Loading...
HomeMy Public PortalAbout04-12-1919 - Special Session Office of Board of Public Works , 295 City of Richmond , Indiana, ' _ _ _ Saturday April 12th ,1919. ' _ (Special Session) The Board of Public Works of the City of Richmond , Indiana, met in special session in the office of said Board , Saturday April 12th, _1919, at _10 o' clock A. PM. All the members of I/ said Board being present , the following proceedings were had , To-Wit : - Pursuant ,to advertisement the Board received bids for the im- provement of South 9th Street from South "E" Street to the south corporatioh limits of the City of Richmond , Indiana, by', paving the roadway of said street in such portions thereof as is not provided for by the three mile road proceedings for the improve- ment of such highway now pending before the Board of Wayne County Commissioners , such street paving to be of like kind as that adopted by'1said Board of County Commissioners, and also for the • improvement of said street by building of cement curb & gutter on either side thereof , said street to be paved with one of the fol- lowing kinds of payment, to-wit : Brick-Concrete-Creosoted Wooden Block or Bituminous Macadam on Concrete Base, under Improvement Resolution No. 558-1919 C. M. Kirkpatrick , Bid : - (South 9 St. from South "E" to South line of South "H" ) Cement C. & G. 1' wide Straight , per linear foot ' $0.85 Cement C. & G. 1' wide Circle per linear foot 1.00 Cement roadway per square yard. 2.55 Sewer complete including C.Basin,inlet ,& man-hole per lin ' 1.90 (South 9th St, from South line S. "H" St. to South "L" St. ) Cement C. & 'G. _1' wide, Straight , per lin-ft. $0.85 Cement C. & G. 1' wide, Circle , per linwft . 1.00 Cement roadway , per square _yard 2.65 Catch:basins, each complete _ t 60.00 Sewer inlets complete with connections , each 58 .00 John F. Hipskind, bid : - (South 9th St , from S. "E" St. 'to south line of S. "H" St. ) Straight Cement C. & G. 1' wide, per tin-ft . $0.85 Circle Cement C. & G. 1' wide, per lin-ft 0.98 Cement roadway, per square yard 2.67 Sewer complete , inc .catch-basin, inlet& man-hole ,lin-ft .--- 1.98 (South9th St.from Southline S. "H" to South "L" St. ) Straight Cement C.& G. l'wide, per 'lin-ft . 30.85 Circle Cement C. & G. 1' wide,per;_,1in-ft::.-= 0.98 Cement roadway , per square yard 3.17 Catch-basins complete , each 50.00 Sewer inlets complete , with connections , each 30 .00 (Bids continued next page ) • 296 Bids; cont'd. , Connor & Sherry, bid :- (South 9th St ,from S."E" to south line of S."H" St. ) ' Straight cement C. & G. 1' wide, per tin-ft : $0.89 Circle cement. C. & G. 1' wide, per lin-ft . 1.17 Cement roadway, per square yard 2.48 Sewer complete,inc . catch-basin,fnlets & manhole ,lin-ft . 2.67 • (South 9th St.from S. "H" to South "1" St. ) Straight Cement C. & G. 18wide, per tin-ft . $0.89 Circle Cement C. & G. 1' wide,per lin-ft. 1.17 Cement roadway , per square yard - 3.16 Catch-basins complete, each 72.00 - Sewer inlets complete with connections, each 57.00 .The Board now decide that as the County' s portion of said improvement is to be concrete, the Board designates that said - South 9th St . be improved by paving. the roadway with concrete according to the plans & specifications, under Improvement . Resolution No. 658-1919. All bids being above the estimate of the City Civil Engineer, and Mr. Kirkpatrick , being the lowest and best bid, Mr.Jo nson - moved that the contract be awarded . to Mr. C. M. Kirkpatrick, at the estimate of the City Civil Engineer, which is $17 ,040 .75 Mr. Kirkpatrick ; having, agreed to construct the inlets at 038 .60 as a part of said contract , .thereby bringing his bid price down . to $17 ,040 .75 the estimate of City Civil Engineer, the motion prevailed and the contract was so awarded to the said C. M. . . Kirkpatrick. • • The Board received bids for the improvement of the north side of South "B" St. by constructing a cement sidewalk 6' wide, also cement curb & gutter from the east terminal of the presentement sidewalk on north side of Tract 511 Official Map , to South 21st • Street , as per Improvement Resolution No. 561-1919 . • Daniel G. Burkhardt , bid : Straight , cement curb & gutter $0.98V per lin-foot Cement sidewalk 6' wide - 0. 20V per laquaie. foot The bid o f Daniel G. Burkhardt , being the only one received and being within the estimate of the City. Civil Engineer, Mr. Peitz , moved the contract be awarded to said Daniel G. Burkhardt , motion prevailed, and contract so awarded. • The Board then adjourned, • .011/ 4 / 'r7X, _;�, Presider Board&. Attest • - Clerk of Board . -