HomeMy Public PortalAbout02-28-1924 0f fi ce of Boa rd. of Public Works , 4
City of Riehmond. , India'CZ , .
Thursday February 28 th , 1924.
The Board of Public Works of the City of Richmond , Indian£, , met
in regular sessi on at the office of said Board , Thursday r'ebruary
28th , 1924, at 9 o' clock A. M. All the members of sa id Board ,
Messrs ,Land , IvicFai. 1 and Henley being present . The fo llowing pro --
ceeding~ were had , to --wit : -
Fire Chief E. B. Miller, reported that the Fire Department made a •
run to Fountain City on February 26th , 1924, the department was
out of the C i ty about five ho urn .
Upon the re ccmLmend ati o n of Fire Chief :o:. E. Mille r, the Board ap-
pointe d Raymond F. Daugherty a member of the Fire Department .
. A pe ti tion signed by Dille & McGuire Mfg . Co. , pra,yi ng for the im-
provement of North 13th Str eet, by constructing cement sidewalks ,
curb and _gutter on both sid. es and paving the -roadway wi th one of
the following ci ty pavements : Brick , Concrete , Asphalt or Bitumi--
. ' rrous Macadam , from the P.C.C . ; St .I. Railroad tracks to North "F"
Street , was re dei ve d & referred to Engiene er for plans etc. ,
Sup 't. D. C Hess of the M.E.B.& P.P. was gi veb permission to charge
the City 10% on actual labor for work done for City .
The Board met to receive bids for the improvement of North "G" St.
by constructing cement sid. ewalk 5' wide on both sides of stre et
from North 12th to 15th Street, except r?nere cement is already lai d
and in good condi tion, under Improvement Resolution No. 690 -1923,
as follows , to -wit : -- -
" Schnei der Bros , _bid : •
Cement walk, also cement Intersections 22 per sq-ft.
Cement cross walk 5' wide--- - --- - 23 / " IT
" Connor , Bearly & Jinks , bid : .
Cement walk , intersections , & crosswalks --- ---- 25 " per sq-ft .
" Z. B. Pyle Co. , bid :
Cement walk -- ---25 per sq-ft.
Cement intersections -. 27 S' � " "
- Cement crosswalk- 22c.!' " „
The bid of Schnei der Bros , being the lowest and wi thin the esti -
mate of City Civi 1 Engi neer , contract was so awarded.
The Board recei ved bids for the improvement of the all ey, be ftween.
South 7th St . and C. & 0. hy. tracks , by constructing a cement roadw
way from South "H" to "J" Street , under. Improvement Resolution No.
•
699-1924, as follows, to -wit . _1�_ ' - " Schneider. Bros., , bid ;
Cement roadway co mine to ------ -- .20tc' sq-foot
Manhole complete with grate c over- --- ------------ 58 .00
a , Box Grate inlet over present manhole - 10.00
Sewer connections to lot line ----- 9.00--each
" Connor , Bearly. & Jinks , bid ;
Roadway complete -•-- - .23 sq-foot
Manhole complete with grate cover -- --- 575 .00 _
Box grate inlet over present manhole • 15.00
Sewer connections to lot line - -- -- 1.00 linear-foot .
(next page for more ) -
n day �'eb rti ary 28th , 1924.
42k b i ds , 699 co nt' d.Thurs
„ Daniel G. Burkhardt, bid ;
h o ad way co mp le to --- -- - --- •- . 22 V s quo re foot. - . .
Manhole complete wi th grate cover - 85 .00
Box grate i- let over present manhole ----- -- 15.00
Sewer connections to .lot line 2.50 linear foot
„ Z. B. Fyle Co. , bid ;
itoad way complete ---- - . 24k square foot .
Sewer connections to lot line--- ----- ti 2.00 tin-foot
Manhole complete with grat e cover 70 .00
Box grate inlet over present .manhole 2.00 .
• 44 •O. J. Larkin, bid :
iioadway complete . 25 cf sq-foot
Sewer connect ions to lot line - . 5'.1. 25 li_n--ft .
. The bird of. Schneider Bros , bei ng the lowest & within the estimato
of the City Civi 1 Engi neer, the contract was so awarded.
- The Board met to reecei ve bids for construction of cemolt sidewalks
on B:otith;; ide of North D"' Street, from Noi^th--.2Oih , to 22nd Stye et
under Improvement :resolution No .700--1924 , aS fo lbws , to-etit ;
-" Schneider' Bros , bid :
Cement sid ewalk 6 ' wi de and. Cross walk 6 ' wide-- ---. 23c',' sq-foot
" Connor, Bearly & Jinks , bid ;
Cement sid ewalk, also crosswalk ----- .25c" sq-foot
" Z. B. Pyle Co . , bid;
• Cement sid ewalk 6 ' wide--- - - . 25c� s foot.
