HomeMy Public PortalAboutBOH4.20.22additionalGENERALNOTES: DEEP OBSERVATION HOLE LOGS N
NO SCALE
A. CONTRACTOR SHALL N011FY "DIG -SAFE" AS REQUIRED PRIOR TO THE START OF ANY
EXCAVATION WORK. CONTRACTOR IS RESPONSIBLE FOR PROTECTING UTILITIES WITHIN THE DEEP OBSERVATION HOLE 1 EL. = 39±
WORK AREA DURING CONSTRUCTION.
B. THIS PLAN IS FOR SEWAGE DISPOSAL SYSTEM DESIGN PURPOSES ONLY.
C. CONTRACTOR SHALL DETERMINE THE LOCA11ON OF EXISTING UNDERGROUND UTILITIES PRIOR TO
EXCAVATION.
D. ALL CONSTRUCTION SHALL CONFORM TO THE STATE SANITARY REGULATIONS (310 CMR 15.00)
AND ALL OTHER APPLICABLE LOCAL, STATE, AND FEDERAL CODES AND REGULATIONS.
DEPTH FROM
SURFACE
SOIL
HORIZON
SOIL
TEXTURE
SOIL COLOR
MUNSELL
0" - 8"
A
LOAMY SAND
10 YR 3/4
8" - 34"
B
LOAMY SAND
10 YR 5/8
34" - 132"
C1
M/C SAND
10 YR 8/6
DATE OF TESTING: 3/10/22
E. CONTRACTOR TO VERIFY EXISTING CONDITIONS, INCLUDING ELEVATIONS OF EXISTING BUILDING PERCOLATION RATE: LESS THAN 2 MIN/INCH IN C1 LAYER (PERC ® 65")
SEWER, AND REPORT AND DISCREPANCIES TO THE DESIGN ENGINEER PRIOR TO THE SETTING WITNESSED BY: KEITH E. FERNANDES, PE, DIG -IT CONSTRUCTION LLC
OF ANY SEWAGE DISPOSAL SYSTEM COMPONENTS. AMY VON HONE, DIRECTOR, BREWSTER HEALTH DEPARTMENT
NO GROUNDWATER ENCOUNTERED
SEWAGE DISPOSAL SYSTEM NOTES: USE A LOADING RATE OF 0.74 GPD/SF FOR SIZING OF SOIL ABSORPTION SYSTEM.
1. H-20 RATED COMPONENTS SHALL BE REQUIRED IN ANY AREAS SUBJECT TO VEHICULAR �7 TAT
LOADING AND AS REQUIRED ON THE PLAN. PLAN VIE 11
2. THE DESIGNER WILL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UNLESS SCALE' 1" = 20'
CONSTRUCTED AS SHOWN. ANY CHANGES OR DEMA11ONS FROM THIS PLAN MUST BE
APPROVED IN WRITING.
3. ALL GRAVITY SEWER PIPE SHALL BE 4" DIA. SCH 40 PVC UNLESS OTHERWISE NOTED. THE Existing Cesspool 1
MINIMUM SLOPE OF 4" DIA. SCH 40 PVC SHALL BE 0.01 FT/FT. (See Note#6)
RELOCATED PLUMBING
4. SOIL ABSORPTION SYSTEMS MUST BE VENTED WHEN DISTRIBUTION LINES EXCEED 50 FEET IN (SEE NOTE#12)
LENGTH, WHEN LOCATED IN AREAS SUBJECT TO VEHICULAR LOADING, AND WHEN PRESSURE Existing Leach Pit
DOSED.
(See Note#7) �
5. FINISHED GRADE SHALL BE A MAXIMUM OF 36" AND A MINIMUM OF 9" OVER THE TOP OF ALL
SYSTEM COMPONENTS. 39
6. EXISTING CESSPOOL TO BE PUMPED DRY/ABANDONED
7. EXISTING LEACH PIT TO BE PUMPED DRY AND REMOVED.
8. ALL SEPTIC COMPONENTS SHALL BE INSTALLED WATERTIGHT. pweping
Existin�g1 Space
9, COMPONENTS TO BE PROVIDE WITH WATERTIGHT ACCESS COVERS RAISED TO WITHIN 6" OF CEL =36.3f
GRADE WHERE REQUIRED.
10. PRIOR TO FINAL INSPECTION BY THE ENGINEER AND THE BOARD OF HEALTH ALL SYSTEM
COMPONENTS MUST BE INSTALLED INCLUDING ALL ACCESS COVERS WITH RISERS.
