HomeMy Public PortalAboutResolution No. 23-130 Piggyback Miami-Dade County to procure pump telemetry systemSponsored by: Interim City Manager
RESOLUTION NO. 23-130
A RESOLUTION OF THE CITY COMMISSION OF THE
CITY OF OPA-LOCKA, FLORIDA, AUTHORIZING THE
INTERIM CITY MANAGER TO PIGGYBACK THE
MIAMI-DADE COUNTY CONTRACT RT0620, TO
PROCURE A PUMP STATION TELEMETRY SYSTEM, IN
AN AMOUNT NOT TO EXCEED TWO HUNDRED TEN
THOUSAND, SIX HUNDRED FIFTY-FOUR DOLLARS
AND SIXTY CENTS ($210,654.60); PROVIDING FOR
INCORPORATION OF RECITALS; PROVIDING FOR
AN EFFECTIVE DATE.
WHEREAS, a pump station telemetry system will identify sewer operating
issues within the City of Opa-Locka ("City") before they become significant; and
WHEREAS, the Interim City Manager recommends procurement of a pump
station telemetry system; and
WHEREAS, the City has used "smart covers" on its sewer system since 2017 to
signal when a manhole indicates a system back-up. When this arises, a problem has
occurred which requires immediate action to mitigate the effect of the problem; and
WHEREAS, the City Manager recommends the installation of a pump station
telemetry system which will monitor many aspects of pump station operations and
provide an early indication of pending problems before they have an opportunity to
disrupt sewer operations; and
WHEREAS, this system has also been a longstanding recommendation of the
Miami -Dade County Division of Environmental Resources Management (DERM); and
WHEREAS, Miami -Dade County previously awarded a contract to various pre -
qualified vendors, to purchase original equipment manufacturer (OEM) process control
and instrumentation (PCI) equipment, parts and accessories; services to include OEM
repairs, inspection, testing and calibration of PCI equipment; and installation of PCI
equipment (attached as exhibit "A"), pursuant to its Request to Qualify EVN0000005,
Resolution No. 23-130
for a contract term commencing June 18, 2023 and ending on June 30, 2028; and
WHEREAS, pursuant to Section 2-318 (3) of the City's Purchasing Code allows
for purchases and acquisitions under contracts of the federal government, the State of
Florida or its political subdivisions and also municipal co-operative purchasing
organizations and programs. The City Manager has determined that the prices of the
original contract are competitive and reasonable; and
WHEREAS, the City Commission finds that it is in the best interest of the City to
piggyback the Miami -Dade County Contract RT0620, to purchase original equipment
manufacturer (OEM) process control and instrumentation (PCI) equipment, parts and
accessories; services to include OEM repairs, inspection, testing and calibration of PCI
equipment; and installation of PCI equipment, in order to benefit from already
negotiated rates and enter into an agreement to procure a pump station telemetry
system, in an amount not to exceed Two Hundred Ten Thousand Six Hundred Fifty -
Four Dollars and Sixty Cents ($210,654.60).
NOW, THEREFORE, BE IT DULY RESOLVED BY THE CITY COMMISSION
OF THE CITY OF OPA-LOCKA, FLORIDA:
Section 1. Adoption of Representations. The above recitals are true and correct and
are incorporated into this Resolution by reference.
Section 2. Authorization. The City Commission hereby authorizes the Interim City
Manager to piggyback Miami -Dade County Contract RT0620 and enter into an
agreement to procure a pump station telemetry system, in an amount not to exceed
Two Hundred Ten Thousand Six Hundred Fifty -Four Dollars and Sixty Cents
($210,654.60), in the form attached hereto as Exhibit "A".
Section 3. Scrivener's Errors. Sections of this Resolution may be renumbered or re -
lettered and corrections of typographical errors, which do not affect the intent of this
Resolution may be authorized by the Interim City Manager, following review by the
City Attorney, without need of public hearing, by filing a corrected copy of same with
the City Clerk.
Section 4. Effective Date. This Resolution shall take effect upon the adoption and is
subject to the approval of the Governor or Governor's Designee.
