Loading...
HomeMy Public PortalAboutResolution 1533Illinois Department of Transportation BE IT RESOLVED, by the of VILLAGE ( Village) appropriated the sum of Resolution for Maintenance of Streets and Highways by Municipality Under the Illinois Highway Code PRESIDENT AND BOARD OF TRUSTEES (i!-~c President and Board of Trustees) of PL,AINFIELD ,Illinois, that there is hereby $ I,2S0,000.00 streets and highways under the applicable provisions of the Illinois Highway Code from MAY 1, 2007 to APRIL 30, 2008 (Date) (Date) BE IT FURTHER RESOLVED, that only those streets, highways, and operations as listed and described on the approved Municipal Estimate of Maintenance Costs, including supplemental or revised estimates approved in connection with this resolution, are eligible for maintenance with Motor Fuel Tax funds during the period as specified above. BE IT FURTHER RESOLVED, that the Clerk shall, as soon a practicable after the close of the period as given above, submit to the Department of Transportation, on forms furnished by said Department , a certified statement showing expenditures from and balances remaining in the account(s) for this period; and BE IT FURTHER RESOLVED, that the Clerk shall immediately transmit two certified copies of this resolution to the district office of the Department of Transportation, at SCHAUMBURG ,Illinois. I, MICHELLE GIBAS PLAINFIELD County of (~""•~-T~~•^ m Village) WILL hereby certify the foregoing to be a true, perfect and complete copy of a resolution adopted by the PRESIDENT AND BOARD OF TRUSTEES (~ President and Board of Trustees) at a meeting on ~aN ~~ ~~v ~ Date ......_ .............._._..- IN ~~TlMONI~ 1RVHEREOF, I have hereunto set my hand and seal thi - (SEAL} ... ~~ _ `__ Clerk in and for the VILLAGE s ~~. p~ day of VILLAGE ( Village) Approved MAY ~ 4 2007 Date Department of Transportation ~• ~ Tonal Engineer Printed 5/23/2007 of the (Name) of Motor Fuel Tax funds for the purpose of maintaining ~ c~D 0 Clerk BLR 14230 (Rev. 11/06) Illinois Department of Transportation Will County Division of Highways/Region One /District One 201 West Center Court/Schaumburg, Illinois 6019fi-109fi LOCAL ROADS AND STREETS Motor Fuel Tax - 2008 Maintenance Program Village of Plainfield Section Nos.: 08-00000-DO-GM 0800000-0 ] -GM May 30, 2007 Ms. Michelle Gibas Clerk Village of Plainfield 24401 West Lockport Street Plainfield, lL 60544 Dear Ms. Gibas: The Resolution adopted by the President and Board of Trustees on May 21, 2007, received on May 24, 2007, appropriating $1,250,000.00 of Motor Fuel Tax (MFT) Funds for the maintenance of various municipal streets, from May 1, 2007 to April 30, 2008, was approved as of May 24, 2007. The Estimate of Maintenance Cost in the amount of $1,006,344.00 for Municipal Streets, $111,697.84 for Municipal Streets Engineering, the Maintenance Engineering Statement, and the Contract Proposal, as corrected, were also approved as of May 24, 2007. Authorization for expenditure of $1,006,344.D0 for Municipal Maintenance and $111,697.84 for Maintenance Engineering, from your Unobligated MFT Account, is authorized and will be recorded on your next Monthly Allotment Notification Letter. A bid opening has been scheduled for June 19, 2007 at 10:00 AM for the subject section. Enclosed is one copy each for your records. If you have any questions or need additional information, please contact the MFT Field Engineer Desk at (847) 705-4409 or via email at DIMFTFIELDI@dot.il.gov. Very truly yours, Diane M. O'Keefe, P.E. Deputy Director of Highways, ~~ Region One Engineer ~ By: Christopher J. Holt, P.E. Bureau