Council, the Public and the Indiana Department of Environmental Management. Meeting minutes to the public hearing can be found in Appendix B. Also, Board of Works and City Council Resolutions accepting this plan are included in Appendix C. 11 1 -6 Hannum, Wagle & Cline Engineering Revised Jan., 1999 City of Greencastle Advanced Treatment Sciences. Inc. WPYTF Stu dy GREENCASTLE WASTEWATER SYSTEM UPGRADE IMPLEMENTATION SCHEDULE -- ITEM DESCRIPTION 1998 1999 2000 2001 2002 I Complete Planning, Submit To IDEM, Interim Rate Acljustment 2. Design e Com Dsg p I --- I .. Engineering, Submit for Permit 8/1 ------ 3 Receive Permit, Advertise And Bid Project, Obtain Easements 2/1 ------- - 4. Finalize Financing, Ad just 5/1 Sew Rates 5 Construct New Facilities 3/1 0 0 0 �� U INDIANAPOLIS Ph. (317) 271 -1463 )800)792 -3 F" (317) 271-2026 Fa it I  Fe , 8 )994 TAKING CARE, OF THE WORLD'S WATER OAKLANDO GREENWOOD Ph (317) 823< 74 Ph.(317)88 -5715 (8.8)882 -8202 F" (317) 823-2363 F: . (117) MZT -557 a 4 - 3 t`��J,, ioLy /, D98 /MXDeS��n fl�ui��1'8n�������� .T 4 ���� 4 38 %X Desi n FlowCl.Bm�������� ��R��J 3,113 m����d Flow= .9y0 m9��a T,e��,������'`��'" /26 %X(Jes ign F lolu (1,800m9Pa) QeslgnFlau��l. Distributor of jVj3j*g;gW6 Products t C, ��l l