5 Offi ce of Board of Publ is Works
City of Richmond , Indiana;
Thursday March 20 th, 19 24.
•
The Board of Publ is Works of the City of Richmond , Indiana, met •
in regular session at the office of said Board Thursday March
20th , 1924, at 9 o' clock A. M. Messrs , McFall and 'Henley present .
Absent , Mr. Land , Two members of said Board bei ng present . The
following proceedings were had , to-wit : -
The Board met to hear all persons interested in or whose property
is affected under Declaratory Resolution No. 172ti-1924, for the
condemnation & appropriation of a part of the S.Iru. Sec. 32, Twsp.
14 , Rnge . 1, West . and all that part of Lot N o. 39 , in the town
of Clifton laid out by E. & J. Railsback , lying south of Richmond
Ave . and east of Randolph Street as now laid out , for park pur - -
poses. A remonstrance was filed by H. U. Johnson, Atty. for Mil-
ton Atkinson, owner of part of SW.Quar.Sec.32, twsp .14 ,rnge .1,
west , for the reason that said real estate is not needed to be
appropriated or condemned for Park or any other purpose for said
City of Richmond , Ind., and that said Park is of no public uti lity
whatever 'for such purposes. The Board take the same under advi se-
ment and continue hearing on said resolution to Thursday April
10th , 1924.
The Boa rd approved the contract & bond of John F. Hip skind, con-
tra ctor under Improvement Resolution No. 719 -1924 , for sewer in
Northwest 6th Street , in Sedgwick Place .
The Chief of Fire Department was directed to have hose wagon' re-
paired, or to purchase new motor for same .
•
There bei ng no other petition than c oncre to , fi led for the im-
provement of North "A" Street , from Ft-Wayne Ave . to North 3rd
Street , under Improvement Resolution No..711-1924, and the Board
having heretofore designated Concrete , on motion the contract
for the improvement of said. street, was awarded to J. L. Tee-
. garden , at the prices named in his bid submitted therefore on
March 6th , 1924.
The Board having designated that South 18th Street from Reevest
ton Road to South "E" Street, under Improvement Resolution No.
715-1924, be paved wi th Bituminous Ma cad am , and no pe ti ti o n hav-
ing been filed for any other tmvement . On motion the contract for
same was awarded to the Hayes Construction Co., at prices named
in bid. submitted therefore March •6th , 1924.
The Board received bids for the improvement of Sherman Street;
also , Butler Street under Improvement Resolution No. 713-1924
as follows , to -wit :
" Connor ,Bearly & Jinks , bid :
Sherman Street comple to $9 .00 per lin-foot
Butler Street , complete 14.00 " "
The bid of Connor , Bear ly & Jinks , bei ng the only bid received
and being above the estimate of the city ci vi 1 engi neer, contract
was not awarded
Thursday March 20th, 1924. 59
The 'Board received bid for the improvement of the all ey between
South 7th & 8th Street , by constructing a cement roadway,from
South "F" to "G" Street under Improvement Resolution No.717 -
1924, as follows to-wit :
" .Schneider Bros , bid ;
Cement roadway complete - -?0.224 square foot
Sewer connections to lot line 1.25 linear foot
" Daniel G. Burkhardt , bid ;
Cement roadway complete ?0. 22zc/ square foot
6" sewer taps comp le to 2.50 linear "
E. A. Iiiariani , bid;
Cement roadway complete ?0.23 squa re foot
Sewer cone ctio ns 1. 75° linear "
" Connor, Bearly & Kinks , bid ;
Cement roadway complete ?0.240 square foot
Sewer .connectbns;--- 1. 25 linear "
The bid of Schneider Brbs . , being the lowest and within the es-
ti.mate of city civil engineer , the contract was so awarded.
The Board received bids under Improvement Resolution No. 718 -1924
for improvement of the all ey 1st north of Main Street, by cem it
roadway from North 16th to 17th Street , as follows to Flit :
" Daniel G. Burkhardt , bid ;
Cement roadway complete ---- - ----?0.22 square foot
Sewer taps 6" complete 2.50 linear "
" E. A. Ear leni, bid ; .
Cement roadway complete - ---- --- ---$0.23 square foot
Sewer connections -- - 1.75 linear "
" Schneider Bros . , bid ;
Cement roadway complete $0. 23i square foot
Sewer connections 1.25 linear "
" Connor, Bearly & Jinks , bid ; -
Cement roadway complete ?0.24 square foot
Sewer connections 1.25 linear foot
The bid of Daniel G. Burkhardt , being the lowest and within
the estimate of city civil engi neer, the contract was so awarded.
The Board rec ei ve.d bids under Impro vement re solution No.721-1924
for the improvement ofSouth 21st Street , by grading and pavi ng the
roadway with one of the fo 11 owing kinds of modern city pavements
Bituminous Macadam , Concrete , Brick or Asphalt , from Reeveston
Road to South "E" Street , as follows to -wit :-
" John F. Hipskir� , bld.;
Roadway complete using Bituminous Macadam 42.85 sq-yard •
Extra stone used - ---- 3.25 per ton
Concrete over trenches 10.00 cubic yard
(See next page )
60 Thursday M ar ch 20 th , 1924.
Bids on 721-1924, cont' d. . , )
" Hayes Construction Co. , bid;
Lt
Roadway complete usi ng Bituminous Macadam 02.92 sq-yard
Concrete over trenches 12.00 cubic yd.
Extra stone used - 4. 50 per ton
" The Andrews Asphalt Paving Co. , bid ;
Roadway complete , us Sheet Asphalt 2.86 sq-yard
Concrete over trenches 10.00 cu-yard
Extra stone used--- -• 3.50 per ton
" Connor , Bear ly & Jin1 , bid ;
Roadway complete , using C one re to 03.10 sq-yard
Concrete over trenches----- 15.00 cu-yard
Extra stone used 4.00 per ton
The Board now enters its preliminary order, designating that
said street be paved using Bituminous-Macadam .
On account of not having had a conference with the T.II. I.& E. Trac-
tion Co . , in regard to their part of improvement on Westhr.,5th Street
North "E" Street and North 20th Street, and. controversy over peti-
tions fi led, the Board conti nue action on same to Monday March 24th
1924. , and direct the Cle rk to advise the T.H. I.& E. Traction Co. ,
to have a representative of their company meet with then at said
meeting.
•
•
The Board then ad j oouuurne d,
Pre s , . oa rd pro--t em
Attest :