2
Resolution No. 23-130
PASSED and ADOPTED this 13th day of September, 2023.
ohn H. Tff for Jr., Mayor
AT t ST:
oa a Flores, City Clerk
APPROVED AS TO FORM AND
LEGAL SUFFICIENCY:
dett'Norris-Weeks, P.A.
City Attorney
Moved by: Commissioner Bass
Seconded by: Commissioner Williams
VOTE:
5-0
Commissioner Williams YES
Commissioner Kelley YES
Commissioner Bass YES
Vice Mayor Ervin YES
Mayor Taylor YES
City of Opa-locka
Agenda Cover Memo
Department
Director:
Airia Austin
Department
Director
Signature:
ci
City
Manager:
Darvin Williams
CM Signature:
2 �' ,
-"<—;
Commission
Meeting
Date:
09/13/2023
Item Type:
(EnterXin box)
Resolution
Ordinance
Other
X
Fiscal
Impact:
(EnterXin box)
i
, Yes
No
Ordinance Reading:
(EnterXin box)
1St Reading
2nd Reading
X
Public Hearing:
(EnterXin box)
Yes
No
Yes
No
X
X
Funding
Source:
Account# :
(Enter Fund & Dept.)
Ex:
See Financial
Impact Section
Advertising Requirement:
(EnterXin box)
Yes
No
X
Contract/P.O.
Required:
(EnterXin box)
Yes
No
RFP/RFQ/Bid#:
X
Strategic
Plan Related
(EnterXin box)
Yes
No
Strategic Plan Priority
Enhance Organizational
Bus. & Economic Dev
Public Safety
Quality of Education
Qual. of Life & City Image
Communication
Area:
•
Strategic Plan Obj./Strategy:
(list the specific objective/strategy this
item will address)
X
•
NI
•
•
Sponsor
Name
City Manager
Department:
City Manager
Short Title:
Pump Station Telemetry System Procurement
Staff Summary:
Issue / Recommendation: A pump station telemetry system will identify sewer operating issues
before they become significant. Staff recommends procurement of a pump station telemetry
system.
Background: The City has used "smart covers" on its sewer system since 2017 to signal when
a manhole indicates a system back-up. When this occurs, a problem has occurred which
requires immediate action to mitigate the effect of the problem. Staff would like to install a
pump station telemetry system which monitors many aspects of pump station operation and
normally will provide an early indication of pending problems before they have an opportunity
to disrupt sewer operations. This system has also been a longstanding recommendation of the
County Division of Environmental Resources Management (DERM).
Current Activity: This system is one of the recommended uses of ARPA grant funding. It is
recommended that the City take advantage of an opportunity to piggyback a Miami -Dade
County contract (No. RTQO062O) to procure this system for $210,654.60.
Financial Impact: Funding for this system is available in the Water -Sewer CIP Fund (Account
86-5356308) which currently has $280,000 of ARPA funding available.
1
Proposed Action: 1
Staff recommends the City Commission authorize the Interim City Manager to procure a pump
station telemetry system by piggybacking Miami -Dade County contract (No. RTQ00620) for
$210,654.60.
Attachment:
1. Agenda
2. Proof of purchase
3. Quote
4. Prequalified vendors
S. Contract award sheet
i
1
MIAMI -DADS
COUNTY
Parks & Recreation
275 NW 2nd Street
Miami FL 33128
United States
Supplier: 0000012518
AWC INC
6655 EXCHEQUER DR
BATON ROUGE LA 70809
United States
Tax Exempt? Y
Purchase Order
Page: 1 of 1
Dispatched
Dispatch Via Print
Purchase Order
PR -0000005854
Date
11-18-2021
Revision
Payment Terms
Net30
Freight Terms
Destination
Ship Via
Common Qarrier
Buyer
Cabrera, Belkis
Phone/ Email
belkis.
cabrera@miamidade.gov
Currency
USD
Ship To: 11395 SW 79ST.
Miami FL 33173
United States
1
Ta$ Exempt ID: MIAMIDADE
Contract- RTQ-00620 Process Control & Instrumentation Equipment
Qualified and Sole Vendor (see attached) for Mission Communications
1 of 4- Sole Source Letter
2 of 4- List of 51 lift stations with locations
3 of 4- Quote from AWC Inc.
