Loading...
HomeMy Public PortalAbout100_092_Memo Style5 Jan LeViner From: Sororian, Fred <sororian.f @thomasandhutton.com> Sent: Wednesday, March 04, 2015 8:57 AM To: George Reese Cc: Stovall, Chris; Stanley Bearden; Diane Schleicher Subject: RE:Tybee Island Digester George, We will be ready to explain the reasons why the project is over the budget. As you mentioned,the specified equipment will last longer with less maintenance plus the Tybee factor. Fred Sororian Thomas&Hutton sororian.f @thomasandhutton.com (P)912-721-4128 (F)912-234-2950 Website I vCard From: George Reese [mailto:GReese @cityoftybee.org] Sent: Wednesday, March 04, 2015 8:43 AM To:Sororian, Fred; Diane Schleicher Cc:Stovall, Chris; Stanley Bearden Subject: RE:Tybee Island Digester Fred the infrastructure committee meeting is March 12, 2015 at 5:30 pm I want you and Chris Stovall to be there to explain to the committee why the sludge digester project has ran over Budget by$ 300,000.00 dollars:you need to bring cost analysis of the savings for the sludge digester for having it installed verses not having it installed. Plus the cost of the Blowers, Stainless Steel piping, and Tank Costs, and most importantly the longevity of the Sludge Digester and its components. It will not be left up to me to explain this on my own, I was not the one that set the budget.Thank You George Reese From: Sororian, Fred [mailto:sororian.f @thomasandhutton.com] Sent: Tuesday, March 03, 2015 6:31 PM To: Diane Schleicher Cc: George Reese; Stovall, Chris Subject: Tybee Island Digester Hello Diane, It was good seeing you again this afternoon.As I promised, please find a couple of brochures, one for the tank and the other one for the blowers that we specified for this project.These blowers are the top of the line as far as efficiency and noise level, especially for this location surrounded by residential area. In addition, we added canopy for the blowers to reduce wear and tear on the equipment as well as increasing plant personnel safety. All the air piping also specified to stainless steel to prevent corrosions. Our latest engineering cost estimate was about$980,000.These are the few items that exceeded our last year budget of$750,000. I hope this will help explain the reason why the bids came in higher than our original cost estimate. By specifying a high quality equipment, we believe this installation would last a life time with reasonable care. Please let me know if you need any other information.Thanks, Fred Sororian Project Manager III Thomas&Hutton 1 sororian.f @thomasandhutton.com (P)912-721-4128 (F)912-234-2950 Website I vCard "Relationships and Solutions for Success" PRIVILEGED AND CONFIDENTIAL: This electronic message and any attachments are confidential property of Thomas& Hutton The information is intended only for the use of the person to whom it is addressed.Any other interception, copying, accessing, or disclosure of this message is prohibited. If you have received this message in error,please immediately notify Thomas&Hutton and purge the message received. Do not forward this message without permission. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed.If you are not the named addressee you should not disseminate,distribute or copy this e-mail.Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system.Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of The City of Tybee Island.The recipient should check this email and any attachments for the presence of viruses.The City of Tybee Island accepts no liability for any damage caused by any virus transmitted by this email.City of Tybee Island P.O.Box 2749 Tybee Island,GA 31328 2