HomeMy Public PortalAbout07 July 19, 2004 Technical AdvisoryTIME:
DATE:
LOCATION:
TECHNICAL ADVISORY COMMITT
MEETING AGENDA*
10:00 A.M.
July 19, 2004
RECORDS
70/
Riverside County Transportation Commission
Riverside County Regional Complex
4080 Lemon Street, Riverside, CA
Conference Room A, 3`d Floor
*By request, agenda and minutes may be available in alternative format; i.e. large print, tape.
COMMITTEE MEMBERS
John Andoh, PVVTA
Dave Barakian, City of Palm Springs
Bill Bayne, City of Cathedral City
Tom Boyd, City of Riverside
Bill Brunet, City of Blythe
Mike Gow, City of Hemet
Mark Greenwood, City of Palm Desert
Keith Haan, City of Calimesa
Bruce Harry, City of Rancho Mirage
Bill Hughes, City of Temecula
George Johnson, County of Riverside
Tim Jonasson, City of LaQuinta
Jim Kinley, City of Murrieta
Eldon Lee, City of Coachella
Cis Leroy, SunLine Transit
Wendy Li, Caltrans District 08
Amir Modarressi, City of Indio
Habib Motlagh, Cities of Perris, San
Jacinto, Canyon Lake
Craig Neustaedter, City of Moreno Valley
Kahono Oei, City of Banning
Anne Palatino, RTA
Dan Patneaude, City of Desert Hot Springs
Juan Perez, County of Riverside
Amad Qattan, City of Corona
Joe Schenk, City of Norco
Ken Seumalo, City of Lake Elsinore
Ruthanne Taylor Berger, WRCOG
Allyn Waggle, CVAG
Tim Wassil, City of Indian Wells
John Wilder, City of Beaumont
Cathy Bechtel, Director Transportation Planning & Policy Development
I1 3, a-
RIVERSIDE COUNTY TRANSPORTA TION COMMISSION
TECHNICAL ADVISORY COMMITTEE MEETING AGENDA*
*Actions may be taken on any item listed on the agenda.
TIME: 10:00 A.M.
DATE: July 19, 2004
LOCATION: Riverside County Transportation Commission
Riverside County Regional Complex
4080 Lemon Street, Riverside, CA
Conference Room A, 3rd Floor
In compliance with the Americans with Disabilities Act and Government Code Section 54954.2, if you
need special assistance to participate in a Commission meeting, please contact the clerk of the
Commission at (909) 787-7141. Notification of at least 48 hours prior to meeting time will assist staff in
assuring that reasonable arrangements can be made to provide accessibility at the meeting.
1. CALL TO ORDER
2. SELF -INTRODUCTION
3. APPROVAL OF MINUTES — June 21, 2004
4. PUBLIC COMMENTS (This is for comments on items not listed on the agenda.
Comments relating to an item on the agenda will be taken when the item is
before the Committee.)
5. STATUS OF TUMF CALL FOR PROJECTS
6. STATUS OF SB 821 CALL FOR PROJECTS (Attachment)
7. CALTRANS LOCAL ASSISTANCE
8. STIP UPDATE — IMPACT OF STATE BUDGET
Technical Advisory Committee Meeting
July 19, 2004
Page 2
9. PROJECT MILESTONES — JULY UPDATE (Attachment)
10. FTIP UPDATE
11. CETAP UPDATE
12. JULY 14, 2004 COMMISSION HIGHLIGHTS
13. OTHER BUSINESS/ANNOUNCEMENTS
Reminder that the STP Rehab TAC Subcommittee will convene immediately
following the July 19 TAC meeting at RCTC.
14. ADJOURNMENT (The next meeting will be August 16, 2004 in Riverside.)
TECHNICAL ADVISORY COMMITTEE MEETING
MINUTES
Monday, June 21, 2004
1. Call to Order
The meeting of the Riverside County Transportation Commission (RCTC)
Technical Advisory Committee (TAC) was called to order at 10:00 a.m., at
Banning City Hall Civic Center, 99 East Ramsey Street, Banning, CA.