4 of 4- Lift Station Telemetry Specifications for vendor
Line- Item/Description
Sch
1 - 1
Install Liftstation
telemetry to 51 PROS
owned sewage
liftstations in
multiple parks
throughout our park
system to comply with
DERM regulations for
annual permitting of
said liftstations.
SEE ATTACHMENTS (4)
Multiple park W/0#
252893- Dane Ackerman
Contract ID: 0000006049
Total Amount: 0,000
Total Quantity: 0.00
Mfg ID
Attention: Not Specified Bill To:
PO Ref: Multi. Park
Telemetry -W0252893
111 NW 1st Street 26th
Floor
0141370230020
Miami FL 33128-1902
United States
Replenishment Option: Standard
Quantity UOM PO Price Extended Amt Due Date
1.00 LOT $299,897.30
Contract Line: 0
Amount Open: 0.000
Quantity Open: 0.0000
$299,897.30 12/16/2021
Schedule Total $299,897.30
Release: 1
Item Total
Total PO Amount
Category Line: 1
$299,897.30
$299,897.30
Missio n 123 SCADA Featu re s: A.C. Power Monitoring, Pump Runtimes (Indi vidual & Combined), P ump Starts, Individual P ump Alarms, Tank Level, Force Main Pressure
Battery Backup High Level Alarm Status, Co ntr ol P anel Access/Intrusion notification/Alarm, Runtime vs. Rainfall, Variance, RTU health & comets status,
Ready Made reports, Dally Mo nthly, Capaoty, V ol umetric Fl ow Calculations, T ables & Graphs and Charts, Electro nic Key access and Management Reports
Hardware: Mission RTUs
WY
PRICE
Subtotal
SW550 Mission NEW CUSTOMER -REQUIRED ONE TIME FEE Webslte Setup
1
$250 .00
$250 .00
M152 NEMA 4X
$2,050.00
0 .00
M 152 Flatpak
$1,900 .00
0 .00
M 852 NEMA4X LIST:LSe1,2, 3D, 9,10,12,1E
7
52,850 .00
19,950.00
M853 FatPak LIST:LSp3,4,5,6.7,8,11C, 11D,14,15,11A,11E
12
$2,700 .00
32,400 .00
I/O Expansion Modules and Safe Mo du le Plus
M4GS Analog Input (4 Channel) Expan sion Mo dule UST: L5N12, LSg11C
19
$710 .00
13,490.00
710.00
M653 Digital Inpu t (8 Channel) Expan sion Modu le U ST:LS#11C ()Pumps -Master Lift Station)
1
$710 .00
SPOP-12 Service UST: LSII12, LS811C
20
560 .00
1,200.00
0.00
OP750 Safe Mo dule Plus fo r High Le vel Float status whe n A .C.po wer Is o ut
20
$325 .00
6,500.00
LEVEL, Mou nting Bracket, and Adapto r - -
Pulsar D101010 No n -Contact Leve l Dev ice Level monitoring (Volumetric Flow Calculations in Mission) d81.10-10
18
$1,125.00
20,250.00
Pulsar Dl 01010 No n -Co ntact Lev el Dev ice Level monitoring (Volumetric Flo w Calculations in Mission) di3Id0.30 (11C Master Stati on -longer cable required)
1
$1,270 .00,
$95.00
1,270.00
1,805.00
Pulsar d B AO 00 4 CS SS ' L"bracke t
19
Pulsar d B AO 0 0 2 a daptor 1" BSP x 20mm Adaptor, material Nylon 66 and 20mm nut
0
$40.00
0.00
Note: Level Instrument Powered by Mission RTU
PRESSURE, a nd Power Supplie s
Ke ller Su bmersible Press. Tar w/ REO TEMP 0$TF linch ,0-10opsi Gau ge- Val ueline
20
$767.00
15,340 .00
55 Flow -Through pressure transmitter Ma nifold PFM1"FNPTs 1"MN PT 1/4lnch FNPT ta ps SEE required plugs BELOW
20
$200.00
