Loading...
HomeMy Public PortalAbout04-29-1929 264 - Office of Board of Public Works City of Richmond, Indiana, Monday Apr-il 29th, 1929. The Board of Public Works of the City of Richmond, Indiana, met in regular session at the office of said Board Monday April 2-9th, 1929, at 9 o 'clock A.M. All the members- of said Board,Messrs,Reid, McFail and Henley being present. The following proceedings were had, to-wit : - A petition for construction of cement curb & gutter on both sides of Northwest 3rd Street, from Randolph to Lincoln Street, was re- ceived, Clerk directed to mail the same to Councilman F.Benn, in I/ an effort to construct c.& g. from Randolph to Kinsey Street. The Board directed the Richmond Water Works.- Corp. , to extend the 6" water main. in New Paris- Pike, -from North 12th Street east 700 more oz less and install -fire hydrant to be located by Fire Chief. The Board unanimously adopted Improvement _Resolution No. 896-1929 for the improvement of both sides of Sheridan Street, by construct- . ing driveway curbs, extending from outside edge of present side- walk to present gutter line, from north side pf- Railroad Bridge to State Street. - - - The Clerk was instructed to notify Andrew Walker, that in matter of side ditches in ParryStreet, -if property owners desire to cross the same for. driveways, -they should place tile in trenches at their own expense before filling the same. - In matter of bid received from Garfield Dixon, the clerk was in- structed to notify Mr. Dixon, the mail said bid to the property owner Wm. Curtis, Fort Woith, Tex. , Claims in amount of $8,072.07 were allowed. - The Board then adjourned, Prest. of Board - Attests . C//- Clerk of Board