The Board met to hear all persons interested or whose property is
affected under Improvement Resolution No. 863-1928, for the improve-
fnent of Ridge Street, by constructing cement sidewalk, curb & gutter
& planting trees on both sides of stretit, and grading &_ pa.ving the
roadway with one of the following pavements, Sheet Asphalt, Rock As-
phalt, -Reinforced Concrete or Bituminous Macadam, After hearing all
persons interested who appeared, A remonstrance Prying o'dun filed
against said improvement, Stephen Napier and Irvin Batchelor, re-
quested to take their and their wires names from the remonstrance
- they were -permitted so to do. , the Board referred the remonstrance
- to the city engineering department for investigation and continue
said hearing to Monday May. 28, 1928.
The -Board met to hear all persons interested or whose property is
affected under Improvement Resolution No . 86 --1928, . for the improve-
ment of •Sou.th " L" Street, by constructing cement curb & gutter on
both sides 'of street, paving xgthxrunmrutx a. strip 18 feet wide thru
t center -of street,, with one of the following p avements, Rein-
forced, Concrete, Sheet -Asphalt, Rock Asphalt or Bituminous Macadam
Also, paving the remainder of the roadway to the edge of the gutter
on both sides with surface treated macadam on a cinder gravel base,
from South '5th to 9th Street, After hearing all persons interested
and considering a remonstrance filed against said improvement , the
Board referred emonstrance to the Engineering Department for in-
vestigation as to property holders etc. , and thereupon decide that
- the benefits to the 'property liable to be assessed for said improve-
ments are equal to the cost of same as reported by the City Civil
Engineer and 'thereupon take final action -on said resolution, the
same being confirmed subject to the report of -engineer on the re-
monstrance.The Clerk was directed to advertise for bids, -on 1, 000 feet of
Fire Hose, for use of Fire Department . -
Permission was granted Corwin Smith to cut the curb for driveway
at West 5th & Peacock Road.
Sup 't . of Parks, reported that upon the instruction of the Board,
his employees had labored 6 hours installing equipment at "Day Nurse-
ry, and 7 hours at Starr Park at Memorial installed by Historical
IlL Society in memory of David Hoover.The .Board unanimously adopted Improvement Resolution No. 865-1928
for improvement of Richmond Avenue, by constructing cement curb, &
- gutter, sidewalks where needed and grading & paving the roadway
with either Sheet Asphalt , Rock Asphalt , Reinforced Concrete or
Bituminous Macadam and planting of trees from Seogwick. to Northwest
9th Street .
The Sup 't . , of Parks was directed to raise no more plants at Glen
Miller Park, other than needed for nark purposes .
140 Thursday May 24th, 1928.
The Board received bids under Improvement Resolution No.856-1928
for the improvement of School Street, by constructing cement
sidewalks, curb & gutter and planting of trees on both sides
of street and grading street, from Sheridan to Northwest 5th
Street, as follows to-wit :
J. L. Teegarden & Co. , bid;
Cement sidewalks & walk intersections $0. 20 sq-ft .
Cement curb & gutter, straight & circle 1.00 lin-ft .
Reinforced concrete, roadway---- 2. 25 sq-vard
grading - ). 50 cu-yard
New Inlets & connections set complete 20.00 each ilr
Trees set complete - 3 .00 "
Resetting, inlets 5.00 "
12" inlet pipe laid 1.00 lin-ft .
" Pyle & Ridgeway, bid;
Cement s idewa.lk-&--alf-in4e eeetiene $0. 18.Q sq-f t .
Cement curb & utter, straight- 1. 11, circle 1.35 lin-ft .
(Reinforced concrete, roadway 2. 55 sq-yard
Grading-.43 cu-yard; New Inlets-$18.00 each, trees-43. 00 each
Resetting inlets - --- W).00 each, 12" inlet pipe-41.0 -ft .
" Daniel G. Burkhardt, bid;
Cement sidewalk & walk intersections :`'0. 25 sq-foot
Straight curb & gutter-41.172i Circle C. & G. 1.35 lin-foot
Reinforced concrete, roadway 2.80 sq-yard.
Grading- . 60, cu-yard;New inlets-y 20. 00; ; Trees-` 3 .00 each
Resetting inlets - 410.00 each, 12" inlet pipe 2.00 tin-foot
" B. A. Mariani, bid;
Cement sidewalk & walk intersections 4 0. 22 s -foot .
