Loading...
HomeMy Public PortalAbout03-14-1930 370 Office of Board of Public Works City of Richmond, Indiana, Friday March 14th, 1930. The Board of Public Works of the City of Richmond, Indiana, met in regular session at the office of said Board Friday March 14th 1i30, at 9 o 'clock A.M, Messrs, Edmondson and Dye being present; iV!r. Peelle ceing absent, two members of said Board being present, the following proceedings were had, to-wit : The minutes of the breceeaing meeting were approved as read. Permission was granted to Russell Hendrix, to cut the curb on north side of National Road 'west, at Lot 1, 21&3 . Hghts, Kidd. , I/ Permission was granted to Mrs. Heironimus, to remove the tree in front of 218 North lath Street, with orders to remove the stump below the surface of walk. The Board met to hear all persons interested, or whose property is affected by the improvement of West Main Street, by construct- ing 6 ' cement sidewalk on the north side of said street, from Northwest 8th to llth Street, under Improvement Resolution No. - 906-1930. No one appearing or remonstrating, the Board decides that the benefits to the property liable to be assessed for said improVements are equal to the cost of same as estimated by the City Civil Engineer, and thereupon take action on said resolution the same being confirmed without modification. The Board met to receive bids under Ii5j_ovement Resolution No. 907-1930, for the construction of storm-sewer in South 8th Street from South" 0" to "P" Street, in "P" Street 60 feet west; thence by ditch to South 7th Street, as follows, to-wit : E. A. Mariani Co. , Inc. , bid; 36" reinforced concrete pipe sewer complete ---w5. 67 lin-ft . 5LE.11 n n tr rr ze 11. 57 is 12" Vit pipe sewer to inlets complete 1. 50 r� inlets & Connections set complete - 25.00 etch manholes complete -- -5 ,.00 Lower bottom of present manhole 2 feet. 15.00 Open Ditch complete - - 1. 21 lin-ft. Total estimated cost -- L523. 50 '.' John F. Hipskind, bid; 36" Reinforced Concrete or monolithic pipe complete-- 6.4-5 lin-ft . 54" n U " n` " _- 9 . 70 " 12U Pipe to inlets complete _ -- 1. 50 Open Ditch complete---- -- 1. 50 - Inlets & Connections set complete 29.00 eaeh ,A nholes complete 59.00 Lowering bottom of present manhole 2 feet 40.00 - Total estimated cost -- LI-760.00 (See next page) . - I Friday tharch lei-th, 1930. 371 Bids cont 'd. , " Lee Ridgeway, bid; 36" Reinforced Concrete Pipe sewer complete - . rib li n-ft . 36" Armco Pipe Sewer complete 7. 00 54H Reinforced Concrete Pipe sewer complete ' 11. 6b 54" Armco Pipe Sewer complete 12.40 12" Pipe to inlets laid complete 1. 60 '! Open ditch complete - 2.02 h Inlets & Connections set complete-- - 30.00 each I/ M.lnholes complete- - 70.00 Lowering bottom of- present manhole 2 feet 25.00 Focal estimated cost on reinforced concrete-°yr51.L .00 The bid of the E. A. Mariani Co. , Inc. , being the lowest and being within the estimate of the City Civil Engineer, the contract was so awarded. - • • • The Board then adjourned, 1C7 41N---\1 Pr est. Of Bocrci Attest : Clerk of Board