2. Self -Introductions
Members Present:
Others Present:
Dave Barakian, City of Palm Springs
Tom Boyd, City of Riverside
Bill Brunet, City of Blythe
Julie Dauer, City of Temecula
Ryan Gayler, City of Palm Desert
Mike Gow, City of Hemet
Keith Haan, City of Calimesa
Bruce Harry, City of Rancho Mirage
Bill Hughes, City of Temecula
Ned Ibrahim, City of Corona
Tim J:onasson, City of LaQuinta
Jim Kinley, City of Murrieta
Eldon Lee, City of Coachella
Amir Modarressi, City of Indio
Russ Napier, City of Murrieta
Craig Neustaedter, City of Moreno Valley
Kahono Oei, City of Banning
Juan Perez, County of Riverside
Amad Qattan, City of Corona
Tim Wassil, City of Indian Wells
Shirley Gooding, RCTC
Ken Lobeck, RCTC •—"
Shirley Medina, RCTC
Hazem Mobarek, W. Koo & Associates
3. Approval of Minutes
No objections.
Technical Advisory Committee Meeting
June 21, 2004
Page 2
4. Public Comments
There were no public comments.
5. OVERVIEW OF STATE AND FEDERAL FUND PROGRAMS
Shirley Medina, RCTC, presented an overview of the federal and state
transportation funding program and answered related questions.
6. PROJECT DELIVERY AND OBLIGATION ISSUES
Shirley Medina announced the new Caltrans Local Assistance Chief, Wendy
Li, who will start her new position in July. There was discussion of various
problems the agencies have encountered and Ms. Medina suggested that
the TAC members send her an e-mail stating some of the difficulties they
have and she will pass the information to Ms. Li. It was suggested that
Ms. Li attend the September, 2004 TAC meeting.
7. 2004 REGIONAL TRANSPORTATION IMPROVEMENT PROGRAM (RTIP)
STATUS UPDATE
Ken Lobeck, RCTC, stated that approval of the 2004 RTIP by the federal
agencies is scheduled for October, 2004, as long as no issues arise with
conformity.
8. SB 821 EVALUATION COMMITTEE MEETING
Tim Wassil, City of Indian Wells, reminded the TAC that the SB 821
Evaluation Committee Meeting is scheduled for June 30. Shirley Medina
provided Jerry Rivera's corrected schedule of presenters and pointed out
that there is one change in the schedule (City of Coachella replaced City of
Murrieta on the timetable).
9. JUNE 9, 2004 COMMISSION HIGHLIGHTS
The Commission Connection was provided to the TAC.
10. OTHER BUSINESS/ANNOUNCEMENTS
Mr. Wassil reminded the TAC that the STP Rehab TAC Subcommittee will
convene immediately following the July 19 TAC meeting at RCTC offices.
He also stated that he will be on vacation during the next TAC meeting,
July 19, 2004, and that Tom Boyd, City of Riverside, will chair that
meeting.
Technical Advisory Committee Meeting
June 21, 2004
Page 3
Ms. Medina announced that the 2004 STIP adoption is scheduled for the
August CTC meeting and it is anticipated that the CTC will commence
allocating projects in August.
She further announced that Marilyn Williams, RCTC, sent information to
the cities regarding the request for project submittals for TUMF funds and
that interested parties should contact Ms. Williams. -
Ms. Medina stated that regarding the July Commission meeting, there will
be an information item regarding CVA'G's approval of 1) $10M of TUMF
funds on the Ramon Road Interchange for right of way mitigation; and 2)
TUMF funds will also be placed on the 1-10 and Palm Drive/Gene Autry
Interchange to replace TCR funds.
She said that the following counties have been approved for the November
ballot for sales tax measures/extensions: San Diego, San Bernardino,
Ventura, Monterey, Santa Cruz, San Mateo, Contra Costa, Marin, Napa,
Solano and Sacramento.
11. ADJOURNMENT
There being no further business for consideration by the Technical Advisory
Committee, the meeting was adjourned at 11:30 A.M. The next meeting is
scheduled for July 19, 2004, 10:00 A.M., Riverside County Transportation
Commission office.
Respectfully submitted,
v,s4t
Shirley M ina
Program Manager
AGENDA ITEM 5
A presentation will be made but
there is no attachment to the
agenda for item 5.
AGENDA ITEM 6
RIVERSIDE COUNTY TRANSPORTA TION COMMISSION
DATE:
July 14, 2004
TO:
Riverside County Transportation Commission
FROM:
Budget and Implementation "Committee As A Whole"
Theresia Trevino, Chief Financial Officer
Jerry Rivera, Program Manager
THROUGH:
Eric Haley, Executive Director
SUBJECT:
FY 2004-05 SB 821 Bicycle and Pedestrian Facilities Program
Funding Recommendation
BUDGET AND IMPLEMENTATION "COMMITTEE AS A WHOLE" AND STAFF
RECOMMENDATION:
This item is for the Commission to approve the FY 2004-05 SB 821 Bicycle and
Pedestrian Facilities Program recommended funding as shown on the attached
schedule.