4 ,000 .00
SS 1/4in MNPTpiugs
50
$25.00
1,250.00
Power Supply 120 to 24VDC Phoenix Con ta ct PX1088491 Part n STEP 3-PS/IA C/240C/2.5/PT $65 15
22
$70 .00
1,540.00
Fond Co rpo ratio n Stop Valv e 78.600.4-NL w/Flare fitting
3
$250.00
750.00
Power Supplles,Batterles,Switches . . AC
to Dry Contact Re lays (fo r Pump Fault Inputs ov erload Phoe nix Contact PX2966197 (P029966032)
45
$30 .00
1,350 .00
PW429 SPARE RTU Power Supply -Transformer 120vac to l2vac
2
540.00
80.00
PW441 SPARE 5 amp Hr Backup Battery
2
$50 .00
100 .00
Plunger Switches for co ntrol panel a ccess
20
$75 .00
1,500.00
RF414C 20FT Antenna Cable extensio n
1
$215.00
215.00
Hardware T otal
123,950 .00
CELL SERVICE , Installation and Con figuration Labor
5P150-12
0
5347.40
0 .00
SP860.12
19
$563.40
10,704 .60
SP150.24 Cell Serv ice Two years 10% Disco unt 1
0
$ 25.2o
0 .00
5P850-36 Cell Service Two years 15% Disco unt
0
51,015 .00
0.00
I
I
Labor
Site Configu ration I/O Mapping & Startu p and Training
19
$750.00
14,250.00
Ta pping -plastic c oated ductile iron tapping saddles with dual 30455 straps paire d with brass full port co rporation stop valves. LSY3&5 no need for tap. LS912 nee ds 2 tap
17
51,500.00
25,500.00
Installation RTUs, Lev al and Pressure in stallation ELECTRICAL CONTRACTOR JIM Electric
19
51,750 .00
33,250 .00
La bo r by Ele ctrician Inclu de s Supplies (See Note Below)' ELECTRICAL CONTRA CTO R JLM Electric
83,704.60
ESTIMATED SNIPPING
20
5150.00
3,000.00
•Ele cttkeYSY.#r.tF40,1*.f l5„ tiC, rmp
mss 4 TL(. ' 'Ql�` Oita. .+v1' i'w `hr y' '1-'3c V.:...,. �.s
' V
°saw>r �
✓ r'kt
..
:✓ A6
vS sy J
wRl lbrlea5.tltbtrr&;:ada'lle n ni, . rrt ;ioner6F '+ �a dOrrar`aw' stF.. ",97. 1., �`, 4.1.0''s b ,. .�,r 7 :
�Y.
s 6 -
c ' 'u T.... . .. .t. .. .?�., z;2 a. ;.: ;iu v:'x. -4,ti, ,s* ,-*Y n .:v: .- ��t".eI 'r1°a'y ��r `".0 rsrt = e4GtandrFptitC i.04O,r`P0i95??aru,?10
1 ,550.00 ACCOUNT & SP ARES
11,100.40 16
10 ,950 .40 15
10,950 .40 14
13,687.40 12
10,950 .40 110
12,110 .40 11C
10,950 .40 118
10,950 .40 I1 A
11,100.40 10
11 ,100 .40 9
10,950 .40 8
10,950 .40 7
10,95040 6
9,950 .40 5
9,450 .40 4
11,100.40 30
9 ,700 .40 3
11400 .40 2
11,100 .40 1
210,654.60
MIAMFQADE
COUNTY
ROADMAP
BID NO. EVN0000005, PROCESS CONTROL AND INSTRUMENTATION EQUIPMENT- PREQUALIFICATION
Updated: June 30, 2023
CONTRACT ADMINISTRATOR: Sherry Y. Crockett, sherry.crockettAmiamidade.goly, 305.375.4693
I. OVERVIEW:
This Request to Qualify (RTQ) will be used to purchase original equipment manufacturer (OEM) process control and instrumentation
(PCI) equipment, parts, and accessories under Group A; services to include OEM repairs, inspection, testing and calibration of PCI
equipment under Group B; and installation of PCI equipment under Group C, for multiple Miami -Dade County departments.
SupplierNendor submittals are accepted throughout the term of the RTQ for placement in such Pool.
