Loading...
HomeMy Public PortalAboutResolution 1235ARESOLUTION NO. '1235 A RESOLUTION AUTHORIZING A CHANGE ORDER IN THE CONTRACT BETWEEN THE VILLAGE OF PLAINFIELD AND "D" CONSTRUCTION. WHEREAS, the Village of Plainfield and "D" Construction previously entered into a contract for the construction of improvements on Des Plaines Street; and WHEREAS, it has been determined that it is in the best interest of the Village to add and deduct certain work to the original contract; and WHEREAS, the circumstances necessitating said changes were not reasonably foreseeable at the time the contract was executed and said change orders are in the best interest of the Village of Plainfield, as authorized by law. NOW THEREFORE BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF PLAINFIELD, WILL COUNTY, ILLINOIS AS FOLLOWS: That it is hereby determined that it is in the best interest of the Village of Plainfield to authorize Change Orders No. 1 through 7, dated October 18, 1999, and that the circumstances necessitating said change were not reasonably foreseeable at the time the contract was executed and that said change orders are in the best interest of the Village of Plainfield, as authorized by law. II. The President is hereby authorized to execute said proposed change orders, a copy of which is attached hereto and made a part hereof as Exhibit "A", and that a copy of said Resolution and Exhibit shall be preserved in a file regarding said contract which shall be open to the public for inspection pursuant to 720 Illinois Compiled Statutes 5/33E-9. Passed this 18th day of October 1999. AYES: Smolich, Collins, Calabrese, Cherry. NAYS: 0 ABSENT: 0' Connell and Rathbun. Approved this 18th day of October 1999. ,, ILLAGE PR ENT ATTEST: m VILLAGE CLERK Robert E. Hamilton Consulting Engineers, P.C. 455 Ruby Street, Joliet, Illinois 60435 to Municipality PLAINFIBLD Township County WTLL Section Request No. OCTOBER #~a Contractor "D" CONSTRUCTION, INC. addition I recommend that an e~eRS+er~ be made dustier; (between Station Request for Approval of Change in Plans 19 99 the above contract. and Station (Do not fill in unless a change in length is involved.) a net length of lineal feet.) The estimated quantities are shown below and the contractor agrees to furnish the materials and do the work at the contract unit prices. Show station location for major items. Items Additions Deductions Contract Items #1-43: S) Combination Concrete Curb and Gutter Removal 25 LF Q $3.50/LF $ 87.50 6) Sidewalk Removal -Special 362 SF ®$1.00/SF 362.00 15) Frames and Grates to be Adjusted 2 EA Q $300.00/EA 600.00 16) Trench Backfill -Special 70 CY ®$20.00/CY $ 1,400.00 19) Undercut and Backfill -Special SO CY ®$28.00/CY 1,400.00 22) Bituminous Material (Prime Coat) S00 GALS Q $2.85/GAL 925.00 23) Bituminous Concrete Binder Course, Mix B, Class 1, Type 2 97 TONS Q $41.80/TON 4,OS4.60 24) Combination Concrete Curb and Gutter - B.6-12 -Special 46 LF Q $15.00/LF 690.00 2S) Portland Cement Concrete Driveway Pavement -Special 83 SF Q $36.00/SF 2,988.00 26) PCC Sidewalk -Special 214 SF Q $3.25/SF 695.50 27) PCC Sidewalk w/Stained and Stamped Surface -Special 150 SF Q $8.OOJSF 1,200.00 29) Class D Patches, Type IV, 3" 132 SY Q $25.00/SY 3,300.00 30) Incidental Bituminous Surfacing -Special 10 TONS Q $55.00/TON 550.00 addition o hi h i / f C i t Totals: $ 14,682.10 $ 3,570.50 to date $11,111.60 w c s 5.30 o o Total net ontrac pr ce. dedt~Etiee Net Change $ 11,111.b0 \PLFD\'99RAC#1.REH Robert E. Hamilton Consulting Engineers, P.C. 455 