BACKGROUND INFORMATION:
In April, Commission staff notified the cities, the county and local school districts
that an estimated $1,026,768 would be available for programming in FY 2004-05
through the SB 821 Bicycle and Pedestrian Facilities Program. This program is
funded by an allocation of 2% of the total Local Transportation Funds (LTF)
apportioned to Riverside County by the State and funds carried -over from prior
years. Carryover funds available this year totaled $192,656 from higher estimated
revenues and from previously approved projects which either did not expend their
full allocation due to lower than estimated actual costs or were subsequently
abandoned by the applicants for various reasons. Total available funds for FY
2004-05 are $1,219,424.
The SB 821 proposals were due May 28, 2004. The Commission received 46
proposals (2 bicycle projects, 38 sidewalk projects, 6 ADA related retrofit projects)
from 18 agencies requesting a total of $3,305,928 (Attachment I). An evaluation
committee comprised of three members from the Commission's Citizens Advisory
Committee and three members from the Technical Advisory Committee reviewed
the proposals on June 30, 2004. All of the applicants were invited to the meeting
and requested to present their proposals to the committee and answer questions
from the members. The proposals were evaluated and ranked based upon the
Commission adopted scoring criteria (Attachment II). The committee's
recommended funding is shown on Attachment III.
Attachments:
1) SB 821 Program Submittals FY 2004-05
2) SB 821 Evaluation Criteria
3) SB 821 FY 2004-05 Recommended Funding (not available at this time)
-Attachment
RCTC SB 821 PROGRAM SUBMITTALS
FY 2004-05
Agency ! Project
Banning (8)
Nicolet Middle School - George St. & Alessandro
Williams St. Sidewalk
George St. Sidewalk
20th St. Sidewalk
Lions Park Sidewalk
Hermos Ave. Sidewalk
Nicolet St. Sidewalk
Hoffer St. Sidewalk
Total
Total SB 821 Funds Local
Cost Requested Match
$67,000 $33,500 i $33,500
$73,000 $36,500 $36,500
$29,000 $14,500 $14,500
$36,000 $18,000 $18,000
$60,000 $30,000 $30,000
' $22,000 $11,000 $11,000
$110,000 $55,000 $55,000
$90,000 $45,000 $45,000
$487,000 $243,500 $243,500
Blythe (4)
S. Solano St. Sidewalk $29,000 $23,200 $5,800
Solano St. Sidewalk $29,150 $23,320 $5,830
Chanslorway Sidewalk $22,600 $20,340 $2,260
N. Carlton Ave. Sidewalk $26.750 $24,075 $2,675
Total $107,500 $90,935 $16,565
Calimesa
School Bus Stop Project
Coachella
De Oro Park Improvement Project
Corona
Accessibility to North Main Corona
Metrolink Commuter Train Station
Desert Hot Springs (2)
Mesquite Ave. Sidewalk
West Drive Sidewalk
Total
Hemet
Charlton & Lincoln Sidewalk & Access Ramp Proj.
$160,409 $144,368 $16,041
$52,500 $42,000 $10,500
$182,000 $154,700 $27,300
$51,500 $35,000 $16,500
$47,000 $30,000 $17,000
$98,500 $65,000 $33,500
$112,681 $56,341 $56,340
Attachment 1
RCTC SB 821 PROGRAM SUBMITTALS
FY 2004-05
Total SB 821 Funds Local
Agency / Project Cost Requested Match
Indio (3)
Indio Blvd. Sidewalk Improve. - Various Sections $198,000 $180,000 $18,000
Indio Blvd. Sidewalk Improve. - Park St/Civic Ctr. $48,400 $44,000 $4,400
Jefferson St./Dune Palms Road Sidewalk $27,500 $25,000 $2,500
Total $273,900 $249,000 $24,900
Lake Elsinore
Lake Elsinore Outlet Channel Pedestrian & $694,718 $494,718 $200,000
Bicycle Corridor Project
La Quinta (2)
Avenue 52 Bicycle Lane Striping Project $20,209 $10,104 $10,105
