Loading...
HomeMy Public PortalAbout10.25.82 Continuation of 10.18.82 VB MtgPLAINFIELLD VILLAC~ BOARD OF TRUSTEES Continuation of October 18, 1982 N~eting DATE: October 25, 1982 AT: Village Hall ME.MSERS OF Tim POARD PRESENT; Mayor Selfridge. Trustees: C. Smith, J. King, G. Ansley, L. Robinson, D. Lambert. OTHERS PRESENT: Administrator, J. West; Village Clerk, V. Krnac, Engineers, G. Gordan and A. Singh. Meeting was brought of order at 7:00 p.m. Roll call was taken. All members were present. At 7:05 p.m. bids were opened for the equipment to log all calls in our dispatching system: Dicta hone-Pitne Bowes Co. Four Channel Recorder Reproducer System Sub-Total -----~--------- $7, 879.70 Standard Installation ------------ - 141.00 First Year Maintenance ------------ 435.75 (Discounted by 25~) TOTAL ------------- $8,456.25 Eight Channel Recorder/Reproducer System Sub-Total --------__-_ $8,796.90 Standard Installation _______~_~~ First Year Maintenance 154.00 481.00 (Discounted by 25~) TOTAL ------------- 9 , 4 31.9 0 Motorola Four Channel, Single Transport Recorder -- $4,932.00 2 Telephone Couplers ----------- 360.00 Instant Recall Recorder --------_-- 1,750.00 Includes Installation First Year Maintenance Portable Reproducer four Channel ----------- 3,661.00 TOTAL EQUIPMENT COST ----------- $10,753.00 Lanier Business Products Cost Service Lanier Advocate II Four Channel Recorder-- $2,295.OQ $243.00 Time Injector ----------- 1,495.00 154.35 Four Channel Transcriber ------------ 749.00 92.40 Four Channel V. O. R. ~------------ 400.00 66.15 Telephone Recorder Coupler ------------- 439.00 56.70 90 minute Standard Cassette in lots of 60 ----------- 234.00 NSR Installation ------------ 60.00 NSR i• Sub-Total -- $5,672.00 Service -- 613.20 Total Investment -- $6,285.20 -2- • PLAINFIELD VILLAGE BOARD OF TRUSTEES October 25, 1982 Continuation of October 18, 1982 Meeting G. Ansley acknowledged receipt of bids. Seconded by J. King. Vote by roll call. Smith, aye; King, aye; Ansley, aye; Robinson, aye; Lambert, aye. 5 ayes, no nays. Motion declared carried. Mayor Selfridge appointed G. Ansley, L. Robinson and D. Lambert. as a committee to review the bids for logging equipment on dispatching calls in the radio room.. They will review the bids and report back to the Board at the next meeting, November 1, 1982. G. Ansley made a motion to authorize Engineer Gene Gordon to review. the plans for improving Illinois Route 126, from approximately Penn Road east to Ash Street. Not to exceed eight (8) hours of Engineering Study. Seconded C. Smith. Vote by roll call. Smith, aye; King, aye; Ansley, aye; Robinson, aye; Lambert, aye. 5 ayes, no nays. Motion declared carried. Engineer Ajit Singh, gave a report on Step Z Facility Plan for our Waste Water Treatment System, Project C-172552. Award of the contract should be out before October 1, 1984 to receive 75~ of the cost from the State. Engineer Gene Gordon, suggested a meeting far Saturday, November 6, 1982 a~ 11:00 a.m. to go over this Plan. This will allow the Baard time to review the Plan before the meeting. H. Countryman reported to the Board, Well #4 is ready to go, but before it can be put into use a sample for bacteria must be taken. Pumping has been monitored at approximately 850 gallons per minute. J. West had a question on employees working shift work, who would like to trade shifts. The Berard approved shift trades, but it must be approved by their Supervisor and Administrator J. West. We will try this for 90 days, if there are any problems, it will have to be stopped. Mayor Selfridge suggested to the Board to get back to regular Study Sessions, to get the problems solved that the Study Sessions were orginally called for. By motion meeting ajourned at 8:30 p.m. era Krnac, ' page Clerk c: