HomeMy Public PortalAboutSIXTH AV_1313.POOLpdfCity of Tybee Island • Community Development Dept. a„�
Inspection Report on
403 Butler Ave. - P.O. Box 2749 • Tybee Island, GA 31328 --MQ
�... °/
Phone 912.472 -5032 - Fax 912.786.9539 CODErCOUNCIL
/ a
MEMBER
Permit No. 7 0 ?J Date Requested cP- �S
Owner's Name y 00)12, Date Needed C;,� leo As—
Gen. Contractor Ayr n, �)K Subcontractor
Contact Information
Project Address 1.3 13�/,
Scope of Work poo'
Inspector
Inspectio
n 4 1 U
MW Lr Date of In's ,5 S e
ction
:4JA XA Wire
&- ltwP �1�,5'� Fail Fee
�R0LA
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
DATE ISSUED: 12 -31 -2014
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
SWIMMING POOL/FENCE- RESIDENTL
1313 SIXTH AVE
MICHAEL BROWNE
355 ISLAND RD
SAVANNAH GA 31406
ARCHITECTURAL POOLS
101 WINDFIELD DR
SAVANNAH GA 31406
P
$ 208.00
4- 0011 -04 -003
$22,500.00
PERMIT #: 140834
TOTAL BALANCE DUE: $ 208.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
CITY OF TYBEE ISLAND
COMMUNITY DEVELOPMENT DEPARTMENT
P.O. Box 2749 • 403 Butler Ave., Tybee Island, GA 31328
Phone (912)786 -4573 • Fax(912)796-9539
Swimming Pool, Spa and Hot Tub Permit Application
g oo p Permit Number
"' " ....
` * *OWNER & CONTRACTOR SIGNATURES REQUIRED"
Location of work (street address)
Contractor Ck v Electrician
Address f-on, �b�{ Address
Name & contact number ts L C�- °� -� Name &contact number
Name of property owner It 3w 0\/V N
Mailing address of property owner
Telephone number of property owner 9 l �^ 5cq - q 66 3
Details of project p �t� X 7-2 �- 1�� Lt1 SW \ ynyvy- A/ U Da L__
Residential Commercial Estimated cost of construction '171 G D o_ _0 D
ATTENTION PROPERTY OWNER: All swimming pool, spa and hot tub installations are required by law to have a final
inspection. Do not make final payment to the contractor without first requiring a copy of the final inspection to assure the work is
complete and code compliant. Do not use the pool, spa or hot tub until it has passed final inspection.
�� I �LA
" 9 ignatu e Date
17�v N
OerpKn a ame
Ir r
� C
Contractor � Qtee 14Y 1 �f 2y S cis ate
Contractorprinted name Wper.mit; ' 5 \�
--------------------------- _ _. ------------------- . ._____ . ____ -___, Inspection requirements:
Submittals with ;Pt(fee 1. Electrical Rough -in (minimum of one inspection; multiple
• 1 copy o urvey ict/h tub, equipment, fencing, etc. inspections if applicable)
• 2 sets of sp 'nations the pool /spa/hot tub
• 3 sets of post -con sign professional, if applicable 2. Electrical Final
• 3 sets of soil rosion/sedesign professional, if applicable 3. Project Final (includes inspection of required barrier, access
•$250 Plan Review a t; forfeited if p roject is abandoned) gates, self - latching d evices, door alarms, etc., as applicable)
_. -------------------------- - ----- _ _ _ -------------- .... - ----------------------------------- - --- - ..... - --------- -- ------ - - - - - --
Land Development Code, Article 3, General Provisions 1+� 08!01/2013
Section 3 -190. Swimming pool requirements and placement, C\\ �.
All swimming pools, spas, and saunas shall comply with the following requirements:
(A) Application for a permit to construct a swimming pool, spa, or sauna must be submitted to the building official. The structural plans must be approved by the
building official prior to the issuance of a permit and the beginning of construction and/or excavation. A drainage plan prepared by a registered professional
engineer will be required unless the city staff determines that due to the size, method of construction, location, or other characteristics of the proposed swimming
pool, spa, or sauna, a drainage plan is unnecessary under the circumstances.
(B) Swimming pools, spas, and saunas and supporting electrical and mechanical equipment may be located in either the side or rear yard and shall be at least five feet
from the property line.
(C) Swimming pool, spa, and sauna construction must meet all requirements of the codes adopted by the City of Tybee Island.
(D) Once a swimming pool, spa, or sauna and its accessories have passed a final inspection it shall be a violation of this ordinance to remove or alter any of the
equipment that is required by: the International Residential Code - Appendix G, the International Building Code - Section 3109, the National Electrical Code, and
the Georgia State Amendments. Failure to maintain the safety related and/or electrical equipment in good and working order shall constitute a violation of this
ordinance.
(E) No swimming pools, spas, or saunas shall be placed across, on, or beneath any utility easements nor shall any utility easement be granted which bisects a
swimming pool, nor be located within five (5) feet of any marsh buffers as delineated by the Georgia Department of Natural Resources.
(F) When a swimming pool, its deck, or other accessory to a swimming pool is proposed for construction on a site that has already been improved, the swimming pool
plans and permit application will be reviewed by the City Engineer.
(a) If there is an approved drainage plan for the site the City Engineer will review the plans for the swimming pool, deck and accessory structure to ensure that
the proposed improvements will not materially affect the drainage of the site. If they will materially affect the drainage of the site the applicant will have to
have a drainage plan prepared by a design professional before a permit for the swimming pool, deck or accessory will be issued.
(b) If the site was improved without a drainage plan, the City Engineer will review the pool plans and permit application to ensure that the swimming pool, deck
or accessory structure will not increase the amount of run -off leaving the site.
(G) Any permit for a swimming pool is required to contain a soil and erosion plan for the proposed site prior to the issuance of a permit and commencement of any
const 'on related activity. (Code as amended 1012812010)
ylt
y - o il -6 60
Wp,ter's e
pook
12 " -15" ��er
.ter s
Ede9e
oot copin9
x -15' Aver 69
OBase
Ada 1Zx -15
x over a;g,
water's edge - -2�
.t O eter-64
ents S USA per%
mep,sure f21ER REErI P�aN aPpr °X 265 S4 Ft
A BAR Grande 4 D r�x 180 ib5
10 7500 Gattons
apP '
� 1 -B
Date�12117 �
SCALE,
i
'hen the fill sand leas,m=bed the bottom of the return inlet ,fittings, run.all the pool piping to the , -
luipmeot site,
Ammon t: spais/Ma1 labs
Apppcafion 9: Swfmming Poole
c Ycoi is %yui� c d th a light or other in waU accessory, run the appropriate conduit or piping.
ntinur the sand b=!: fl-11 �, _• -_ Wit_ =mot �- -� �a__,,
"-AV
r� 7' . 'r
o►ta.�.
All Ele wsl ¢rL�il l�^ •:J �L Vii;
amply with Tkgo r;�9i��?a9 L7C" <
- .ZdT1L?9xi� anrr,�.
of Georgla An. ancia
. , ' POOL BONDING
N EC..=/ Section 680
Pool shell, electrical equipment,
all related fixed metal parts and
:raze for CtiC coacfEtc citxk Or collar .7 i�i'�g�iih► *'►w; a "4" b wV ;�:.'.e; iih:.:.vY'-.6 0Slt (�tCOti*t ending required.
.t }: ___ -� -- � - - -- ..�.� ...�•_ . Wit, _ ►,�. __ ._. t_, ,._�_ -� - - -� -_ _,� .._ �,.- _ -
-. .� r-�ag.lip to
I<in the Ior, -f! _`__t T ;w_a__t: _" a.� -__ -� _ _._— _.L!__ .►_ •a- _��_
ssttiug
irb rnay s Icy., ... ,r ..__r _ - -_ -- -. �t• �_ ._ .�..�_ -T _ 't -_. _... - -. -- -- - - - - - -._
a
cA)//U
d -="'1°
,2eaa
' v
' 11 %"., 1.1r I t It I
i M! ra s at ons must
v!lff, •_' r; International Plunibl%
WVrJq tr'•dAe •'P'""r• wr Code 2d/2 Edition and State
A"°'-e 34A.1.0 of Georgia Amendments �'r"
REVIEW FOR $ b Dn made Rt IAa Identify
Every effort has ht by the
code violations, no oversight a
reviewer shall be conaiter or as WWI 1 ft
to violate, cancel, UV
any applicab permit should n oibe construe
review and
as a warranty or uarantee• ' Pate ,
Reviewed BY—'
"An APP roves: Set Of Plans Must N
891naln on Job Site at All 11mes
SWIMMING POOLS AND SPAS
All construction must comply VAth
the ISPSC
POOL AND SPA BARRIER
iSPSC..?�— Section 305
A permanent fence, wall, building wall,
or combination thereof is required to
estrid access to pool or spa.