U. TERM
The term of the Pool is sixty (60) months from June 18, 2023 through June 30, 2028, The Pool shall remain open for the term of the
RTQ, enabling Vendors to be pre -qualified at any time during the term.
User Departments: Miami Dade Water & Sewer Department (WASD), Parks, Recreation and Open Spaces (PROS) and Regulatory
Economic Resources (RER)
III. PREQUALIFIED VENDORS:
The following vendors have been pre -qualified to provide process control and instrumentation equipment, parts, and accessories
which includes repair services, inspection, testing and calibration of equipment and installation services for the Miami Dade Water &
Sewer Department (WASD), Parks, Recreation and Open Spaces (PROS) and Regulatory Economic Resources (RER).
Vendor Name
Address
Contact
Email
Phone
Groups
Accutech
Instrumentation, Inc.
6500 Bowden Road
Suite 304
Jacksonville, Fl 32216
Enrique J. Rueda
enriaue@accutech.net
305.331.5683
A & B
AWC, Inc.
6655 Exchequer Road
Baton Rouge, LA 70809
Jim Davis
Jim.davisl.�awc-inc.can
561.777.0303
A, B &
C
CL2 Solutions, LLC
2020 Heartland Circle
Valrico, Fl 33594
Jason Erskine
jason( cI2solutions.co
813.629.2720
A, B &
C
m
Conde Process Control,
LLC
14609 SW 153"d Place
Miami, FL 33196
Laurent Conde
laurent@condeprocess.
305.219.6816
A, B
and C
com
DMT Instruments, LLC
815 N McGowan Avenue
Crystal, Fl 34429
David Morrissey
sales a�tlmtinstruments.
407.488.4598
A & B
com
Fluid Control Specialties,
LLC
111 Maritime Drive
Sanford, Fl 32771
Robert Whritenour
rwhritenour@fc-
407.579.5000
A, B
and C
spec.com
Gilson Engineering Sales
of Florida, Inc.
1038 NE 35th Avenue
Homestead, FL 33033
Luis Aristeiguieta
la(@,gilsoneng.com
305.916.0590
A & B
Hach Company
5600 Lindberg Drive
Loveland, CO 80538
Glenn Machado
amachadoanhach.com
970.214.9094
A & B
Hadronex,
Inc./dba/SmartCover
Systems
2110 Enterprise Street
Escondido, CA 92029
Maureen C. Fox
mfoxta7.smartcoversyte
855.291.1980
Ext 211
A' B
and C
ms.com
MIAMFDADE
COUNTY
ROADMAP
BID NO. EVN0000005, PROCESS CONTROL AND INSTRUMENTATION EQUIPMENT- PREQUALIFICATION
Updated: June 30, 2023
Vendor Name
Address
Contact
Email
Phone
Groups
Lewis & Associates, Inc.
PO Box 16518
Tampa, Fl 33687
Nancy Cobb
ncobb@la-fi.com
813.986.8450
A & B
Nova Water and Sewer
Supplies, LLC
5409 NW 74th Avenue
Miami, FL 33166
Vincent Bolinches
vbolinches@novawater
305.900.3909
A, B
and C
web.com
PRO -CO, Inc.
910 Belle Avenue
Suite 1000
Winter Springs, Fl 32708
Bill Grabe
bgrabe4aol.com
407.830.6969
A & B
PSI Technologies, Inc.
3520 Investment Lane
Unit 3
Rivera Beach, FL 33404
Brian Gretzinger
brian@psi-techinc.com
305.998.1371
A
Quinn Associates Group,
Inc.
309 N. Howard Avenue
Tampa, Fl 33606
Paul Quinn
paul(a.quinnassociates.
813.254.5211
A
corn
TriNova, Inc.
4485 Laughlin Drive S
Mobile, AL 36693
Mainara Costa
Mainara.costa@trinovai
863.682.4500
Ext 1086
A, B
and C
nc.com
IV.
MANUFACTURERS LIST
Refer to Roadmap Attachment
V SPOT MARKET QUOTE PROCEDURES
Prior to advertisement
Prior to advertising an ITQ or WOPR, Departments are reminded that:
• Ensure you are using the latest ITQ template: https://intrax.miamidade.goviorocuremenviibrarvrtq-solicitation-template.nuf
• Ensure you are inviting all applicable vendors to participate in the ITQ or WOPR. Unless bidding to a specific group or as otherwise
outlined in the RTQ, all vendors shall be invited to participate in the ITQ or WOPR.