Ruby Street, Joliet, Illinois 60435 Municipality PLAINFIELD Township County WILL Section Request No. 2 OCTOBER , 19 99 Contractor "D" CONSTRUCTION COMPANY addi#+er~ I recommend that a~+eF- be made deduction (between Station from Request for Approval of Change in Plans the above contract. and Station (Do not fill in unless a change in length is involved.) a net length of lineal feet.) The estimated quantities are shown below and the contractor agrees to furnish the materials and da the work at the contract unit prices. Show station location for major items. Items Additions Deductions Contract Items #44-50: $ 5,083.12 44) Bituminous Concrete Surface Course, Mix C, Class 1, Type 2 125.20 TONS Q $40.60/TON 50) Thermoplastic Pavement Marking - 24" Line 35 LF Q $ 3.30/LF 115.50 } Totals: $ 5,198.62 T t l t t d t $ 5 198 62 hi h i 34 46 % f C t t i ~ u c o a ne o a e , . w c s . o on rac pr ce. ded ton Net Change $ 5,198.62 State fully the nature and reason for the change: BALANCING AS-BUILT QUANTITIES WITH PROPOSED QUANTITIES. Approved /~ _/~' , 1999 Vil ag of Plainfield IL 494-0383 \PLFD\'99RAC#2.REH BLR 6301 (Rev. 6/90) Robert E. Hamilton Consulting Engineers, P.C. 455 Ruby Street, Joliet, Illinois fi0435 Municipality PLAINFIELD Township County WILL Section Request No. 3 OCTOBER , 19 99 Contractor "D" CONSTRUCTION, INC. _ __ __,_ add+tie~ I recommend that are-e~tetas+ea be made deduction (between Station to from Request for Approval of Change in Plans the above contract. and Station a net length of (Do not fill in unless a change in length is involved.) lineal feet.) The estimated quantities are shown below and the contractor agrees to furnish the materials and do the work at the contract unit prices. Show station location for major items. Items Additions beductions Contract Items #51-53: 52) Alley -Bituminous Materials (Prime Coat) 15 GALS Q $3.00/GAL $ 45.00 Totals: $ 45.00 1 4 % i h i f C d hi ~ ,6 ontract pr ate $ 45.00 w c s o ce. Total net ded uct on to Net Change $ 45.00 State fully the nature and reason for the change: BALANCING AS-BUILT QUANTITIES WITH PROPOSED QUAN'T'ITIES. Approved _~D~,~/~ , 19 99 illage of Plainfiel IL 494-0383 \PLFD\'99RAC#3.REH BLR 6301 (Rev. 6/90) Robert E. Hamilton Consulting Engineers, P.C. 455 Ruby Street, Joliet, Illinois 60435 Request for Approval of Change in Plans Municipality PLAINFIELD Township County WILL Section Request No. 4 OCTOBER 19 99 Contractor "D" CONSTRUCTION, INC. addition I recommend that an e~ea~sie~ be made dedestier~ (between Station to #~ee3 the above contract. _ and Station a net length of (Do not fill in unless a change in length is involved.) lineal feet.) The estimated quantities are shown below and the contractor agrees to furnish the materials and do the work at the contract unit prices. Show station location for major items. Items Additions Deductions Additional Work -Commonwealth Edison Conduits: 54) 4" PVC Schedule 40 Conduit 375 LF @ $13.50/LF $ 5,062.50 55) 5" PVC Schedule 40 Conduit 430 LF @ $15.50/LF 6,665.00 56) 90 Degree Elbows 5 EA @ $150.00/EA 750.00 S7) Select Granular Bacl~ill 200 CY @ $20.OOJCY 4,000.00 addition o d t $ 16 477 50 hi h i N A / f C t t i Totals: $ 16,477.50 a e , . w c s / o o on rac pr ce. Total net dedestae~f to Net Change $ 16,477.50 State fully the nature and reason for the change: BALANCING AS-BUU„T Approved ~6 `~~' ~ , 19 99 WITH PROPOSED QUANTITIES. Village of Plainfield IL 494-0383 \PLF!)