Residence
i
i
i
i
i
i
i
i
lit
101 `iA 31400
oHie� 912 -965 -0560 Faeu. 678 -840 -3842
www:a -a-x ciurat f.xa �wlv
Pool setback line
17;yi9_ e 13y:
De Kf,f re, K y rUL o:�,
Dal v. 07/17/2014
Scaly 1 /8 " =1'
Property Line
FOR: Terry Browne
All Electrloal Inste latl0n, must
oomply filth Tha 519tioncl EI9ctrlo
t EdItlon and State
t Gsor�;In Amsndlnenta
POOL BONDING
:k line NECY — Section 680
Pool shell, electrical equipment,
all related fixed metal parts and
equipotential bonding required.
ADDRESS: 1313 6th Avenue
0-ry: Tybee Island ST.
Property Line
ZIP:
PROJECT RESIDENCE I
i
i
i
Pool
setba
Grande IV
23'
M
I
i
N
5ft.
i
5ft.
LO
101 `iA 31400
oHie� 912 -965 -0560 Faeu. 678 -840 -3842
www:a -a-x ciurat f.xa �wlv
Pool setback line
17;yi9_ e 13y:
De Kf,f re, K y rUL o:�,
Dal v. 07/17/2014
Scaly 1 /8 " =1'
Property Line
FOR: Terry Browne
All Electrloal Inste latl0n, must
oomply filth Tha 519tioncl EI9ctrlo
t EdItlon and State
t Gsor�;In Amsndlnenta
POOL BONDING
:k line NECY — Section 680
Pool shell, electrical equipment,
all related fixed metal parts and
equipotential bonding required.
ADDRESS: 1313 6th Avenue
0-ry: Tybee Island ST.
Property Line
ZIP:
PROJECT RESIDENCE I
AfQffS
1. WS PEA T IS 9"CT TO ANY FACTS 1NA f HAY 6£' DISCLOSED BY A FULL AND AXVRA Yr 77 11E SEARCH.
I ACCORM0 10 F.I.R.H. MAP NO. 130510 LW. MrC77HE DAZE "/ K WS PARCEL SHOW HEREON LIES #V
ZO VE• A& A SPECIAL FLOOD HAZARD AREA, 8FE 12.0'.
JIM DELANE DAUGHTRY
P,N: 4 -0011 -04 -001
220'00 E 53.00' CMF
OO.. - - -�
112PAL�M lc.
46 j; x
2Z Al -7 Al �
LEGEND
8CMF - CONCRETE MONUMENT FOUND ( HACKCLUSTER
-OHPL— - OVERHEAD POWER LINE
IC6 12' - SPOT ELEVATION
PPo - POWER POLE
LP - LIGHT POLE LOT 31
MACK — HACKBERRY TREE O
HAROLD E & PAULA 8 WILLIAMS
PIN: 4 -0011 —04 -002
F--
W
F— PORCH
Z
W
W I 52.6
F-
O`
0
LL-
107.76'
N 22'00 00 , E
O
p f
x 140PALM
x 12 -PALM
x ■ 120PALM
14'PALlM
X6 12
10'PALM
3I
12'�
PAIY
00)
I2
O
• 16'PAUM
O
Gd
t0
Z
I O *Ar
AR
I G'PALJM
14'PALM
14 -PALM '
120HAOCU x
• 14'PALM
x 12'PALM
14'PALM
1 53.00' -- S 22'00'00' w
626 ■ x6.67 1
` 14'PALM�
X5.54
5.54
X5 47
TOP OF 6x6 CMF
ELEV -6.59'
1988 DATUM EDGE OF PAVEMENT
5 565
REFERENCES:
D8. 359 -H. PG. 184
20 ft.
SCALE: 1" - 20'
!4
6TH AVENUE
17. �5 / / / /
0
W
e
O
QO
Q
00
Lo
N
J
SHERRI 0 & JAMS A SIMMONS
PIN- 4 -0011 — 04 —OC•
x612
C
G
x 5.71
PORCH
A TOPOGRAPHIC AND TREE SURVEY OF LOT 310,
WARD 4, TYBEE ISLAND, CHATHAM COUNTY,
GEORGIA
SURVYED FOR MICHAEL & TERRY BROWNE
PIN# 4- 0011 -04 -003
• NO. 188 THIS SURVEY WAS PREPARED IN CONORMITY WITH
THE TECHNICAL STANDARDS FOR PROPERTr SURVEYS
IN GEORGIA AS SET fORTH /N CHAPTER 180 -7 OF
N£ RULES Of THE GEORGIA BOARD OF REGISTRATION
fOR PROfESSIOYVAL ENGINEERS AND LAND SURVEYORS
AND AS SET FORTH IN THE GEORGIA PLAT ACT
O.C.C.A. 15 -6 -67
Ytncent Helmly
129 -A BURTON ROAD
SAVANNAH, GEORGIA 31405
(912) 925 -3523
FIELD SURVEY DATE.• 02127114
DA M- 03/03/14 .IOB/ 14 -47