Chief of Local Roads and Streets Enclosure cc: Robert E. Hamilton Consulting Engineers w/encl. Illinois Department of Transportation Period from MAY 1, 2007 to APRIL 30, 2008 } Section Number Municipality l Municipal Estimate of Maintenance Costs 08- 00000 - 00 - GM VILLAGE OF PLAINFIELD Estimated Cost of Maintenance Operations Maintenance For Grou III or I II Material E ui m ent or Labor Operation (No. -Description) Group p,u,ui,iv> Item Unit Quantit Unit Price Cost Operation Cast Base Bid: Hot Mix As halt 1V Hot-Mix Asphalt Surface SY 38,947 $ 1..75 $ 6$,157.25 $ 68,157.25 Resurfacin Contract: Removal, 1" S ecial Section No. 08-00000-01-GM 1V Hot-Mix As halt Surface SY 8,767 $ 2.75 $ 24,109.25 $ 24,109.25 Removal, 6" S ecial IV Heater Scarification SY 90,429 $ 3.00 $ 271,287.00 $ 271,287.00 With Rc'uvenating Oil, 1 " S ecial IV Hot-Mix As halt Surface TON 7,838 $ 65.00 $ 509,470.00 $ 509,470.00 Course Mix C, N50 IV Hot-Mix As halt Binder TON 2,1.04 $ 59.00 $ 124,136.00 $ 124,136.00 Course IL 19, N50 IV Bituminous Materials GAL 2,826 $ 3.25 $ 9,184.50 $ 9,184.50 (Frime Coat Sub Total $ 1,006,344.00 _ Alternate Bid # 1 IV Preparation of Base, S ecial SY 5,867 $ 3.00 $ 17,601.00 ~. Alternate Bid # 1 will Provide or the RAP to IV Hot-Mix Asphalt Surface SY 38,947 $ 1.25 $ 48,683.75 Be used to ca other Removal, 1" S ecial Villa e ag re ate Streets Alternate Bid # 1 to be IV Hot-Mix As halt Surface SY 8,767 $ 2.50 $ 21,917.50 Determined at the Time Removal, 6" S ecial O Award as an o lion to Sub Total $ 88,202.25 To the Base Bid Total Da Labor Costs Base Bid Total Estimated Maintenance Operation Cost $ 1,006,344.00 Base Fee = $1,000.00 + $ 1,006,344.00 x 5%= $ 51,317.20 Preliminary Engineering $ 51,317.20 $1,006,344.00 x 6%=$ 60,380.64 Engineering Inspection $ 60,380.64 Advertising and Material Testing Included in the Engineering Fee Material Testing $ 0.00 Total Estimated Engineering Cost $ 111,697.84 Total Estimated Maintenance Cost $ 1,1.18,041..84 Submitted: t~ Approved: Z~p~ Da By: ~ ~l~P,SI ~vi unicipal Official Title Regional Engineer 5~fbmit Four (4) Copies to Regional Engineer Page 1 of 1 / BLR 14231 (Rev. 2/23106) Printed on 5/23/2007 3:49:15 PM Illinois Department of TransportaUot~ i Maintenance Engineering to be Performed by a Consulting Engineer (to be attached to BLR 14231 or BLR 14221) The services to be performed by the engineer, pertaining to the various items of work included in the estimated cast of maintenance operations (BLR 14231 or 14221), shall consist of the following: PRELIMINARY ENGINEERING shall include: Investigation of the condition of the streets or highways for determination (in consultation with the local highway authority) of the maintenance operations to be included in the maintenance program; preparation of the maintenance resolution, estimate and proposal; attendance at meetings of the governing body as may reasonably be required; attendance at public letting; preparation of the contract or acceptance of proposal forms; and the preparation of the maintenance expenditure statement within 3 months.. ENGINEERING INSPECTION shall include: Furnishing the engineering field inspection (including preparation of payment estimates, material testier and/ar checking material invoices) of those maintenance operations requiring professional on-site inspection, as opposed to those ordinary operations such as street sweeping, snow removal, tree trimming, crack filling, cleaning ditches and culverts, etc., which typically require no professional inspection. For furnishing preliminary engineering, the engineer will be