Loading...
HomeMy Public PortalAboutSIXTH AV_1313.POOLpdfCity of Tybee Island • Community Development Dept. a„� Inspection Report on 403 Butler Ave. - P.O. Box 2749 • Tybee Island, GA 31328 --MQ �... °/ Phone 912.472 -5032 - Fax 912.786.9539 CODErCOUNCIL / a MEMBER Permit No. 7 0 ?J Date Requested cP- �S Owner's Name y 00)12, Date Needed C;,� leo As— Gen. Contractor Ayr n, �)K Subcontractor Contact Information Project Address 1.3 13�/, Scope of Work poo' Inspector Inspectio n 4 1 U MW Lr Date of In's ,5 S e ction :4JA XA Wire &- ltwP �1�,5'� Fail Fee �R0LA Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee DATE ISSUED: 12 -31 -2014 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT SWIMMING POOL/FENCE- RESIDENTL 1313 SIXTH AVE MICHAEL BROWNE 355 ISLAND RD SAVANNAH GA 31406 ARCHITECTURAL POOLS 101 WINDFIELD DR SAVANNAH GA 31406 P $ 208.00 4- 0011 -04 -003 $22,500.00 PERMIT #: 140834 TOTAL BALANCE DUE: $ 208.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org CITY OF TYBEE ISLAND COMMUNITY DEVELOPMENT DEPARTMENT P.O. Box 2749 • 403 Butler Ave., Tybee Island, GA 31328 Phone (912)786 -4573 • Fax(912)796-9539 Swimming Pool, Spa and Hot Tub Permit Application g oo p Permit Number "' " .... ` * *OWNER & CONTRACTOR SIGNATURES REQUIRED" Location of work (street address) Contractor Ck v Electrician Address f-on, �b�{ Address Name & contact number ts L C�- °� -� Name &contact number Name of property owner It 3w 0\/V N Mailing address of property owner Telephone number of property owner 9 l �^ 5cq - q 66 3 Details of project p �t� X 7-2 �- 1�� Lt1 SW \ ynyvy- A/ U Da L__ Residential Commercial Estimated cost of construction '171 G D o_ _0 D ATTENTION PROPERTY OWNER: All swimming pool, spa and hot tub installations are required by law to have a final inspection. Do not make final payment to the contractor without first requiring a copy of the final inspection to assure the work is complete and code compliant. Do not use the pool, spa or hot tub until it has passed final inspection. �� I �LA " 9 ignatu e Date 17�v N OerpKn a ame Ir r � C Contractor � Qtee 14Y 1 �f 2y S cis ate Contractorprinted name Wper.mit; ' 5 \� --------------------------- _ _. -------------------­ . ._____ . ____ -___, Inspection requirements: Submittals with ;Pt(fee 1. Electrical Rough -in (minimum of one inspection; multiple • 1 copy o urvey ict/h tub, equipment, fencing, etc. inspections if applicable) • 2 sets of sp 'nations the pool /spa/hot tub • 3 sets of post -con sign professional, if applicable 2. Electrical Final • 3 sets of soil rosion/sedesign professional, if applicable 3. Project Final (includes inspection of required barrier, access •$250 Plan Review a t; forfeited if p roject is abandoned) gates, self - latching d evices, door alarms, etc., as applicable) _. -------------------------- - ----- ­_ _ _ -------------- .... - ----------------------------------- - --- - ..... - --------- -- ------ - - - - - -- Land Development Code, Article 3, General Provisions 1+� 08!01/2013 Section 3 -190. Swimming pool requirements and placement, C\\ �. All swimming pools, spas, and saunas shall comply with the following requirements: (A) Application for a permit to construct a swimming pool, spa, or sauna must be submitted to the building official. The structural plans must be approved by the building official prior to the issuance of a permit and the beginning of construction and/or excavation. A drainage plan prepared by a registered professional engineer will be required unless the city staff determines that due to the size, method of construction, location, or other characteristics of the proposed