HomeMy Public PortalAbout05-07-1923 430 Cffi ce of Board of Public Works
City of Richmond , Indiana ,
Monday May 7th, 1923. •
The Board of Public Works of the City of- Richmond , Indiana , met
in regular session at the office of said Board , Monday May 7th,
1923, at 9 o' clock A.M. All the members of said Board Messrs ,Land ,
McFall and Henley being present . The following proceedings were
had, to-wit :
The Board met to hear all persons interested in, or whose property
is affected by the improvement of the 1st alley west of North 10th
Street , by cement roadway from North "I" Street north to let ally
under Improvement Resolution No. '687-1923. A remonstrance having
been filed signed. by John & Anna Jordan, the Board takes same -
under advisement .
•
The Board met to hear all persons' interested in or vhcs a property
is affected by the improvement of North & South 10th Street; by
resurfacing the street with one of the following materials ; Bitumi-
nous Macadam , Sheet Asphalt, Bituminous- Concrete, or Re-inforced
concrete , from North "A" to South "A" Street , under Improvement
Resolution No.688-1923. After hearing all persons interested who
- appeared and no remonst ranee having been filed. The Board decide
that the benefits to the property liable to be assessed for said
improvements are equal to the cost of same as estimated by the City
Civil Engineer and thereupon take final action. The resolution. be-
ing confirmed without modification.
The Board received bids under Improvement Aesolution No. 678-1923
for the construction of cement roadway in the alley betwee-n North
12th & 13th Street, from North "A" Street south to 1st alley north
of Main Street, as follows, to -wit : -
" Daniel G. Burkhardt, bid.: . .
Cement roadway complete $0.24 per square foot
" Sisk & Bone, bid;
Cement roadway comple to 0.27 'pe r squa re foot
" Z. B. Pyle , Co. , bid ;
Cement roadway complete 5 0.274 per sq- foot .
-The bed. of L. G. Burkhardt being' the l c v e s't and within the esti -
mate of the Engineer, the contract was so awarded.
The Board received bids under Improvement Resolution No. 680 -1923,
for the construction of cement curb & gutters on both sides of
Randolph Street, from Northwest 1st to 5th Street, as follows, viz;
" Daniel G. Burkhardt, bid;-
Cement curb & gutter(Strai-ght ) ;?1.23 per linear foot
„ „ ►, „ (Circle ) 1.47 " „ „
Intersections ' - - 0. 25 " square foot
Re-setting inlet 20.00 each
" Z. B. Pyle Co. , bid;
Straight cement curb & gutter- . $1.27 per linear foot
Circle-- " „ " " 1.49 "
Intersection 0.27 3/8 square foot
Re-setting inlets 20.00 each
(bids cont 'd. next page )
f
' I7o nday May 7th , 1925. 431 .
f680-1923 contd.
" Sisk & Bone , bid ;
Straight cement curb & gutter ;;i1.45 per lin-ft.
The bid of D.G.Burkhardt being the lowest and with . the estimate of
the Engineer, the contract was on motion so awarded.
She Board received bids under Improvement Resolution No.682-1923,
to construct a cement roadway in the alley between SW. 2nd & 3rd St.
from S.W."CR. to "D" Street , as follows to -wit : - . =
0 TT Daniel G. Burkhardt , bid : - _
Cement roadway complete $0.25 per square foot .
g " Sisk & Bone, bid ;
Cement roadway complete - $0.27 per square foot .
" Z. B. Pyle Co. , bid ;
Cement roadway, complete 4110. 284 per scare foot .
The Board received bids under Improvement Resolution No. 683-1923,
to construct cement roadway in the alley between Southn7th & 8th St.
from South "A" Street north to present cement roadway, as follows:
" Daniel G. Burkhar. dt , bid;
Cement roadway complete 0.24 per square foot .
" Sisk & Bone, bid;
Cement roadway complete $0.27 per square foot .
TT Z. B. Pyle Co. , bid ;
Cement roadway complete 5 0. 27- per square foot .
The bid of D. G. Burkhardt being the lowest and within the esti-
mate of the Engineer, ethe contract was on motion so awarded.
The Board received bids under Improvement Resolution No. 685-19239
To improve North "B" Street; by constructing a cement sidewalk 5 '
wide, cement curb & gutter on both sides of street, and paving the
roadway with one of the following kinds of city pavements, to-wit :
Concrete , Brick, Bituminous Macadam or Rock Asphalt , from North 7th
to 8th Street, as follows, to-wit :
" Hayes Construction Co. , bid : -
Cement sidewalk 5' wide y 0.25 per square foot
Cement curb & gutter 1.35 " linear foot
Circle curb & gutter 1.50 " " "
Cement all ey crosswalk 5' wide 0.25 " square foot
Re-setting inlets 5.00 Each
Roadway complete using Bituminous. macadam 1.45- per square yard
Extra macadam furnished & rolled 3.00 per ton.
" Z . B. Pyle Co. , bid :
Cement sidewalk 5° wide $0.25 per square foot
Cement alley crosswalk 5' wide 0. 27 " TT "
Cement curb & gutter (Straight ) 1.26 7/8 linear foot .
" T1 TT If (C it c le ) 1.49 It
TT
Re-setting inlets 20.00 Each
Roadway complete with Concrete 3.15 per so-yard.
" Isen.barge.r & Jessup, bid ;
Cement sidewalk 5' wide 00.30 per square foot .
Cement alley crosswalk 5' wi de 0.30 " TT TT
Cement curb & gutter Straight & Circle 1.25 " linear foot
Roadway complete with Concrete 3.80 " square yard.
Re-setting inlets complete 5.00 Each
The Board on inotio n now enters its preliminary order designating
said roadway be paved with Bituminous macadam under said resolution
plans and specifications.
432 Monday May 7th , 1923.
The Board accepted and adopted tentative list and plan for the
various: streets to be oiled out of the City ' s general fund, sub-
mitted by the City Civil Engineer.
Mr. A. M. Gardner, notified the Board that he could not serve on
committee appointed to appraise property to be condemned in open-
ing Southwest 5th Street , thru Street Car Co. property for the
reason that he is -an interested property, owner benefitted by said
opening. The Board_ appointed Mr. J. H. Lichtenfels to serve in
place of Mr. Gardner.
The Board authorized E. E. Miller Fire Chief, to have a Western
Union Clock installed in No. 2 Hose house.
Upon the recommendation of Mr. D. C. Hess, Sup' t. M.E.L.& P.P.
the -Boardvibn motion of Mr. Henley,' award contract to Chenoweth
Auto Company, for One Buick 3 passenger coupe at price named in
Wid received therefore on Apri 1 30th , 1923, @ $1, 268 .00.
The Board authorized the purchase of coal for the different
hose houses and City Bldg. ,from the M.E.L.& P.P. and directed
E. E. Miller Fire Chief to confer with D.C.He_ss Sup't. , of said
plant for said coal .
Claims to the amount of 43983 .66were allowed & ordered said.
The Board approved the payrolls to May 5th , 1923.
The Board instructed the Building Inspector not to issue Building
Permit, to the T.H. I.& E.Traction Co., for re-construction of their
barns at West 5th & Flat i onal Road , unti 1 after hearing on opening
of Sw.5th Street, May 28 , 1923.
The Board then adjourned,
Pre`st. of Boar
Attest ,
= • G-
Clerk of Board
•
•