HomeMy Public PortalAbout03-18-1915 (2)Thursday ,':arch lath, 19150
to receive bide for the Improvement of North
to North "A" Street, by conntructing a
The Board mef m }a1n olnte named and
pavi
^0 etrertin said street, bthereoftirom gain Street to the nrth
the roadway the full width one of the hinds of modern Tate•
line of North "A" Street, belt -Creosoted Wooden Block,
Concrete-Snick-asp
men to
t0-wit:-wit.
"follows to- bid: 1.'J" s rde.
7 J, Connell, or wi re cut 1,H4 4"J
Brick, 'etropolitan Bloc gjTe put
Peebles Block or 1.H4 "
Medal „ ^ 1.H2 ^
„ "
^ Ironstone 1•H1,• -
^ ;ielsonvi I I a" " 1.:;2 "
Concrete _ - 1.72 Ter lln-ft.
Sewer complete
" Cronin & "ereditho bid:- _ al,Hy per sq-'7rd,
Brick, :letrocolitan lire cut l•H5 "
^ Peebles Block or wire cut
^ n Stone !lire cut
L:edal Block or Iro2:x per lin-1t.
Sewer complete
1:• B. Selspy, bid: '1.J0 per eq
Brickk, Letropolitan Block or vrire cut yl t B ^ "
Peebles Block or wire cut l,hB „
Ironstone - _ 1.65 "
Concrete - _ 2„3
Sewer complete - -
" John F. Hipskind, bid:
Brick, Letropolitan Block or ;vi re cut- 31*J5 per eq�yrd•
IV Peebles Block or wire cut - 1,y3 " so
VIronstone Block - 1.92 "
Metal Block - _ "
" Nelsonville Block 92
_ 1,„
Concrete - 1.92 1•75 per
lin-st
Sewer complete -
" F• B• Slick, bid: `1,97 per sq-7rd•
Brick, Metropolitan Wire cut - 1.95 „
Peebles w71re cut - - „
" Ironstone :lire cut - 1.93 „ „
Concrete - _ 1.80
Sewer complete - _ _ 1.74J " lin-�
" Daniel G• Burkhardt, bid: ,•l,
Brick, etropolitan Block or wire cut •12.1a per e9V
Peebles Block or wire cut - 2016 IT
To Terre -Haute Block or wire out - 2.18
Sewer complete - _ _ 2.32 per li°"natir�
And the Board now enters its preliminary order, dethe
that the said North 9th Street be improved by paving
with brick in accordance with plans and specifications•
The Board meets to receive bide for the construction otpato
120
and Streetnitary providedeforobblned in Improvement teain rolution 140from 11th 445-1'llD'
as follows to -wit:-
" F. Be Slick, bid: lineu,r
Sewer complete _ _ _ 32.69 per
" John F• Hipskind, bid: linear"
sewer complete _ _ _ y2,73 per foci
" W. Ito Payne, bid:
sewer complete _ _ _ $2.93 per linear
(Cont'd., next page).
(Bids cont'd•,)
" Cronin & Meredith,
Sewer complete -
" Lather Be Felsey,
t
Thursday March lsth, 1y150
bid;-
bid:- -
PeU per lin-foo-
Sewer comple e - - - 4@45 per lin-foc•
B
The bid of F. . Slick, being the lowest and within the esti-
mate of the City Civil Lagineer, the contract was on motion awar _
ad to the said F. He Sliok.
The Board recei ved bide for the construction of
cement sidewalke6'
wide on both sides of South 23rd Street, east aide
from Lain to
corporation line, west aide to South "A" street,
as provided for
by Improvement Resolution No. 457-19150 as follows$ to -wit:
we it. Payne, bid;
-
Sidewalk & cement alley crosswalk 6' wide
�0.11 7/ee soq-ft
" T, J. Connell, bid;
Sidewalk 6' wide- -
j0.15� sq-fy.
Cement alley cross -walks - -
0.14e ^
" Daniel G. Burkhardt, bid;
Cement sidewalks C: alley cross -walk. 6' wide
)0.15e ec-`
" Schneider Bros, bid,
:er.ent sidewalks & alley cross -walks 6' wide
,0.1" `-_
Kelsey, bid:
sidewalks, & alley crosswalk 6' wide
$0.1W eq-=:.
The bid of N. R. Payne, being the lowest and
being within tre
estimate of the City Civil Engineer, the contract was on motion
awarded to the said ,9. it. Payne.
The Board meets to receive bids, for the construction of cement
roadway in the alley first south of Min Street, running from the
east line of South 25rd Street east to the east corroration 19ne
thence south to the north line of Tract 549, official I;ap of the
City of Richmond, Indiana, as provided for by Improvement Reso-
lution No. 458-1J159 as follows,
to -wit: -Its Payne, bid; f0.12V per sc-ft.
Tway complete- - - 0 50tr ^ lin-ft.
"'er complete including :r,un-hole Sodding 0,10� i sennre
_ _ -
" T• J. Connell, bid; ,l4 r sq-ft.
Roadway complete - - ' 50� lin-ft.
Sewer complete inc'_udi ng r-tut-hole 1.00 " square
Sodding -
" ndwa• Slick, bid; 30.12jd per sq-ft•
y complete - 0.415 lin-ft•
r complete including Man -hole - 2.(0 TV square
ling _
"-hneider Bros., bid; %0.15V per sq-ft•
Away complete - 0046¢ lin-ft•
r complete - - - 2000 " square
Kelsey, bid; %0.16e per sq-ft•
✓ complete- - C.59e lin-ft•
QQ�Ier complete including manhole - 2 p0 square
3pd
ding
d0 �ae1 G. Burkhardt, bid; - ,`?0.15� per lin-ft
Sews y complete ^
spd r complete including manhole - 2,r0 aquare
o8 Thegb]d of ',7.;t.Fuyne being the lowest and within the estimate
City l;npineer,the contrue1 was eo awarded•