Westward Ho Dr. Sidewalk Project $50,198 $25,099 $25,099
Total $70,407 $35,203 $35,204
Moreno Valley (2)
Ironwood Ave. Sidewalk $110,000 $55,000 $55,000
Access Ramps at Various Locations $80,000 $40,000 $40,000
Total $190,000 $95,000 $95,000
Palm Desert
Florida Ave. Sidewalk Project $650,576 $325,388 $325,188
Palm Springs
Pedestrian Safety Sidewalk Project $119,400 $79,400 $40,000
Perris
Perris Blvd/Mildred Ave Sidewalks & Ramps $120,000 $60,000 $60,000
Attachment
RCTC SB 821 PROGRAM SUBMITTALS
FY 2004-05
Agency 1 Project
Total SB 821 Funds Local
Cost Requested Match
Riverside (9)
Alessandro Blvd. Sidewalk $104,100 $45,804 $58,296
Central Avenue Sidewalk $28,800 $14,400 $14,400
Cortez Street Sidewalk $93,000 $46,500 $46,500
Maude St. Sidewalk $44,500 $22,250 $22,250
Philbin Ave. Sidewalk $81,750 $40,875 $40,875
Horace Street Sidewalk . $94,300 $47,150 $47,150
Victoria Avenue Sidewalk $321,820 $45,055 $276,765
Wheelchair Ramps $69,600 $34,800 $34,800
Vasquez Place Sidewalk $81,396 $40.698 $40,698
Total $919,266 $337,532 $581,734
Riverside County (6)
Rider Street Sidewalk
Wood Road Sidewalk
Center St. Sidewalk
Hastings Blvd. Sidewalk
Grant St. Sidewalk
Clinton St. Sidewalk
Total
San Jacinto
Sidewalk & Ramps Improvement Project
Temecula
Rancho Vista Road Sidewalk
$154,000 $108,000 $46,000
$430,000 $301,000 $129,000
$124,400 $87,080 $37,320
$56,000 $39,000 $17,000
$129,000 $90,000 $39,000
$65,000 $45,500 $19,500
$958,400 $670,580 $287,820
$150,000 $65,000 $85,000
$81,100 $60,825 $20,275
Grand Totals -18 Agencies
46 Projects $5,428,357 $3,269,490 $2.158.$67
Total SB 821 Funds Available $1,219,424
JR: 6/2/04 Rev. 7/1/04
Attachment II
RIVERSIDE COUNTY TRANSPORTATION COMMISSION
SB 821 EVALUATION CRITERIA
FACTOR
1. USE
The extent of potential use of a bicycle or pedestrian facility is the
most important factor. Emphasis of this factor helps ensure the
greatest benefits will be derived from the expenditure of SB 821
funds. Relative usage is to be derived from analysis of trip
generators and attractors adjacent to the project.
2. SAFETY
Points are awarded on the basis of a project's potential to correct
current safety problems.
3. IMPORTANCE AS A TRANSPORTATION ALTERNATIVE
Points are awarded on the basis of a project's potential to attract
users who would otherwise use an automobile.
4. MISSING LINK, EXTENSION, OR CONNECTIVITY
Points are awarded to projects that link, are extensions of, or
potentially connect to existing facilities.
5. MATCHING FUNDS
This factor is used to help ensure that there is local funding
participation in the project - not just an application for "free"
money. One point would be awarded for each 5% of total project
cost that is financed by the local agency.
6. POPULATION EQUITY
The purpose of this factor is to help ensure that one agency does
not receive all the funds. The applicant receives the maximum 10
points if the amount of funds requested does not exceed what the
applicant would receive if the funds were allocated by population.
Year to year totals are recorded so that an applicant could build up
a "credit". (Calculated by RCTC)
7. PHYSICAL ACCESSIBILITY ENHANCEMENT
The purpose of this factor is to enhance the physical accessibility
of existing pedestrian projects. Applicant agencies may receive up
to 10 "bonus" points for their project proposals which improve the
physical access to existing facilities.