swimming pool, spa, or sauna, a drainage plan is unnecessary under the circumstances. (B) Swimming pools, spas, and saunas and supporting electrical and mechanical equipment may be located in either the side or rear yard and shall be at least five feet from the property line. (C) Swimming pool, spa, and sauna construction must meet all requirements of the codes adopted by the City of Tybee Island. (D) Once a swimming pool, spa, or sauna and its accessories have passed a final inspection it shall be a violation of this ordinance to remove or alter any of the equipment that is required by: the International Residential Code - Appendix G, the International Building Code - Section 3109, the National Electrical Code, and the Georgia State Amendments. Failure to maintain the safety related and/or electrical equipment in good and working order shall constitute a violation of this ordinance. (E) No swimming pools, spas, or saunas shall be placed across, on, or beneath any utility easements nor shall any utility easement be granted which bisects a swimming pool, nor be located within five (5) feet of any marsh buffers as delineated by the Georgia Department of Natural Resources. (F) When a swimming pool, its deck, or other accessory to a swimming pool is proposed for construction on a site that has already been improved, the swimming pool plans and permit application will be reviewed by the City Engineer. (a) If there is an approved drainage plan for the site the City Engineer will review the plans for the swimming pool, deck and accessory structure to ensure that the proposed improvements will not materially affect the drainage of the site. If they will materially affect the drainage of the site the applicant will have to have a drainage plan prepared by a design professional before a permit for the swimming pool, deck or accessory will be issued. (b) If the site was improved without a drainage plan, the City Engineer will review the pool plans and permit application to ensure that the swimming pool, deck or accessory structure will not increase the amount of run -off leaving the site. (G) Any permit for a swimming pool is required to contain a soil and erosion plan for the proposed site prior to the issuance of a permit and commencement of any const 'on related activity. (Code as amended 1012812010) ylt y - o il -6 60 Wp,ter's e pook 12 " -15" ��er .ter s Ede9e oot copin9 x -15' Aver 69 OBase Ada 1Zx -15 x over a;g, water's edge - -2� .t O eter-64 ents S USA per% mep,sure f21ER REErI P�aN aPpr °X 265 S4 Ft A BAR Grande 4 D r�x 180 ib5 10 7500 Gattons apP ' � 1 -B Date�12117 � SCALE, i 'hen the fill sand leas,m=bed the bottom of the return inlet ,fittings, run.all the pool piping to the , - luipmeot site, Ammon t: spais/Ma1 labs Apppcafion 9: Swfmming Poole c Ycoi is %yui� c d th a light or other in waU accessory, run the appropriate conduit or piping. ntinur the sand b=!: fl-11 �, _• -_ Wit_ =mot �- -� �a__,, "-AV r� 7' . 'r o►ta.�. All Ele wsl ¢rL�il l�^ •:J �L Vii; amply with Tkgo r;�9i��?a9 L7C" < - .ZdT1L?9xi� anrr,�. of Georgla An. ancia . , ' POOL BONDING N EC..=/ Section 680 Pool shell, electrical equipment, all related fixed metal parts and :raze for CtiC coacfEtc citxk Or collar .7 i�i'�g�iih► *'►w; a "4" b wV ;�:.'.e; iih:.:.vY'-.6 0Slt (�tCOti*t ending required. .t }: ___ -� -- � - - -- ..�.� ...�•_ . Wit, _ ►,�. __ ._. t_, ,._�_ -� - - -� -_ _,� .._ �,.- _ - -. .� r-�ag.lip to I<in the Ior, -f! _`__t T ;w_a__t: _" a.� -__ -� _ _._— _.L!__ .►_ •a- _��_ ssttiug irb rnay s Icy., ... ,r ..__r _ - -_ -- -. �t• �_ ._ .�..