HomeMy Public PortalAboutr 17-189�tnolufian of fly) �-Ioroqtl -of Garterd, �q_ �-
No. 17 -189 Dale of Adoption October 19, 2017
APPROVING CHANGE ORDER #3
NOE STREET DRAINAGE IMPROVEMENTS PROJECT
WHEREAS, the Governing Body of the Borough of Carteret has previously awarded a contract
to Lucas Construction Group, Inc., in the amount of $7,747,747.00 for the Noe Street Drainage
Improvements Project; and
WHEREAS, the Borough's Consulting Engineer for the project, T &M Associates, has advised
the Governing Body that a modification to the contract is reasonable and necessary and has
recommended that the aforesaid contract be modified in accordance with Change Order 94,
attached hereto; and
WHEREAS, Change Order #3 includes a change in the description of work to complete project
construction and reflects as-built quantities; and
WHEREAS, Change Order #3 provides for a net increase in the contract price in the amount of
$18,877.83, resulting in a revised contract price of $8,096,375.28, including all change orders to
date; and
WHEREAS, the Borough's Consulting Engineer, T &M Associates, has advised that the above
described changes and/or modifications to the project were unforeseen at the time of the award
of the original contract.
NOW, THEREFORE, BE IT RESOLVED by the Mayor and Borough Council of the Borough
,of Carteret, County of Middlesex, State of New Jersey as follows:
I. That Change Order #3, attached hereto and made a part hereof, providing for a net
increase of $18,877.83 in the overall contract price, resulting in a revised total
contract price of $8,096,375.28 including any modifications to the original contract
price in accordance with any and all previously approved change orders, is hereby
approved.
2. That the appropriate Borough officials are hereby authorized and directed to execute
Change Order #3 (See Attached).
3. That a copy of this Resolution and a fully executed copy of Change Order #3 be
forwarded to the Borough's Purchasing Department and to T &M Associates for
distribution to Lucas Construction Group.
Adopted this 19 day of October, 2017
and certified as a true copy of the
original on October 20, 2017.
KATHLEEN M. BARNEY, MMC
Municipal Clerk
RECORD OF COUNCIL VOTE
COUNCILMAN
YES
NO
COUNCILMAN
YES
NO
NV
A.B.
BELLINO
X
J011AL
DIAZ
X
JN VA.B.
0W
X
DIMASCIO
X
NAPLES
X - Indicate Vote AB - Absent NV - Not Voting XOR - Indicates Vole
to Overrule Veto
Adopted at a meeting of the Municipal Council C - 19
2017
C LERK '
F -W—. F d p d p m --
i —9
' T &M ASSOCIATES
CONSULTING & MUNICIPAL ENGINEERS SHEET NO.1 OF 2
1455 BROAD STREET, SUITE 250 PROJECT NO. CART -02213
BLOOMFIELD, NJ 07003
CHANGE ORDER NO.3
DATE: April 24, 2017
PROJECT: Noe Streel Drainage Im rovements
OWNER: Borough of Carteret
CONTRACTOR: ILucas Construction Group Inc
TION OF CHANGE:
Relocation of 12" PVC Sanitary Sewer Main to create buildable lots.
Items 44, 45 and 55 are being increased to cover additional tree removal and 12" PVC Sanitary Sewer Pipe.
N/A
Items S -3 thru S -5 are being added to cover a new manhole, modifications to sanitary MH1 and repair of the sanitary
sewer lateral for 34 Harris Street, respectively.
of Time - No extension of time is being provided for the sewer relocation.
5111
APPRO RECOMMENDED:
Donald J. Norbut, P.E., CME
ACCEPTED:
CONTRACTOR:
Lucas Construction Group, Inc.
OWNER'S AP ROVALS:
NOTE: All work to be done
according to Contract
Specifications.
SEE ATTACHED DETAIL
ADDITIONAL
REDUCTION
A. TOTAL REDUCTIONS
THIS C.O.
XXXXXXXXXXX
511.00
B. TOTAL EXTRAS
THIS C.O.
$9,800.00
XXXXXXXXXXX
C. TOTAL
SUPPLEMENTARY
THIS C.O.
59,077.83
XXXXXXXXXXX
TOTALS THIS C.O.
518,877.83
S0,00
NET CHANGE THIS
CHANGE ORDER
518,877.83
$0.00
PREVIOUS CHANGE
ORDERS
5391,350.45
$61,600.00
TOTAL CHANGE
ORDERS TO DATE
$410,228.28
561,600.00
NET CHANGE IN
CONTRACT
5348,628.28
ORIGINAL CONTRACT BID PRICE
CHANGE ORDERS TO DATE
57,747,747.00
5348,628.28
CHANGE ORDER NO.3
SHEET NO. 2 OF 2
PROJECT NO. CART -02213
PROJECT: jNoe Street Drainage Improvements
OWNER: 111orough of Carteret
CONTRACTOR: Lucas Construction Group, Inc.
A. TOTAL REDUCTIONS
$11.00
ITEM
NO.
UNIT
DESCRIPTION QUANTITY PRICE AMOUNT
R
51,000.00
$2,000.00
$3,000.00
$6,000.00
$800.00
E
L
E
8.00 LF
$100.00
X
E
D
T
M
U
R
E
C
A
N
T
T
1
A
O
R
N
Y
A. TOTAL REDUCTIONS
$11.00
B. TOTAL EXTRA
$9,800.00
S
U
P
P
44
45
55
Tree Removal 12 -24"
Tree Removal 24 to 48"
12" PVC Pipe Sched. 80
3.00 UNIT
3.00 UNIT
51,000.00
$2,000.00
$3,000.00
$6,000.00
$800.00
E
L
8.00 LF
$100.00
X
E
T
M
R
E
A
N
B. TOTAL EXTRA
$9,800.00
S
U
P
P
S -3
S4
S -5
Modifications to MHl
New Sanitary MI15A
Sanitary Lateral Repair (34 Harris Street)
1.00 LS
1.00 UNIT
1.00 UNIT
$389.18
$7,800.00
$886.65
5389.16
$7,800.00
$888.65
L
E
M
E
N
T
A
R
Y
C. TOTAL SUPPLEMENTARY
$9,077.83
CCS -002
S340939 -09 I CART -02213
CONTRACT MODIFICATION PROPOSAL AND ACCEPTANCE
1. ISSUING OFFICE 12. PROJECT NO. 13. CONTRACT NO. 14. MODIFICATION NO.
Borough of Carteret
5. TO (CONTRACTOR)
Lucas Construction Group Inc.
PO Box 8939
Red Bank, NJ 07701
6. PROJECT LOCATION AND DESCRIPTION
Revision 10/99
3
Borough of Carteret in area of Noe Street. Installation of storm
sewer improvements will help reduce the amount of local street
flooding and reduce extraneous flow in the area.
7. A proposal is required for making the hereinafter described change in accordance with specification and drawing revisions
cited herein or listed in attachment hereto. Submit your proposal in space indicated on page 2, attach detailed breakdown of
prime and sub - contract costs (See the clause of this contract entitled, "Changes ". DO NOT start work under this proposed
change until you receive a copy signed by the Contracting Officer or a directive to proceed).
3A-9 Donald J. Norbut, P.E.,C.M.E. Constr. Project Manager /l /_- t__�Za
ate Type Name and Title Signature
8. DESCRIPTION OF CHANGE: Pursuant to the clause of this contract covering changes, the contractor shall furnish all
labor and material, and all work necessary to accomplish the following described work.
Relocation of 12" PVC Sanitary Sewer Main to create buildable lots resulting in additional tree removal and modifications to
sanitary MH and repairs
As a result of the above, the contract price is revised as follows:
ITEM NO.
ITEM DESCRIPTION
Extra
44
Tree Removal 12 -24"
45
Tree Removal 24 to 48"
55
12" PVC Pipe Sched. 80
Supplementary
S -3
Modifications to MH1
S -4
New Sanitary MH5A
S -5
Sanitary Lateral Repair (34 Harris Street)
TOTAL COST
OF THIS MODIFICATION $ 18,877.83
UNIT ESTIMATED
PRICE QUANTITY TOTAL COST
$1,000.00 3.00 UNIT $3,000.00
$2,000.00 3.00 UNIT $6,000.00
$100.00 8.00 LF $800.00
$389.18 1.00 LS $389.18
$7,800 1.00 UNIT $7,800.00
$888.65 1.00 UNIT $888.65
The contract time is hereby: increase ❑ decrease❑ or remains the same 0 by calendar days as a result of
mp b accepted:
'ji CA-5 (Owsmo BY: U
.1®— (9 , 17 DATE: l) 2
APPROVAL:
STATE OF NEW JERSEY
(NJPE SEAL) ENGINEER
_ BY: I�QA J AIWA t�
DATE: - ) / 2-9/1 - 1
DATE
G:\ Projects \CARn02213 \Construction\Payment \Change Order No. 3 NJDEP.doc Page I of 3
CCS -002 Revision 10/99
CONTRACT MODIFICATION PROPOSAL AND ACCEPTANCE
9. ISSUING OFFICE
Borough of Carteret
10. PROJECT NO.
5340939 -09
11. CONTRACT NO.
CART -02213
12. MODIFICATION NO.
3
13. CONTRACTOR'S PROPOSAL — CHANGE IN CONTRACT PRICE
(Detailed breakdown, attach additional sheets as necessary)
(Proposed)
NET INCREASE
$ 18,877.83
NET DECREASE
$ XX
CALENDER DAYS INCREASE
0 DAYS
DATE:
TYPE NAME AND TITLE:
SIGNATURE:
G:\ Projects \CART\02213 \Construction\Payment \Change Order No. 3 NJDEP.doc Page 2 of 3
CCS -002 Revision 10/99
CONTRACT MODIFICATION PROPOSAL AND ACCEPTANCE --
14.
ISSUING OFFICE & PROJECT NO.
15. CONTRACT NO.
16. MODIFICATION NO.
Borough of Carteret S340939 -09
CART -02213
3
17.
ORIGINAL CONTRACT BID PRICE ... ............................... $ 7,747,747.00
TOTAL OF PREVIOUS CHANGE ORDERS ......................... $ 329,750.45
TOTAL CONTRACT COST INCLUDING CHANGE ORDERS ... $ 8,096,375.28
18.
NECESSITY FOR CHANGE AND REASON FOR OMISSION FROM PLANS AND SPECIFICATIONS:
Field Modification based on construction conditions to accommodate future development and create buildable lots.
19.
OTHER IMPACTS RESULTANT OF THIS CHANGE:
N/A
20.
RESUME OF NEGOTIATIONS OR RECOMMENDATIONS (Loanee's Representative) :
DATE:
TYPE NAME AND TITLE OF LOANEE'S
SIGNATURE:
REPRESENTATIVE:
G:\ Projects\ CART\02213 \Construction\Payment \Change Order No. 3 NJDEP.doc Page 3 of 3
5418925 Borough of Carteret
OFFICE OF
KATHLEEN M. BARNEY, RMC /CMC
MUNICIPAL, CLERK
10:21:15 a.m. 11 -01 -2017 112
, Pjarlau g 4 -af Q6arf1=-,f
MIDDLESEX COUNTY
TEL (732) 541 -3800
FAX (732) 541 -8925
61 COOKE AVENUE
CARTERET, NEW JERSEY 07008
11'1
TO: Patrick DeBlasio,
Treasurer
Borough of Carteret
REQUEST FOR CERTIFICATION OF AVAILABLE FUNDS:
For:
Name of Account:
AMOUNT TO BE ENCUMBERED:
KATHLEEN M. BARNEY, .
Municipal Clerk
CERTIFICATION OF.AVAILABILITY OF FUNDS
I, Treasurer of the Borough of Carteret, do hereby certify that 'RO CFC�
there are sufficient funds available in the current budget to
enable the Municipal Council to authorize the entering into a
Contract between the Borough of Carteret �c /� L
LuC� �A� S fiL�i� �r st�..✓1 F
The funds available this contract are in the Budget, in the S OF
account of:
in the amount of:
By this certification, I have hereby encumbered the above named
account for the amount of the contract nding Council action.
Patr DeBlasio,
Trea urer
DATE: t 1 4 h
AFFIDAVIT OF PUBLICATION
The following is a true copy of an Ordinance or Resolution of
the Borough of Carteret that has appeared in the Home News
Tribune, a newspaper which is printed in Freehold, New
Jersey and published in Neptune, in said County and State and
of general circulation in said county. One 1 time(s), once in
each issue as follows:
November 17, 2017
Kathleen M. Barney, MM '
Municipal Clerk
BOROUGH OFCARTERET
CARMELA POGORZELSKI
NOTARY PUBLIC OF NEW JERSEY
MY Commission Expires 9/27/2022
NOTICE OF AWARD OF CHANGE
ORDER
Please be advised that on October 19, 2017 the Borough Council
of the Borough of Carteret, Middlesex County, New Jerrey, adopted
a Resolution authorizing Chan Order 03 providing for a net in-
crease in the contract price m the ge amount of $18,877.83 resulting in
a revised contract price of $8,096,375.28.
The Change Order specifically was for Lucas Construction Group,
Inc. for the Noe Street Drainage Improvements Project and included
a change in the description of work to complete project construc-
tion and reflects as -built quantities.
The Borough's Engineer has certified that the change was necessary
and not anticipated at the beginning of the project.
Copies of Resolution #17 -189 and supporting documents are on file
at the Borough Hall, Municipal Clerk's Office, 61 Cooke Avenue,
Carteret, New Jersey.
KATHLEEN M. BARNEY, RMC/MMC
Municipal Clerk
($20.24)
Sworn and subscribed before
me this `► day of Qh U2 �;�o 1-f
Ad Number: 0002539856 Run Dates: 11/17/17
BOROUGH OF CARTERET
NOTICE OF AWARD OF CHANGE
ORDER
Please be advised that on October 19, 2017 the Borough Council
of the Borough of Carteret, Middlesex County, New Jersey, adopted
a Resolution authorizing Change Order #3 providing for a net in-
crease in the contract price in the amount of $18,877.83 resulting in
a revised contract price of $8,096,375.28.
The Change Order specifically was for Lucas Construction Group,
Inc. for the Noe Street Drainage Improvements Project and included
a change in the description of work to complete project construc-
tion and reflects as -built quantities.
The Borough's Engineer has certified that the change was necessary
and not anticipated at the beginning of the project.
Copies of Resolution #17 -189 and supporting documents are on file
at the Borough Hall, Municipal Clerk's Office, 61 Cooke Avenue,
Carteret, New Jersey.
KATHLEEN M. BARNEY, RMC /MMC
Municipal Clerk
($20.24)