" Crosswalk' " - --- -.. 28c "
The bid of Schneider Bros, being the lowest and wi thin the esti - -
mate of ci tj civil engi neer, contract was so awarded . .
The Board met to receive bids under Improvement 1Nesolution No. 701--
1924 , to improve the 1st alley south of Main-St , by cementnroadway
from South 22nd to . 2"rd : tr eet, as fo llows , topwit : -
" Z. B. Pyle C o. , bid ; •
Cement roadway complete - 22Vic' sq-ft . . •
Sewer connections to lot line 51 .88 lin--foot
" Schneider Bros , bid :
Cement roadway complete - .23c, sq-foot
Sewer connections to lot line $9;00 each
" 0. J. Larkins , bid ;
Cement roadway complete ------ . 23c! sq-foot
- Sewer connections to lot line ; 1 . 25 lin-foot -
" Connor , Bearly & Jinks , bid ;
Cement roadway complete - . 23r-R- sq-foot
Sewer conne ct io ns to lot line . l.00 lin--foot . .
" E. A . ijari ani , bid ; .
Cement roadway complete -- ------- . 2e r-!` sq--foot
Sewer connections to lot line --_-- - - : 1.75 lin--foot
" Dan i el G. Burkhar dt , b id ;
Cement-r�oedz,ay complete . 24cc' sq-foot
Sewer connections to lot line--- -- --$2.50 lin-foot .
The bid of Z.B.Pyle Co. , bei ng the lowest and wi thin the estimate
of the ci ty ci vi 1 engi neer , the contract was So awarded.
The Board met to receive bids under Improvement rtecc lutien No.
702-1924, fo7'inprovemerut of the alley between North 16th c. 17th
Str eet, by cement- roadway from Forth TB" to "C" Street , as fo1-
lows , tc -wit :
" Z . B. Pyle ,Co. , bid. :
Cement roadway conlple to 22 .=V sq-foot
Sewer connections to lot line- 1. 9 a li n-foot
T s ���r i' y 28th , 1924 3
lhur,- a jeb ���ar ,
. bids , '702, cent ' a
" B. A. Mari ani , bid ; .
Cement roadway comple to -- .23gc sq-dfoot
• Sewer cnnne ct io ns -- ' 1.75 1in--foot
" Daniel G. Burk har. dt , bid ;
Cement roadway complete . 24s' sq-foot
Sewer c.onnectons--- -- -- -52.50 tin-foot
• " Schneider Bros . , bid ;
- cement roadway complete -- . 2451 sq�-foot
Sewer• connections ;j9 .00 each
" Con_n_er , Bearly & • Jinks. , bid ; -
Cement roadway complete -- .24 sq -foot
Sewer connections 1 .CO tin-foot
" 0. J: •ta.ri•Tins , bid- ; •
Cement roadway comp le to - -• - - . 24y sq--foot
•
• Sewer connect' ons-- 'n;1 .25 tin-foot
The bid- of Z . B. Pyle Co . , being the lowest & wi thin the estimate
of ci ty civi 1 engineer, the contract was so awarded.
The .board met to recei ve bids under Improvement itesolution No.703-1924
to improve the alley between South 7th & 8th Street, by constructing
cement. ro adw aye from South "B ' Street-, north to north terminous of al-
ley ;th-ence east- to -South 8th Street, -aS follows , to -wit : -
" 0. J. . Larkin, bid ; -
Cerment -roarJway complete ;r0. 24y' E.;quare foot
Sewer connections to lot line 1.25 lin-foot
Connor Pearly & Jinhe , bid ;
Cement roadway complete --- ;;0. 29;' sq-foot
•
Sewer co nnectic pis to lot line - -- -- 1.00 li n-root
" Schneider Bros , bid;
Ce'men t roadway complete -. 00.27 c! sq-foot
Sewer Connections to lot line 8 . 50. each
" Z. B. Pyle Co. , bid ; -
Cerpc.t roadway complete ----- 5 0. `:745; sq-foot .
sewer connections to lot - line --- 2.00 lin-foot
,; Dani.el G. Burk hay d t , bid; - -
Cement rca.c:7 ay complete --- ,; 0. 28--S' sq-foot
Sewer connections to lot line - - - - - _ 2. 50 li.n-foot
The bid of 0. J. Barkin being the lowest & Wi shin the estimate of the
• ci ty ci vi 1 engi neer , the contract was Bo awarded-. .