�_ -T _ 't -_. _... - -. -- -- - - - - - -._ a cA)//U d -="'1° ,2eaa ' v ' 11 %"., 1.1r I t It I i M! ra s at ons must v!lff, •_' r; International Plunibl% WVrJq tr'•dAe •'P'""r• wr Code 2d/2 Edition and State A"°'-e 34A.1.0 of Georgia Amendments �'r" REVIEW FOR $ b Dn made Rt IAa Identify Every effort has ht by the code violations, no oversight a reviewer shall be conaiter or as WWI 1 ft to violate, cancel, UV any applicab permit should n oibe construe review and as a warranty or uarantee• ' Pate , Reviewed BY—' "An APP roves: Set Of Plans Must N 891naln on Job Site at All 11mes SWIMMING POOLS AND SPAS All construction must comply VAth the ISPSC POOL AND SPA BARRIER iSPSC..?�— Section 305 A permanent fence, wall, building wall, or combination thereof is required to estrid access to pool or spa. Residence i i i i i i i i lit 101 `iA 31400 oHie� 912 -965 -0560 Faeu. 678 -840 -3842 www:a -a-x ciurat f.xa �wlv Pool setback line 17;yi9_ e 13y: De Kf,f re, K y rUL o:�, Dal v. 07/17/2014 Scaly 1 /8 " =1' Property Line FOR: Terry Browne All Electrloal Inste latl0n, must oomply filth Tha 519tioncl EI9ctrlo t EdItlon and State t Gsor�;In Amsndlnenta POOL BONDING :k line NECY — Section 680 Pool shell, electrical equipment, all related fixed metal parts and equipotential bonding required. ADDRESS: 1313 6th Avenue 0-ry: Tybee Island ST. Property Line ZIP: PROJECT RESIDENCE I i i i Pool setba Grande IV 23' M I i N 5ft. i 5ft. LO 101 `iA 31400 oHie� 912 -965 -0560 Faeu. 678 -840 -3842 www:a -a-x ciurat f.xa �wlv Pool setback line 17;yi9_ e 13y: De Kf,f re, K y rUL o:�, Dal v. 07/17/2014 Scaly 1 /8 " =1' Property Line FOR: Terry Browne All Electrloal Inste latl0n, must oomply filth Tha 519tioncl EI9ctrlo t EdItlon and State t Gsor�;In Amsndlnenta POOL BONDING :k line NECY — Section 680 Pool shell, electrical equipment, all related fixed metal parts and equipotential bonding required. ADDRESS: 1313 6th Avenue 0-ry: Tybee Island ST. Property Line ZIP: PROJECT RESIDENCE I AfQffS 1. WS PEA T IS 9"CT TO ANY FACTS 1NA f HAY 6£' DISCLOSED BY A FULL AND AXVRA Yr 77 11E SEARCH. I ACCORM0 10 F.I.R.H. MAP NO. 130510 LW. MrC77HE DAZE "/ K WS PARCEL SHOW HEREON LIES #V ZO VE• A& A SPECIAL FLOOD HAZARD AREA, 8FE 12.0'. JIM DELANE DAUGHTRY P,N: 4 -0011 -04 -001 220'00 E 53.00' CMF OO.. - - -� 112PAL�M lc. 46 j; x 2Z Al -7 Al � LEGEND 8CMF - CONCRETE MONUMENT FOUND ( HACKCLUSTER -OHPL— - OVERHEAD POWER LINE IC6 12' - SPOT ELEVATION PPo - POWER POLE LP - LIGHT POLE LOT 31 MACK — HACKBERRY TREE O HAROLD E & PAULA 8 WILLIAMS PIN: 4 -0011 —04 -002 F-- W F— PORCH Z W W I 52.6 F- O` 0 LL- 107.76' N 22'00 00 , E O p f x 140PALM x 12 -PALM x ■ 120PALM 14'PALlM X6 12 10'PALM 3I 12'� PAIY 00) I2 O • 16'PAUM O Gd t0 Z I O *Ar AR I G'PALJM 14'PALM 14 -PALM ' 120HAOCU x • 14'PALM x 12'PALM 14'PALM 1 53.00' -- S 22'00'00' w 626 ■ x6.67 1 ` 14'PALM� X5.54 5.54 X5 47 TOP OF 6x6 CMF ELEV -6.59' 1988 DATUM EDGE OF PAVEMENT 5 565 REFERENCES: D8. 359 -H. PG. 184 20 ft. SCALE: 1" - 20' !4 6TH AVENUE 17. �5 / / / / 0 W e O QO Q 00 Lo N J SHERRI 0 & JAMS A SIMMONS PIN- 4 -0011 — 04 —OC• x612 C G x 5.71 PORCH A TOPOGRAPHIC AND TREE SURVEY OF LOT 310, WARD 4, TYBEE ISLAND, CHATHAM COUNTY, GEORGIA SURVYED FOR MICHAEL & TERRY BROWNE PIN# 4- 0011 -04 -003 • NO. 188 THIS SURVEY WAS PREPARED IN CONORMITY WITH THE TECHNICAL STANDARDS FOR PROPERTr SURVEYS IN GEORGIA AS SET fORTH /N CHAPTER 180 -7 OF N£ RULES Of THE GEORGIA BOARD OF REGISTRATION fOR PROfESSIOYVAL ENGINEERS AND LAND SURVEYORS AND AS SET FORTH IN THE GEORGIA PLAT ACT O.C.C.A. 15 -6 -67 Ytncent Helmly 129 -A BURTON ROAD SAVANNAH, GEORGIA 31405 (912) 925 -3523 FIELD SURVEY DATE.• 02127114 DA M- 03/03/14 .IOB/ 14 -47