Breezeway No
11. SOIL REMOVAL: ALL TOPSOIL AND SUBSOIL SHALL BE REMOVED FOR A DISTANCE OF 5' FROM Foundation
THE SOIL ABSORPTION SYSTEM DOWN TO THE CLEAN SAND LAYER, LAYER C1. AREA TO BE -
BACKFILLED WITH CLEAN "TITLE 5" SAND AND COMPACTED TO MINIMIZE SETTLING. dation
CONTRACTOR TO NOTIFY TOWN AND/OR ENGINEER TO VERIFY SOIL REMOVAL AS REQUIRED. Slab Foun a
E1-=38
12, EXISTING WASTELINE: EXISTING SEWER EXIT LINE SHALL BE REROUTED TO LOCATION (A) AS
SHOWN ON THE PLAN VIEW AND TO THE ELEVATION SHOWN ON THE SCHEMATIC FLOW Crawl i
PROFILE. ALL WORK SHALL BE COMPLETED BY A MASSACHUSETTS LICENSED PLUMBER. Space f
PLUMBER TO CONFIRM AND APPROVE LOCATION AND ELEVATION OF PROPOSED SEWER LINE ELF=
PRIOR TO THE SETTING OF ANY SEPTIC COMPONENTS.
PRIMARY CESSPOOL )
13. HOMEOWNER PROPOSED VENT LOCATION PRIOR TO INSTALLATION (SEPTIC TANK -SEE NOTE#17)
14, WATER LINE SLEEVE- EXISTING WATER line TO 58 PILOTS WAY SHALL BE SLEEVED WITHIN 10'
OF ANY SEPTIC COMPONENT (SEE PLAN VIEW FOR DETAILS). OVERFLOW CESSPOOL
(L!EACHING-SEE NOTE#17)
15. WATER LINE REROUTING/SLEEVE - EXISTING WATER LINE FOR 55 ANCHORS AWAY (LOCUS
PROPERTY) SHALL BE RELOCATED AND SLEEVED (SEE PLAN VIEW FOR DETAILS). PROPOSED SOIL REMOVAL
16. 43 ANCHORS AWEIGH: HOUSE AND SEPTIC LOCATION PER PLAN BY DOWN CAPE ENGINEERING (SEE NOTE#11)
ON FILE AT THE BREWSTER BOARD OF HEALTH.
17, 58 PILOTS WAY: EXISTING PRIMARY CESSPOOL (SEPTIC TANK) AND OVERFLOW CESSPOOL PROPOSED VENT
(LEACHING - SETBACK 25.6' MIN) LOCATION PER INSPECTION REPORT DATED 5/13/91 ON (SEE NOTE #13)
FILE AT THE BREWSTER BOARD OF HEALTH.
SCHEMATIC
NOT TO SCALE
TOP OF FOUNDATION
FLOW PROFILE
RAISE COVERS
TO WITHIN 6" OF
FINISH GRADE WITH H-20
EL= 42.5±
DIRT FLOOR CRAWL SPACE COVER AND RISERS
EL=39.7±
FINISH GRADE=38 Ot
(2)'4"-SCH. 40 PVC 37.Of
r-CIEAN-OUf. WITH SCREW CAP
RAISED TO WITHIN 4' OF GRADE
- a
4" DIA SCH 40 DROP: 2" min.
PVC PIPE 3" may.
10"
_ ' I *PROPOSED 35.75
.l (SEE NOTE #12)
22'±
14"
GAS BAFFLE
Gaal
ST
n
-
.�X LOT #77 0
ARE �� 5,800 SQ. FT. I � r�n
a
I
!. Eztsfn9 3
Bedroom Dwelling :- I
;;Top EL F42 5f tlon : a
OS ' o -r-I
IS 0
1 f
Dirt DrriewaY
rn . Exlstng. ..
41
rn �
Existing is
Dwelling
SYSTEM DESIGN CALCULATIONS:
DESIGN FLOW:
EXISTING 3 BEDROOM DWELLING AT 110 GAL PER DAY PER BEDROOM = 330 GPD
330 GPD X 200% = 660 GALLONS - USE NEW 1500 GALLON TANK - (H-20) (TITLE 5 MIN.)
12.83' W. X 2' D. LEACHING CHAMBER (H-20) CAN LEACH:
Vt = [(25 X 12.83) + (25 X 2)2 + (12.83 X 2)2] X 0.74 GPD/SF = 349 GPD
A GARBAGE DISPOSAL IS NOT PERMITTED WITH THIS DESIGN.