MAXIMUM
POINTS
25
20
20
15
10
10
10 BONUS
RCTC: 04/12/1995
R an k
Agency
1 Perris
2 Moren o Valley
3 La Quinta
3 San Jacinto
5 H emet
6 Bann ing
7 Desert Hot Sprin gs
8 Co achella
9 Riv erside
10 Riverside
11 Bann ing
12 Desert Hot Springs
13 Riv erside
14 Banning
15 Bann ing
16 Riverside
17 Moreno Valley
18 Temecula
19 Banning
19 Riv erside
21 La Qu inta
22 Palm Springs
23 Bann in g
24 Riverside
25 Blythe
RI VERSIDE COUNTY TR ANSPORTATION COMMISSI ON
SB 821 BIC YCLE AN D PEDEST RIA N F ACILITIES P ROGRAM
FY 2004-05 RECOMME NDED F UNDIN G
Project Description
Perris Blvd/Mildred Ave Sidewalks/ Ramps
Ironwood A ve. Sidewalk
Westward Ho Dr, Sidewalk
Sidewalk & Ramps Impro ve. Project
Charlton/Lincoln Sidewalk/Access Ramps
Nicolet Middle School-George/Alessandro
West Driv e Sidewalk
De Oro Park Improvement Project
Victoria Ave. Sidewalk
Philbin Ave, Sidewalk
20th Street Sidewalk
Mesquite Av e. Sidewalk
Horace St, Sidewalk
Nicolet St, Sidewalk
Williams St. Sidewalk
Wheelchair Ramps
A ccess Ramps
Rancho Vista Road Sidewalk
George St. Sidewalk
Mau de St. Sidewalk
A ve, 52 Bicycle Lane Stripin g Project
Pedestrian Safety Sidewalk Project
H offer St. Sidewalk
Cortez St. Sidewalk
N. Carlton Ave. Sidewalk
Attachment III
Total SB 821 Funds Recommended C ummulati ve Average
Costs Req uested Allocatio n Funds Allocated Score
$120,000 $60,000 $60,000
$110,000 $55,000 $55,000
$50,198 $25,099 $25,099
$150,000 $65,000 $65,000
$112,681 $56,341 $56,341
$67,000 $33,500 $33,500
$47,000 $30,000 $30,000
$52,500 $42,000 $42,000
$321,820 $45,055 $45,055
$81,750 $40,875 $40,875
$36,000 $18,000 $18,000
$51,500 $35,000 $35,000
$94,300 $47,150 $47,150
$110,000 $55,000 $55,000
$73,000 $36,500 $36,500
$69,600 $34,800 $34,800
$80,000 $40,000 $40,000
$81,100 $60,825 $60,825
$29,000 $14,500 $14,500
$44,500 $22,250 $22,250
$20,209 $10,104 $10,104
$119,400 $79,400 $79,400
$90,000 $45,000 $45,000
$93,000 $46,500 $46,500
$26,750 $24,075 $24,075
$60,000
$115,000
$140,099
$205,099
$261,440
$294,940
$324,940
$366,940
$411,995
$452,870
$470,870
$505,870
$553,020
$608,020
$644,520
$679,320
$719,320
$780,145
$794,645
$816,895
$826,999
$906,399
$951,399
$997,899
$1,021,974
86.6
85.2
84.1
84.1
84,0
83.4
82.6
81.2
80 .8
80 .6
79.8
78.9
78.4
78 .2
78.0
77.8
76.4
75,6
74.0
74.0
71.9
70.8
70.4
70,0
69.7
Rank Aaencv
26 Riv erside County
26 Riverside Coun ty
28 Riverside
29 Blythe
30 Riverside Cou nty
31 Indio
32 Coron a
33 Indio
34 Indio
35 Riverside County,
36 Riverside Cou nty
37 Bann in g
38 Riv erside Coun ty
39 Riv erside
40 Palm Desert
41 Calimesa
42 Bann ing
43 Riv erside
44 Blythe
45 Blythe
46 Lake Elsinore
Totals
RI VE RSIDE CO UNTY TRANSPORTATION COMMISSION
SB 821 BIC YCLE AND PEDEST RIAN FACILITIES PROG RAM
FY 2004-05 REC OMMENDED FUNDING
Proiect Description
Rider St. Sidewalk
Gra nt St. Sidewalk
Alessa ndro Blvd. Sidewalk
Chanslorway Sidewalk
Center St. Sidewalk
Indio Blvd. Sidewalk - Vario us Locations
Access. to N. Main Metrolink Statio n
Indio Blv d. Sidewalk - Park St./Civic Ctr .