The Board met to receive bids under Improvement resolution No.'705 --19?4
to improve the alley between South 15 th. & 16th Stre et, by constructinc
cement r roadway from South "A" to "B" Street, as _follows , to-v:i t :
" Conrror , Dearly & Jinks , bid ;
Cement roadway, complete ---- -- --;`r0. 23-cl. sq-foot
• Sewer connections to lot line-- -- -- - 1.00 lin--foot
" E. A. Marl ant , bid ; -
Cemer t roadway complete a0. 2345� sq.-foot
Sewer connections to lot line-- - 1 . 75 lin--foot
" 0. J. La rkin, bid ;
Cement roadway complc to --- y?0.24V sq-foot
Sewer connections to lot line -- 1. 25 1i-n-foot -
" Daniel G. Burk ha clt , bid ;
Cement roadway comple to 0 .240 sq--foot
Sewer connect I cns to lot line -- 2.50 sin--foo
" Z. B . Pz„Tle Co. , bid ;
Cement roadv:ay complete ------ --- 10 .24- y sq-foot
Sewer connections to lot line •----- 1.77 tin-foot_
•
(next page
•
�� Thursda.y r`ebr tzar y 26ts , 1924.
( 705 coin d. , ) •
" Schneider Bros , bid ;
Cement roadway complete --- --- - __. _ ,0. 25V sq-foot
Sewer connections to lot line - -- - 9 .00 each
The bid of Connor , Bearly & Jinks bei rig the lowest & wi thin the esti-
-
to of ci tST ci vi l engi neer, the contract was so awarded .
The Board met to receive bids under Improvement -Re solutic n:iNo .706 -1924
to improve- the alley between Northwest 5th & 6th Street, by construu.t-
ing a cement roadway from Pearl .S greet to the Peacock 'r.oud , as fo1-
l owe s, to -` it : -
" C onnor Beany & Jinks , bid ;
Cement roadway complete ------ 0.24; sq-foot
Sewer ccn'neations to lot line -------- 1.00 lin-foot
" Z. B. Py-le Cc . bid ; •
Cement roadway complete -- . 0. 26c' s foot
Sewer connections to lot line 2. 11 lin-foot,
" Daniel G. Burkhar dt , bid ;
Cement roadway complete 00 ."6 sq-foot
5-ewer conne ctio ne to lot 1 2. 50 1 n-foot
" 0. J. Larkin, bid ;
Cement roadway complete .)0. 28S sq-foot
Sewer connect-o ns to lot line 1.25 tin-foot
" Schneider Bros , bid ; ,_-
Genent roadway complete 30. 29S� sci-soot
Sewer con-sections to lot line 9 .00 each
The bid of Connor , Bear1y & Jinksa being the lowest & wi thin the esti-
me,to of city ci vi-1 en gi neer, the contract was so awarded.
The Board recei ved bids under Improvement Resolution No. 708--1924.
to improve North 19th Street, by constructing cement sidev:alks 6'
wide on both sid es of street , from Lai n to North "A." Stre et, a.s
follows , to -wit :
" Z. B. Pyle Co. , bid;
Cement _sick ewalk 6 ' wide r0 . 224c{ scuare foot •
Cement crosswalk 6 ' wid.e -- -- 0.'28 I,
"
" L. A. Mari arii , bill; -
Cement sid ewalks , also crosswalks - ---N0. 25V square foot
" Schneider Bros . , bid;
Cement sidewalks, so crosswalks - ti 0. 25Vt square foot
The bid of Z. B. Pyle Co. , being the lowest & w thin the estimate
of the city civil engineer , the contract was so awarded.
" Connor ,B ear ly & J inks , on above '0. 25 s qe,e.re foot.
•
The Board received bids under Improvement :resolution No. 709 --1924,
to improve alley between South 12th &s 17th _Litre et , by constructing
cement road:ray from South "A" Street to the 1st a7.1 ey south of
Main Street, as follows , to -Tit .
" Daniel G. Burkhardt , bid ;
• Cement roadway complete - --- - --- ----' 0 .225 sque re foot
Sewer connections to lot line--- - ---- 2. 50 1 near foot
" 0. . J. Larkin , bid ;
Cement roadway comple to -- .,;0. 23V square foot
Sewer connectic ns to lot line 1. 25 linear foot
" Connor , -Bearly & Jinks , bid ;
Sewer connections to lot line 02..00 li near foot
Cement roadway complete ---- 0. 272y? square foot
'i'hursday February 28th , 1924. 45
709-cont ' d. )
Z. B. Pyle Co. , bid ;
• Cement roadway cornple to square foot
• Sewer connections to lot line 1 .98 lin-foot
" E. A. Mari ani , bid ;
Cement roadway complete - - $0 . 23 4/10 sq--foot •
Sewer connections to lot line - 1.75 rner lin-foot
" Schneider Bros , bid ; .
Cement roadway complete - ;IX.2.6 ; square foot
a Sewer connections to lot line 11.00 each
The bid of Daniel G. Burkhsxclt , being the lowest & within the esti
ir�.te of ci ty civi 1 engineer, the contract was so awarded .