INSTALL•
1500 GALLON SEPTIC TANK (H-20)
500 GALLON LEACH CHAMBERS (H-20) WITH STONE AROUND (SEE SAS DETAIL)
3 OUTLET DISTRIBUTION BOX (H-20)
IN-HOUSE VARIANCE REQUEST
LOCAL UPGRADE APPROVALS: 310 CMR 15.403
VARIANCE: 310 CMR 15.211 (Setbacks)
1.) Soil Absorption System not 10' from South Property Line
6' held 4' variance
2.) Soil Absorption System not 10' from West Property Line
7' held 3' variance
3.) Septic Tank not 10' from West Property Line
6' held 4' variance
Existing Water Service
to 58 Pilots Way
To Remain and Be Sleeved
PROPOSED RELOCATED WATER
SERVICE WITH SLEEVE TO
LOCUS PROPERTY
BENCHMARK
TOP OF CONCRETE
BOUND EL = 41.9±
(NAVD88)
INSPECTION
PORT
PROPOSED SOIL REMOVAL
(SEE NOTE#11)
PROPOSED VENT
(SEE NOTE #13)
RAISE (1) COVER (1) "SWEET -AIR" VENT -
RAISE COVER (SEE NOTE #13)
TO WITHIN 6" TO WITHIN 6" OF
OF FINISH FINISH GRADE
GRADE WITH WITH H-20 RISER
H-20 COVER AND COVER
AND RISER FINISH GRADE=38.0± FINISH GRADE = 39 (MAX) - 38 (min)
LINE(S) EXITING D'BOX SHALL HAVE 24-36" Proposed
SCH 40 SPEED LEVELERS AND SHALL REMAIN (9" Min - 36" Max)
PVC PIPE LEVEL FOR 2'-0" BEFORE PITCHING
DOWN TO LEACHING FACILITY
Y--4" DIA SCH 40 PVC PIPE � 36.1±
DROP
35.47
ALL
COMPACTED BASE
SAS DETAIL
SCALE: 1" = 10'
FLOOR PLAN
NOT TO SCALE
BED
pW1NG
KITCHEN
u�NG
BED 1 BED
ST �St9 tiF'lej,l�,��c,
1. FEF?! A.� :OLS (^
CiViL
CP CD
( No. 433723
w
CCFFSO/OVAL
ltsorZ' 'o
CHPMBER
STONE �� BUILD UP
COVER
g 5'
25
g,5
4
t'ermit valid for REPAIR OF SEPTIC SYSTEM ONLY, due to
(1) 4" SCH. 40 PVC State and Local septic variances. Board of Health review and
INSPECTION PORT aPP►uval is required for any future additions!renovations/alterations
to sewage facilities and/or structures/dwelling,
W/ 18" PIECE OF #4
REB RAISE TO WITHIN Brewster Health Department
4" OF GRADE APPROVED2
PIPE SHALL BE y
PERFORATED WITHIN (�-�
FIELD
LZ!ame
Date
2" LAYER OF 1/8" - 1/2" STONE (OR FILTER FABRIC)
2' EFFECTIVE 3/4" - 1-1/2" STONE DOUBLE WASHED STONE
35.10 DEPTH
0 20 40 60
PROPOSED 1,500 GALLON DB -3 W/ 6" LAYER OF USE (2) SHOREY PRECAST (OR EQUAL)
D -BOX CRUSHED STONE ALL 500 GALLON LEACH CHAMBERS (H-20)
SEPTIC TANK (H-20) WITH STONE AROUND (SEE SAS DETAIL)
(H-20)
(END VIEW)
1't 14't LONGEST RUN . LEACHING CHAMBER
25' x 12.83' x 2.0'
C: Users\kfern�Dig It Construction Dropbox�AAEngineering�Active Jobs�7008 - 55 Anchors Aweigh -
Brewster\CAD\Plans\7008-SAS(REVISED4-12-22).dwg
5:1' SCALE 1 "=20'
-EL=28t BOTTOM OF TEST PIT #1
REVISED 4/12/2022:
ABUTTING DWELLING AND SEPTIC INFO ADDED
V DIG -IT
CONSTRUCTION, LLC
PO BOX 268 SOUTH DENNIS, MA 02660
PHONE: 508-432-1635
www.digitconstructionllc.com
cuENr:
MICHAEL ORTWEIN
2618 COVINGTON PLACE
BLOOMFIELD VILLAGE, MI 48301