Jefferson St./Dune Palms Road Sidewalk
Hastings Blvd. Sidewalk
Wood Road Sidewalk
Lions Park Sidewalk
Clinton St. Sidewalk
Cen tral A ve. Sidewalk
Florida Ave. Sidewalk
School Bus Stop Project
Hermosa A ve. Sidewalk
Vasquez Place Sidewalk
S. Solano St. Sidewalk
Solan o St, Sidewalk
Lake Elsinore Outlet Channel Pedestrian
& Bicycle Corridor Project
Total SB 821 Fu nds
Costs Requested
$154,000 $108,000
$129,000 $90,000
$104,100 $45,804
$22,600 $20,340
$124,400 $87,080
$198,000 $180,000
$182,000 $154,700
$48,400 $44,000
$27,500 $25,000
$56,000 $39,000
$430,000 $301,000
$60,000 $30,000
$65,000 $45,500
$28,800 $14,400
$650,576 $325,388
$160,409 $144,368
$22,000 $11,000
$81,396 $40,698
$29,000 $23,200
$29,150 $23,320
$694,718 $494,718
Attachment III
Recommended Cummulative Average
Allocation Fu nds Allocated Score
$108,000 $1,129,974 69,5
$89,450 $1,219,424 69.5
$0 $1,219,424 68.6
$0 $1,219,424 68.5
$0 $1,219,424 67.9
$0 $1,219,424 67.2
$0 $1,219,424 66 .9
$0 $1,219,424 66.2
$0 $1,219,424 66 .0
$0 $1,219,424 65.9
$0 $1,219,424 65.5
$0 $1,219,424 64.6
$0 $1,219,424 62.9
$0 $1,219,424 62.8
$0 $1,219,424 62.6
$0 $1,219,424 61.5
$0 $1,219,424 60.0
$0 $1,219,424 57.8
$0 $1,219,424 55.3
$0 $1,219,424 50,3
$1,219,424 32.3
$5.428,357 $3,2.69,490 $1,219.424
AGENDA ITEM 7
A presentation will be made but
there is no attachment to the
agenda for item 7.
AGENDA ITEM 8
A presentation will be made but
there is no attachment to the
agenda for item 8.
AGENDA ITEM 9
RIVERSIDE COUNTY TRANSPORTATION COMMISSION
DATE:
July 19, 2004
TO:
Technical Advisory Committee
FROM:
Ken Lobeck, Staff Analyst
THROUGH:
Cathy Bechtel
Director, Transportation Planning and Policy Development
SUBJECT:
CMAQ, DEMOT21, STP, STIP, and TEA funded Project Milestone
Reports — July 2004 Required Update
STAFF RECOMMENDATION:
This item is for the TAC to receive notification of the July 2004 Project Milestone
Reports Required Update for CMAQ, DEMOT21, STP, STIP, and TEA funded projects.
BACKGROUND INFORMATION:
Requests for updated project milestone reports for unobligated CMAQ, DEMO, STP,
STIP, and TEA funded projects will be sent out about July 15th. Although obligation
updates have been accomplished for some of the projects recently, this is the first full
update since February 2004.
The report format has been revised slightly to include (1) additional monitoring fields
RCTC staff will complete, (2) a modification to the milestone reports that combines
multiple federally funded projects (e.g. CMAQ and STPL) into one report, and (3)
updated STIP/RTIP programming years along with recent obligation estimates provided
to RCTC. Please review the program years and phase schedules dates in addition to any
other needed corrections.
Project lead agencies will still only provide (1) updated project schedules (for PAED,
PS&E, R/W, and Construction), (2) the estimated obligation date, and (3) the percent
complete for applicable phases. Reports continue to be formatted as an Excel file
without field protection (locked fields).
Updated reports need to be returned to RCTC no later than July 30, 2004. The updated
milestone reports will provide a clearer picture of the projects that plan to obligate their
funds prior to the August deadline and beyond.
AGENDA ITEM 10
A presentation will be made but
there is no attachment to the
agenda for item 10.
AGENDA ITEM 11
A presentation will be made but
there is no attachment to the
agenda for item 11.
AGENDA ITEM 12
A presentation will be made but
there is no attachment to the
agenda for item 12.
Transportation Air Quality Fundamental
(Transportation Air Quality 101)
INSTRUCTORS:
24
Date: Oct 13-14, 2004
Place: Caltrans Dist 8
Local Assistance
(Mervyn's Bldg.)
Rooms 103 A&B
Tianjia Tang, Ph.D., PE, Phone: 410-962-2177;
Fax: 410-962-3419; Tianjia.Tang@FHWA.DOT.GOV
10 South Howard St.,Suite 4000, FHWA-RC, Baltimore, MD 21201
LENGTH OF COURSE: 2 Days
PROFESSIONAL DEVELOPMENT HOURS: 16 Hours
COURSE DESCRIPTION:
This course provides a comprehensive scientific principle, law/regulation, and current practices on transportation air quality.
Its breadth -and -depth coverage will benefit both policy makers and technical practitioners. Twelve chapters as outlined in the
course content below give not only a complete picture of air quality, but also the detailed step-by-step real world
project/program practices. The material can be also used as reference and guide for practicing professional. Over 100 exercises
with answers are provided to enhance participant's understanding of the material.