The Board- rec ei ve d bids under Improvement Resolution No. 714 --1924,
to improve the west side of Southwest 1st Street, by constructing
cement curb , gutter and sidewalk at vacated Howard btreet , as fol-
lows, to -wit .
" E. A. Mar lard i. , bid;
- Straight curb & gutte-r - --$1.25 per linear foot
• Cement si d ewalk 6 ft. wide - - 1. 50 " I,
" Connor , Bearly F. Ji nks , bid ;
Cement curb & gutter-------- 31. 50 per linear foot
Cement sidewalk-- - 0. 50 " square foot
The bid of E. A. Mariam; being the lowest & within the estirratenof
the ci ty ci vi. 1 engineer, the contract was so awarded . .
The Board received bi ds under Improvement Resolution No. 723-.1924.
to improve the alley between North llth &: 12th Street, by construct-
ing cement roadway , from North "B" Stre et South, to South tei rina1
of alley , as follows to-wit :
- " Z. B. Pyle , bi.d ; •
Cement roadway complete 90.25y per s c7 ram•.re foot
Sewer connections to lot line ----- - ---- 2.00 " linear "
• "r 0. J. Larkin, hid ;
• Cement roadway complete 30.26c per square foot
Sewer connections to lot line 1. 25 " linear "
- " Connor , Bearly Jinks , bid ;
Cement o adw ay comp le to -- $;0. 27 per squa re foot
Sewer connections to lot line---- 1.00 " linear "
" Baaiel C. Burkhardt , bid ;
Cement roadway complete - - ;;j0.31 9' per square foot
Sewer connections to lot line 2.50 " linear "
" Schneider Bros . , bid ;
Cement roadway complete j0.3291 per square foot
Sewer connections to the lot line 10. 50 each
The bid of :',. B. Pyle Co. , bei ng the lowest &. within the estimate
of the ci ty ci vi 1 engi neer, the contract c'as so a.viarred .
In matte of letter submitted to Board by L. C.Iiess Sup't. . , of
re gar di rid• thTe Light Plant going into the merchandising
business, the Board directed the Sup' t. , to proceed to call a eeet-
ing with van c us deal ens and report back to Beard . for letter see
same marked 2age - --40
•
The soaII" then ad.jouroed ,
— 00-
- Prey f 3oard
• Attest :
Clerk_ of Board
Offi ce of Board of Public Works
• C i ty of 'H i oh m o nd. , India na ,
Monday Feb ruary 25 th , 1924.
The Board of Public Works of the City of Richmond , Indiana ,met
in regular session at the offi ce of said Board. Monday February
25th , 1924., at 9 o' clock A. .1 . Messrs , hIcFai1' and Henley being
present , Mr. Land , absent . Two members of said Board being pre s-
sent . The fo flowing proceedings were had , to--wit : -
The Board met to hear all persons interested, or whose property
is affected by the improvement of South 21st Stre et, by grading i. ;.
and paving the roadway with one of the Boll owing ki nds- of modern
pavements, to -wit : - Concre to , Brick , Bituminous Macadam or. Aspha It
from Re eve stop Road to South "E" Stre et , under Improve ment Reso- _
lutton No. .721-1924 . After hearing all persons interested .who ap-
'peared. and being fully advi sed in the premises , the Board find
th t ei property liab le to be assessed fox said improvements x
�'bene fits o ' are equal to the cost as reported by the city civil
engineer, and thereupon take final action on said. resolut ion, the
same bei ng conf_irined without modi fi cation.
The Board met to hear all persons interested, or whose property is
affected by the improve ment of the 1st -all ey north of national Rd.
by constructi ng a cement roadway from Southwest 10th to 11th Street,
under Improvement Resolution No. 722-1924, After hearing all per-
sons interested who appeared and carefully considering a remon-
stran ce filed by property owners , ( then being no residents on said.
improvement) the Board take same under advisement , and continue
hearing on said improvement resolution to Thursday March 13th, 1924. .
The Fire Chief L. E. Miller reported , Harry Aiken Csptai n of No.3,
-Hose Co. , one7sick. list, requested of the 'Board what course to take .
in the •matter, stating that heretofore. the, Fire Department had al-
ways been governed by the rules adopted several years ago, Rule
12 of the Book of rules , provides that in ordinary cases of sick •
-
ne ss or absence on le ave , "No pay will be allowed" , the Board on
motion instruct the Fire Chief to abide by the rules, if as he had
• stated the sickness, was not cau.s ed thru 'expo sure while on duty .as.
a fireman.
Claims in the amount of :; 1C , 276.7)5 were all owed & ordered paid .
The -Board the . €.d 1ourned,
nio&P! 1
Attest : , � 2re s - . f 3oa rd pro-tem. - .
C. e r L of Bog rd.