paid a base fee PLUS a negotiated fee percentage. For furnishing engineering inspection the engineer will be paid a negotiated fee percentage. The negotiated preliminary engineering fee percentage for each group shown in the "Schedule of Fees" shall be applied to the total estimated costs of that group. The negotiated fee for engineering inspection for each group shall be applied to the total final cost of that group for the items which required engineering. (See reverse side for additional instructions). In no case shall this be construed to include supervision of contractor operations. SCHEDULE OF FEES Value of Pro ram BASE FEE ~ $15,000 $1,000.00 ,, ^ ~ $15,000 Ne otiated : $1,000 Max. PLUS Grou Preliminar En ineerin En ineerin Ins ection Operation to be p Acce table Fee % Ne otiated Fee % Acce table Fee % Ne otiated Fee % Ins ected, Etc. 0 0 0 0 0 o n ~i SIGN TUBES By: l!/C. ~ Robert E. I-Iamilcon Consulting Engineers, P.C. Local Agency pfficial._~igi~~Cdarea Consulting Engineer `1``#41ti~~uurgrryrrA~ ~41~g~e. P~.~se~~~- BY~ '~ ~ Title Page 1 of 2 Printed on 5/23/2007 3:41:23 PM Signature P.E.Se' ~~ C~ ,~"'~ Z3 'U~ = ~ ~ JOSEPH A. REGIS ~' - .~ t [late 1r ~ _~ g ~- r~f'~~TE UF~~tI~-~NQ ~~iii~l1unt~~UA~r ~/-3a o~ BLR D5520 (Rev. 7/05) Group 'TYPICAL OPERATION WITHIN GROUP Non-engineering items; mate~ials or services purchased without a proposal; i. .electrical energy and expendable small tools. II Routine day labor maintenance items, i.e. street sweeping, tree trimming or r moval, mowing, ice and snow control, cleaning ditched, brush removal, traffic signal maintenance, ligh ing maintenance and purchases by a proposal of r>~aterials not directly incorporated into the work. terns requiring minimum preliminary engineering and ~o engineering inspection. III Day labor maintenance item requiring material proposal. Items furnished an spread or delivered to jobsite by material suppliers. I Items requiring preliminary engineering and/or ngineering inspection. IV Contract maintenance items ~erformed by contractors. Items requiring preliminary engineering and/or engineering inspection. 'i Notes: (1) The negotiated fee shall not exceed th~ acceptable fee percentage for each group and hall be negotiated based on the level of complexity involved. (2) PRELIMINARY ENGINEERING: The negotiated fee for each group shall be applied to he total estimated casts of those items in that group (excluding engineering cost). (3) ENGINEERING INSPECTION: To corrppute the estimated cost, the negotiated fee fore ch group shall be applied to the total estimated cost of those items in that group to be inspected. The actual fee pai shall be based on the final costs of those items in that group given) field inspection by the Engineer. (4) Payment for maintenance engineering nay be arranged: (a) On the basis of base fees plus percentage fees not to exceed the fees listed, or "" (b) On the basis of the actual cost of s~rvices plus a specified percentage for overhead or (c) On the basis of a lump sum fee. "` If method (b) or (c) is employed, the tot~l engineering cost shall not be greater than the mount determined under method (a). '~, (5) Ten percent of the total fee is to be withheld until such time as the expenditure stateme t is submitted and the final cost of inspected items is known. (6) Each maintenance operation shown only the °Estimate of Maintenance Costs" shall show the applicable engineering Group (I to IV) for which the operation ~pplies. (7) Base fee applies only to preliminary engineering. ~~ Page 2 of 2 ', BLR 05520 (Rev. 7/05) Printed on 5/23/2007 3:41:23 PM