COURSE CONTENT:
1.Atmospheric Physics: Atmosphere layer, composition, measurement unit, temperature, pressure, volume, PVT relationship, and
gas solubility issues.
2.Atmospheric Chemistry: Formula, reaction, molecular weight, toxic exposure, VOC and NOx driven ozone issues.
3.Meteorology: energy transfer, wind, mixing, humidity, cloud/air mass, low/high pressure, fronts, sea/land breeze, inversion,
and how these parameters affect air quality.
4.Emission/Pollutant: VOC, CO, 502, particulate matter, nitrogen oxides, ozone, green house gas, emission classification,
sources, and definitions
5.History: Federal Air Quality Legislation as Related to Transportation Program/Plan/Project Development
6.Legal Obligation: NAAQS, air monitoring, nonattainment designation, design value, and boundary line determination (8 -hr ozone
and PM2.5)
7.Legal Obligation: State -Implementation Plan (SIP), objective, content, responsibility, and lead agency (8 -hr ozone and PM2.5).
8.Legal Obligation: Transportation Conformity, objective, content, responsibility, and lead agency (8 -hr ozone and PM2.5).
9.Tools Required: Emission factor (EF) modeling, objective, issues, and responsible party.
10.Tools Required: Program level TDF/VMT estimation and modeling.
11.Tools Required: Project level concentration modeling and methodology.
12.Cangestion Mitigation and Air Quality Improvement Proaram (CMAQ): Objective, criteria, process, and agency responsibility.
COST:
The course is free for all State and local government agencies and private consultants actively working on public projects.
US DOT, FEDERAL HIGHWAY ADMINISTRATION, RESOURCE CENTER
AIR QUALITY TECHNICAL SERVICE TEAM
TEAM LEADER — BOB O'LOUGHLIN
Rob ert.O' Lo ughlin@FHWA.D OT. GO V
PHONE: 415-744-3823 FAX: 415-744-2620
2004 STIP STAFF RECOMMENDATIONS - COUNTY SHARES
Does Not Include STIP Interregional Share Funding (See Separate Listing)
($1,000's)
35 0 4105
9 c l .,. S.
Riverside
Project Totals
by Fiscal Year
Project Totals by Com onent
Agency
Rte
PPNO
Project
Voted
Total
Prior
FY 051
FY 06
FY 07
FY 08
FY 09
RANIConst
E & P
PS&E
R/w Sup
C on Sup
Caltrans
10
7D
Ramon Rd interch improvements (02S-72)
3.7281
3,728
0 01
0
0 0('
797
0
547
2,157
227
0
Caltrans
79
660
Hunter Rd-Domemgoni Pkwy, widen (02S-58)
3,988
3,988
0 0'
0
0 01
1.527'
0
1.000
1.012
449
0
Caltrans
215
1210
HO V,TCL, El Cerrito- Rt 60/91 (028-102)' (RIP)
Sep -031
15,162
13,911
0 01
1,251
0
01
01 0
0
6,685
1,997
6,480
RCTC
cash
???
AB 3090 reimburse (Rt 60/91/215)(02S-102)(RIP, 85%)
26,625
0
0
01
26,625
0
O1
0; 26,625
0
0
0
0
Caltrans I
debt
121D
IGARVEE debt (Rt 215, El Cerrito- Rt 60/91)(RIP, 85% 1
Dec -031 111,484
0
21,043
22,6111
22,610
22,610
22.6101
01111,484
0
0
0
0
Indio
loc
OM
Indio 81, Jackson-Rt 111, rehab (delete 9-03)
lapse
3251
325
0
0
0
0
01
01 325
0
_ 0
0
0
Riverside Co
roc
1103
Van Buren BI, median, turnouts (delete 9-03)
lapse
1,323,
1.323
0
01
0
0
0i
01 1,323 0
0
0
0
I
Prior
Commitments (No t Part of Target)
1 162,635
23.275
21.043
22.611
50.486
22.610
22.610L
2.324! 139.757
1.5471 9 .854
2.673
6.480
I
1
Indio
loc
OM
!Indio Bl. Jackson-Rt 111. rehab (delete 9-03)
lapsel -325
0
0
0
0
0
-325
01 -325
0
0
0,
0
Riverside Co
loc
1103
IVan Buren BI. median, tumouts (delete 9-03)
lapse
-1,323
0
0
01
0
0
-1,323
0i -1,323
0
0 0
0
Caltrans !