Straight & Circle curb & gutter cement 1.C-21in-foot
Reinforced concrete roadway .E 2. 50 s Trd.Gra.ding-.49 cu-yard
Newinlets- 10. 00;Resetting inlets-`44' 10.00; Trees-43.00 each
12" inlet pipe laid 1. 50 lin-ft.
" W. L. Magaw, bid;
Cement sidewalk74 0.2 ' sq-ft . straight C .& G.$1. 10 lin-foot
Circle C. & G. $1. 50 lir.-ft ; Cement walk intersections-. 25, sq-ft .
Reinforced concrete, roadway-42. 75 sq-yd. Grading . 60 cu-yard.
New inlets- 20. Trees- 3 . Resetting inlets-410. each 12" inlet
pipe laid, +71. 50 Der linear foot.
The bid of J. L. Teegarden & Co. , being the lowest and being
within the estimate, contract was so awarded.
The Board received bids under Improvement Resolution No . 858-
1928, for improvement of alley between North 3rd & 4th St . from
" C" Street north to alley 1st south of North "D" St ; thence
-east to 4th Street, cement roadway as follows, viz :
" Daniel G. Burkhardt, bid;
Cement roadway - 40.24 sq-foot ; Sewer connections-. 1. 50 lin-ft.
" Pyle & Ridgeway,bid;
Cement roadway complete-. 25 sq-ft ; Sewer connections $3 .00 "
The bid of Daniel G. Burkhardt, being the lowest & within
the estimate of city civil engineer, contract was so awarded.
Thursday May 24th, 1928. 1 41.
The Board received bids,under Improvement Resolution No . 8 7-1928
for the improvement of Maple Street, by constructing cement sidewalk
4' wide, curb & gutter,planting trees on both sides and grading &
paving the roadway with one of the following kinds of pavements,viz:
" J. L. Teege.rden & Co. , bid;
Street Complete using Rock Asphalt -- $ll.00 per lin-foot
Street complete " Reinforced Concrete 10.25 "
" Pyle & Ridgeway, bid;
Street complete, Rock Asphalt $11. 72 per lip-foot
. Street complete Reinforced Concrete 11.69 "
" W. L. Magaw, bid;
Street complete, Bituminous Macadam N1l. -0 per lip-foot
Street complete Rock Asphalt ----- ----- 13 .05 " "
Street complete Reinforced Concrete - 11. 75
" E. A. Mariani & Co. , bid;
Street complete, Bituminous Macadam $12, 20 per tin-foot
Street complete, Rock Asphalt---- 13 . 10 "
Street complete, Reinforced Concrete --- 12.86 " "
The Board now designate that said street be paved using Re-inforced
Concrete for said paving.
The Board received bids,under Improvement Resolution No. 861-1928
for the .improvement of the alley between South 9th & 10th Street,
by constructing cement roadway, from South -"A" Street, north to the
1st alley south of Main Street, running east & west, as follows :
"• Daniel G. Burkhardt, bid;�}
Cement roadway complete-$0. 23* sq-foot, Sewer connections-4$1.50 lin-fl
" Pyle & Ridgeway?, bid;
Cement roadway - yp0. 24 sq-foot, Sewer connections---5$1. 50 lin-foot .
The bid of Daniel G. Burkhardt, being the lowest & within the esti-
mate, the contract was so awarded.
The Board received bids under the specifications for re-roofin_,
the dwelling 618 North 10th Street, known as, "Starr Park dwelling"
as follows, to-wit :
- John Taylor & Russell McMinn, bid;
Re-roofing complete -$319. 56, New box gutters ,400 ft . chimney-$15,00
" Clyde C. Nicholson, bid; .
Re-roof ing-u325.00-; New box gut ters-3 50 ft . Flue- :$20. 00.
" Arthur Thomas, bid;
Re-roofing-$365. 00; New box utters-l5d ft . Flue- $3.00 1in-foot
" C. W. Bundy, bid;
Re-roofing- 369.43 ; New box gutters-80q ft . Flue- ?38.00
The bid of John Taylor & Russell McMinn, being the lowest and
best bid, upon recommendation of Building Inspector, contract was so
awarded.
Clerk was directed to notify, Street Car Co . , to stop using Southwest
5th Street for parking & switching their freight cars .