HomeMy Public PortalAbout08-11-1924 •
1 24 Office of Board of Public Works
City of Iiichmond, Indiana,
Monday August 11th , 1924.
The Board of Public Works of the City of Richmond , Indi ana., met
in regular session at the office of said. Board. Monday August llth
1924, at 9 o' clock A. M. All the members of said Board Messrs ,
Land , McFall and Henley being present. The following proceedings
were had, to-wit : - _ _
The Board received communication from W. Graves, Chief Engineer
of the T. H. I. E. Traction Co. , that he accepts the offer of
the City, in matter of additional cost of using brick stretcher
along their right of way in West 5th Street paving improvement
agreeing to pay one-half said additional cost of200.00.
The Richmond City Water Works , were instructed to extend their
water main in Ratliff Street , from present main to Stevens Street
and run servi ce s to curb at vario us lots . _
The City Civil Engineer, reported the completion of contract un-
der Improvement Resolution No. 736-1924, for paving North 19th St.
with Asphalt from Main to North "C" Str eet. The Board accepted
the same and ordered assessment roll prepared.
The Board directed Fire Chief E. E. Hiller, to attend. the Fire
Chiefs Convention to be held at Buffalo , N. Y. August , 19th to
24th , 1924. , legitimate expenses to be paid by the. City , out of
Fire Department Miscellaneous expenses.
The Board received bids for improvement of the alley 1st north of
South "E" Street, from South 6th Street east to alley , under Im-
provement Resolution No. 746-1924, as follows to-wit :-
Daniel G. Burkhardt , bid ;
Cement roadway complete -- .21,4 sq-ft. 6" sewer connections , 54.25 ft.
E. A. Mariani , bid ;
Cement roadway--. 22V sq-ft . 6" sewer connections.--6'2.50 lin-ft.
" Schnieder Bros . , bid;
Cement roadway—. 26 sq-ft. 6" sewer connections.-- 2.00 tin-ft .
" Z. B. Pyle & Co . , bid ;
Cement roadway- .- .27 sq-ft .6" sewer connections--y2. 11 ,tin-ft .
The bid. of Daniel" G. Burkhardt, being the lowest and within
the estimate of ci ty civil engineer, contract was so awarded.
The Board received bids, for construction of sidewalks on west side
of N.16th St, from N. "F" St. to river and on east side from N. "J"
St. to river, under Improvement Resolution No. 747-1924, as fol-
lows, to -wit : -
" E. A. Mariani , bid ;
Six foot cement sidewalk---- .20 sq-foot
8
" Daniel G. Burkhardt , bid ;
Six foot cement sidewalk . 202 sq-foot
" Z. B. Pyle & Co. , bid ;
Six foot sidewalk . 20 .9 sq-ft.
" Schnieder Bros. , bid ;
Six foot sidewalk . 23 7/8 sq-foot.
The bid of E.A.TMTariani ,bei ng the lowest and within the esti -
mate of city ci vi 1 engi neer, contract was so awarded.
•
12
Monday August 11th , 1924.
The Board received bids for the improvement of the alley between
South 9th & 10th Street , by construe ti ng cement roadway the full
width thereof ; from South "C" to "E" Stre et ,r:under Improvement
Resolution No. 748-1924, as follows , to -wit : -
" Daniel G. Burkhardt , bid ;
Cement roadway complete----.20 57 sq-foot , 6" sewer con. 5 1. 25-lin-ft.
E. A. sari ani , bid ;•
Cement roadway .20 � sq-ft. 6" sewer connecti one 5 2. 50 tin-ft .
" Z. B. Pyle & Co. , bid ;
Cement roadway- ---21 sq-ft . 6" sewer connections -® n2. 08 tin-ft.
" Schnieder Bros . , bid ;
Cement roadway---- . 25 7/8 sq-ft . 6" sewer connections - 2.00 lin-ft.
' The bid of Daniel G. Burkhardt , bei ng the lowest and wi thin the
estimate of the city civil engineer, the contract was so awarded.
The Board th en adjourned, -
est . of Board
Attest :
Clerk o 1 Board
•