10
7D
IRamon Rd interch improvements (02S-72
18,538
0
0
18,538
0
0
01
01 16,144
0
0
0
01
2,394
0
Caltrans
60
®
IHOV lanes. Rt 15 -Valley Way (RTIP)
1
3.261
01
0
0
01
0' 3 .261
0
01
'Caltrans
91
(Green River IC, aux Ins to Rt 71 (RIP (TCR #64 025-72
-�
0
0
0
0
3.889
01
01 3.889
0
0
0
0
RCTC _
cash
1109
1AB 3090 reimbursement (03-04 PPM)(02S-124)
16611 0
0
331
83
50
01
01 166
01 0
0
0
Coachella
gsep
1002
!Dillon Rd. UPRR grade separation
4,55911
0
0
0
0
0
4.5591
0' 4.559
0
0
0
0
Cathederal City
log
1001
IRamon Rd. Date Palm -east limit. improvements
1.385
0
0
1
1.3851 0
01
01 1.385
0
_ 0
_ 0
0
Coachella
loc
9992
IDillon Rd. Rt 86-Rt 10. widen
2,117
0
0
0
0
2.117
0
0 2.117
0 0
0
0
-6 Hot Springs
loc
OL
(Pierson BI, rehab pavement
627
0
0
6271
0
0
01
01
592
01 35
Oi 0
Moreno Valley
loc
1005
IPerrls Blvd improvements
3,184
0
0
3,184
0
0
01
0
3.1841
01 0
01 0
Moreno Valley
loc
9993
Reche Vista Dr realignment. signals
1.967
0
0
1.967
0
0
01
0
1.967
0
0
01
0
Murrieta
loc
9991
IRt 15 Calif Oaks/Kalmia interchange improvs
7.366
0
0
2.224
5.142
0
0
2.224
5.142
0
0
01 0
Riverside 1
loc
9994
Van Buren BI, Jackson St -Santa A na River, widen
3,4651
0
0
0
3,465
0
01
0 3;465
0
0
0
0
Riverside Co
loc
1101
IMiles Av, Clinton St. wide n
2,040
0
0
2,040
0
0
01
0 2,040
0
0
0
0
RCTC
tdm
9801
IRideshare program
1,220
0
0
400
300
400
120!
0
1,220
0
0
0
0
RCTC
9803
IPlanning. programming. and monitoring
2.228
0
170
953
105
500
500
0
2,228
0
0
0
0
Blythe
loc
96E
Ilntake Blvd. Hobsonway-14th, widen, signal
NEW
I 1,0311
0
0
50
53
928
0
0
928
50
53
0
0
Blythe
loc
5K
ILovekin Bl. Rt 10 -14th, rehab/reconstruct
NEW
8441
0
0
30
54
760
0
0
760
30
54
0
0
- RCTC
loc
92A
IRt 91, Mary St-Rt 60/215, HOV lanes, design
NEW
13,070
0
0
0
13.070
0 0
0
0
0
13,070
0
0
Riverside Co
loc
7G
IRt 10 Indian Av interchange, widen OC, ramps
NEW
2,000
0
0
0
2,000
0 0
2,000
0
0
0
0
0
Caltrans
101
7G
(Indian Av interchange, widen OC, ramps
NEW
13,112
0
0
0
0
13.112 0
0
11.520
0
0
0
1,592
Caltrans
101
53A
Rt 10 Jefferson St interchange, wide n OC
NEW
10,560
01 01
0
0
10,5601 0
0
8.840
0
0
0
1 ,720
Riverside Co
loc
1105
De Frain Bl. Hobsonway-6th Av, reconstruct
NEW
810
0
0
0
0
810! 0
0
810
0
01
0
0
Total
Proposed Again st Reprogramming Target
95.791
0
3,431
30.046
25,657
33,126
3,531
. 4,224
72,569!
80
13,2121 0
5,706
Cumulative
3.431
33.477
59,134
92,260
95.791
Reprogramin
Target, Fund Estimate
95,091
1 3.538
34,225
28,9531 28,375 0
Cumulativ e
3,538
37,763
66,716
95,0911
95,091
Total
Belo w (Ov er) Reprogramming Target
107
4.286
7,582
2.831
(700)
TE-Ellable Prolects
RCTC
1 res
1
TE reserve
14,648
01 01 0
9,513
2,542 2,593!
0 14,648
0
0
0
0
California Transporta tion Commission
Page 44 of 86
7/15/2004