HomeMy Public PortalAboutResolution 1257RESOLUTION NO. 12 5 7
A RESOLUTION RELATING TO CERTAIN PUBLIC
IMPROVEMENTS REGARDING ARBOR OF PLAINFIELD
IN THE VILLAGE OF PLAINFIELD, WILL COUNTY, ILLINOIS
WHEREAS, the Village Engineer has prepared a report dated June 14, 2000 regarding
the remaining improvements for Arbor Place Units 1 and 2, a copy of which is attached hereto
and made a part hereof as Exhibit "A";
WHEREAS, said report has been compiled in accordance with the direction and
authorization from the President and Board of Trustees of the Village of Plainfield;
NOW, THEREFORE, BE IT RESOLVED, by the President and Board of Trustees of
the Village of Plainfield as follows:
I. That said Exhibit "A" which is a report from Robert E. Hamilton Consulting
Engineers, P.C., the Village Engineer, is hereby approved in accordance with the Village
Subdivision Regulations.
II. That the Village staff, the Village Engineer and the Village Attorney are hereby
authorized to take all necessary action to draw on all outstanding letters of credit regarding the
account of Arbor of Plainfield in order that said remaining improvements be constructed.
Passed this 17 day of July ., 2000.
AYES:Smolich, Calabrese, Cherry, Collins, O'Connell.
NAYS: ~
ABSENT: Rathbun
Approved this 17 day of ,_ Ju lv , 2000.
ILL E RES DENT
ATTEST:
-,
VILLAGE CLE
Robert E. Hamilton
Consulting Engineers, P.C.
455 Ruby St.
Joliet, Illinois
60435
Robert E. Hamilton, P.E.
John A. Djerf, P.E.
Robert B. Hamilton, P.E. (1948-1991)
Howard J. Hamilton, P.E.
Joseph A. Regis, P.E.
Joseph M. Nordman, P.E.
June 14, 2000
Village President & Board of Trustees
Tillage of Plainfield
830 W. Lockport Street, Suite 206
Plainfield, IL 60544
Re: Arbor Place Units 1 and 2
Our Project No. 98360
Dear President & Board Members:
Area Code 815
Phone: 7223444
Fax: 722-8733
The remaining improvements for Arbor Place Units 1 and 2 are as follows:
Unit 1
Phase I -
Relocate Sanitary Sewer
As-Builts
Subtotal
Phase II-
Sidewalk
Parkway Restoration
Trees
Subtotal
1 LS Q $ 15,000.00/LS =
1 LS @ $ 5,000.00/LS =
$ 15,039.00
5.000.00
Total Unit 1
Unit 2
Phase I -
As-Builts
3,972 SF @ $
1,324 SY O $
10 EA @ $
4.00/SF =
2.50/SY =
350.00/EA =
1 LS @ $ 5,000.00/LS = $ 5,000.00
$ 20,039.00
$ 15,888.00
3,310.00
3,500.00
$ 22,698.00
$ 42737-_.00
Village of Plainfield
Project No. 98360
June 14, 2000
Page 2
Phase II-
Sidewalk
Parkway Restc:i°ation
Trees
Bituminous Surface Removal
Aggregate Base Course, 10"
Bituminous Binder Course, 2"
Bituminous Surface Course, 1"
Roll Curb and Gutter - M4.12
Restoration
Subtotal
3,928 SF @ $ 4.00/SF = $ 15,712.00
1,309 SY @ $ 2.50/5" = 3,272.50
7 EA @ $ 350.00/EA = 2,450.00
285 SY @ $ 22.00/SY = 6,270.00
140 SY @ $ 9.50/SY = 1.,330.00
140 SY @ $ 5.00/SY = 700.00
435 SY @ $ 3.00/SY - 1,520.00
76 LF @ $ 20.00/LF = 1,275.00
1,112 SY @ $ 2.50/SY = 2,780.00
Total Unit 2
$35,309.50
$ 40,309.50
Adequate funds are present in the existing Letters of Credit, as summarized below, to complete this
work.
Unit 1:
Phase I - $74,760.20
Phase II - 57,400.00
Total Unit 1: $132,160.20
Unit 2:
Phase I - $33,344.55
Phase II - 65,757.80
Total Unit 2: $ 99,102.35
If you should have any questions, please call.
Very truly yours,
Robert E. Hamilton
Consultin En in~ers,,,P:C. -
...
..
~^
_- .f
Howard J. Hamilton, P.E.
WPD:HJH/rt
\PLFD\98360.614