\'99RAC#4.REH BLR 6301 (Rev. 6/90) Robert E. Hamilton Consulting Engineers, P.C. 455 Ruby Street, Joliet, Illinois 60435 Request for Approval of Change in Plans Municipality PLAINFIELD Township County WILL Section Request No. 5 OCTOBER , 19 99 addition to I recommend that an e~eesief=- be made dBdestier} f~R Contractor "D" CONSTRUCTION, INC. the above contract. (between Station and Station a net length of (Do not fill in unless a change in length is invpNed.) lineal feet.) The estimated quantities are shown below and the contractor agrees to furnish the materials and do the work at the contract unit prices. Shaw station location for major items. Items Additions Deductions Additional Work _ Relocate Curb Inlet: 5$) Relocate Existing 2' Diameter Inlet 1 LS a $805.00/LS $ 805.00 addition o t d t $ 805 00 hi h i N A / f C t t i T l Totals: $ 805.00 o a e . w c s / o o on rac pr ce. ota net dedestie~- Net Change $ 805.00 State fully the nature and reason for the change: Approved /~ _ / S , 19 99 IL 494-0383 \PLFD\'99RAC#5.REH BLR 5301 (Rav. 6/90) Robert E. Hamilton Consulting Engineers, P.C. 455 Ruby Street, Joliet, Illinois 60435 Municipality PLAINFIELD Township County WILL Section Request No. 6 OCTOBER 19 99 Contractor "D" CONSTRUCTION, INC. addition to I recommend that an ~ be made the above contract. de~stie-~ fxe~a (between Station and Station a net length of (Do not fill in unless a change in length is involved.) lineal feet.) The estimated quantities are shown below and the contractor agrees to furnish the materials and do the work at the contract unit prices. Show station location for major items. items Additions Deductions Additional Work -Alley Parking Areas - Grading and Paying: 59) Preparation of Base 800 SY @ $7.50/SY $ 6,000.00 60) Bituminous Materials (Prime Caat) 240 GALS Q $2.00/GAL 480.00 61) Bituminous Concrete Surface Course, Mix C, Class 1, Type 2 226.29 TONS @ $50.00/TON 11,314.50 62) Mobilization and Grading of Church Lot 1 LS @ $5,000.00/LS 5,000.00 addition o t d t $22 794 50 hi h i N A / f C t t i Totals: $ 22,794.50 o a e , . w c s / o o on rac pr ce. Total net ~ e Net Change $ 22,794.50 State fully the nature and reason for the change: BALANCING AS-BUILT QUANTITIES WITH PROPOSED Approved 6 -~~~ , 19 99 Village of Plainfield Request for Approval of Change in Plans IL 494-D383 \PLFD\'99RAC#6.REH 8LR 6301 (Rev. 6/9D) Robert E. Hamilton Request for Approval Consulting Engineers, P.C» of Change in Plans 455 Ruby Street, Joliet, Illinois 60435 Municipality PLAINFIELD Township County WILL Section Request No. 7 OCTOBER , 19 99 Contractor "D" CONSTRUCTION INC. addition to I recommend that an ~ be made the above contract. dedblstie~- #rer~ (between Station and Station (Do not fill in unless a change in length is invpNed.) a net length of lineal feet.) The estimated quantities are shown below and the contractor agrees to furnish the materials and do the work at the contract unit prices. Show station location for major items. Items Additions Deductions Additional Work -Alley Parking Areas - Gradin;; and Paving: b3) Bituminous Surface Removal (Cold Mill) 150 SY Q $2.00/SY 64) Bituminous Materials (Prime Coat) 25 GALS C~ $3.00/GAL 65) Bituminous Concrete Surface Course, Mix C, Class 1, Type 2 71.04 TONS ®$50.00/TON $ 300.00 75.00 3,552.00 addition Total net to date $ 3 927 00 which is N/A % of Contract rice Totals: $ 3,927.00 , . p . ~e Net Change $ 3,927.00 State fully the nature and reason for the change: BALANCING AS-BUILT QUANTITIES WITH PROPOSED QUANTITIES. Approved ~d J~~ , 19 99 ~ Village of lainfield IL 494-0383 \PLFD\'99RAC#7.REH BLR 6301 (Rev. 6/90)