• Insurance Requirements, if necessary, should be detailed in the subsequent spot market solicitation. All ITQs and WOPRs shall be
sent to Risk Management (Maxine Lodenquai, Maxine.Lodenquai anmiamidade.gov) for review of applicable insurance requirements,
prior to issuing the ITQ/WOPR. The requirements provided by Risk Management must be included in your ITQ/WOPR.
• All ITQs and WOPRs must be submitted to the Small Business Division of the Internal Services Department (Laurie Johnson,
Laurie.Johnson a(�,miamidade.gov) for Small Business Enterprise measures and wage requirements prior to issuing the ITQ/WOPR.
The measures and wage requirements provided by Small Business must be included in your ITQ/WOPR.
• All ITQs must be posted to the Cone of Silence Log located here: https://iiintrax.miamidade.gov/apps/ISD/SBDCOS/Home/Index
Prior to award recommendation
Prior to making an award, Departments are reminded that:
• Obtain a signed Non -Collusion Affidavit from the vendor to be recommended for award if the award value exceeds $250,000. The
Collusion Affidavit shall list all vendors that participated in the process.
• Check that the recommended vendor is responsible; including checking the pre -award Vendor Website at
http:/fintra.miamidade.qov/procurementivendor-compliance.asp . Departments may want to include a check of the vendor's
performance history in BTS. (Go to Vendors Home Page, click on Registered Vendors, locate the vendor, in that vendor's profile,
click on the Non.Perf.Hist. button.)
• Check that the vendor has the applicable insurance on file in the Risk Management database. If not, seek an insurance certificate for
the proper coverages and return a copy to Risk Management.
MIAMFDADE
COUNTY
ROADMAP
BID NO. EVN0000005, PROCESS CONTROL AND INSTRUMENTATION EQUIPMENT- PREQUALIFICATION
Updated: June 30, 2023
At Award Recommendation
• Pursuant to Section 2-11.1(t) of the County Code, all ITQs and WOPRs are subject to the Cone of Silence. Once an award
recommendation is made, the department issuing the ITQ shall log onto the Cone of Silence Report and remove the project here:
https://iintrax.miamidade.gov/apps/ISD/SBDCOS/Home/Index
• In your notice to participants of the quote results, copy the Clerk of the Board (clerkbcc@miamidade.gov) and include language
advising the vendor that the Cone of Silence is lifted.
(sample language - In accordance with the referenced solicitation, and Section 2-8.4 of the Code of Miami -Dade County, you are
hereby notified that the — department, recommends award of this quote to: . Our provision of this notice also serves to
confirm the lifting of the Cone of Silence from this procurement action as dictated by Section 2-11.1(t) of the County Code.)
• When the award value exceeds $25,000, allow for a three (3) business day protest period, beginning the day after the award
recommendation is posted with the Clerk and notification is sent to all participants.
It is the responsibility of the user Department Director to ensure compliance with the above -mentioned procedures. Purchases under this
pool will be subject to random review or audit by County authorities, including but not limited to, the Strategic Procurement Department,
Audit and Management, and the Office of the Inspector General,
MIAMN)ADE
COUNTY
ROADMAP
BID NO. EVN0000005, PROCESS CONTROL AND INSTRUMENTATION EQUIPMENT- PREQUALIFICATION
Updated: June 30, 2023
V. EVENT LOG
NO.
DATE
ISSUED
DESCRIPTION
Officer
3
06/30/2023
Added vendors AWC, Inc. and Gilson Engineering Sales of South Florida, Inc. to the
pool
Sherry Y. Crockett
2
06/23/2023
Conde Process Control, LLC has added an additional manufacturer Schneider
Electric. See roadmap attachment.
Sherry Y. Crockett
1
06/22/2023
Added vendors CL2 Solutions, LLC, Lewis & Associates, Inc., Pro -Co, Inc., and
Quinn Associates Group, Inc. to the pool
Sherry Y. Crockett