HomeMy Public PortalAbout10.10.88 VB Public Hearing MinutesPLATN~'IELD VILLAGE BOARD OF TRUSTEES
PUBLIC HEARING
DATE: OCTOBER 10, 1988 AT: VILLAGE HALL
MEMBERS OF BOARD PRESENT: MAYOR LATTA, J. BOOTZ, D. GULLICKSEN,
L. KELLY, D. LEWIN. J. DEMENT AND
K. CALLANAN WERE ABSENT.
OTHERS PRESENT: M. PUSINELLT - ADMINISTRATOR
V. KRNAC - VILLAGE CLERK
P. WALDOCK - PLANNER
At 7:03 p.m. Mayor Latta opened the meeting.
Roll call was taken, J. Dement and K. Callanan'were absent.
Mayor Latta stated the purpose of this Public Hearing is the
Annexation Agreement for Flow-Con Industries, located at 835 143rd
Street. Planner Waldock reported this item was discussed a couple
of weeks ago. A Public hearing was scheduled but due to a
deficiency in the notice we rescheduled the public hearing to
this evening. The property is located on the north side of 143rd
Street just west of Village Well #4, west of Route 59 and east
of Route 30. The Board members have a copy of the Annexation
Agreeeent. Mayor Latta stated she would like Section 4-D to state
"the property would meet the State Statute as may be amended in
the future". After same discussion of the parking area, it was
the consensus that the developer will blacktop the parking area
in the front (south) on either side of the loading area and also
the parking area on the west side of the building. D. Gullicksen
questioned what material is the fire wall going to be constructed
of between the two (2) units. Jim Collette stated the fire
wall will be installed at the time of the construction of the
second unit and it will be to code. Also, it was agreed by the
Board that Section 4-E should read "Agree to submit a detailed
site plan for (remove Village and insert) staff approval. It
was agreed by the developer that 20 square feet of signage is
sufficient for two owners.
L. Kelly moved to adjourn. Seconded by D. Gullicksen. Voice
vote. 4 yes, 0 no. Motion carried.
7:36 p.m.
~/ '..
~~ /
L' :..~ . -~.,~
Vera Krnac -- illage Clerk