HomeMy Public PortalAbout04-01-1915 (2)910 Thursday April let, 19154
seedcont'd..
446-1915, Bide, wn0,88� per linear ft,
iS. E. i.elsey, Did: _ -fP
gutter 0.65� "
Straight curb & iter _ 0.12� square TV
Circle curb
being the lowest and within the
Cement the contract was on motion
The bid of Schneider Bro Engineer,
estimate of the City Civil
awarded to the Schneider Bros.,
The Board received bids for the impr
ovement of South 22nd Street
by grading & graveling the roadway & des constructing Sou cement curb,
putter & sidewalks 6' wide on both sides South "A" to 915
Street, as provided for by Improvement Resolution Iio. 450-1915,
as follows, to -wit: -
" T, J. Connell, bid:_ v4.20 per linear foot
Street complete -
„ John 3. Sittloh, bid; _ 94,70 per lihear foot
Street complete - bid; Daniel G. Burkhardt, _ %4.75 per linear foot
Street complete -
_
TV Vie Re Payne, bid; _ _ o5,30 per linear foot
Street complete -
„ Schneider Bros., bid; -5 53 per linear foot
Street complete -
it i. E, Kelsey, bid; _ y5.47 Per linear foot
Street complete if Cronin G I,Seredith, bid; -.5,48 per linear foot
Street complete -
is F. Be Slick, bid; w5,63 per linear foot
Street complete - The bid of T. J. Connell, being the lowest and within the
estimate of the City Civil Engineer, the contract was on motion
awarded to the said T. J. Connell.
The Board received bide for the construction of cement sidewalm
6' wide oh both sides of Center Street, from 21.11• 2nd to 11di915,
Street, as provided Yor by Improvement l;esolution Ito• 45 as follows, to-v,it:-
71. Payne, bid; �9uar6.;t'
Sidewalk 6' wide. - - a W0.144� Per
•
6„
Cement crosswulIm ' ^14
d de - - 0.-� „
Brick. crosswalk 5' wide
" Amos Le
Sidewalk 6' widebid; _0.15� per sq„ft.
cement crosswalk 6' vide - _ 0.15Yy� „
Brick Crosswalks 5' wide - - 0.16;
Me Be ft
SidewalkKelse61 Nide- _ y0.16}� Per sq-
Cement crosswalk 6' wide - - 0if
Brick crosswalk 5' wide - _ O.lU�
" Iiolte & Thompson, bid;
Sidewalk 6' wide- - 1,00 6YS' Per11
s9"
Cement crosswalk 6' wide - _ 0.16z „
Brick croeswalk 5' wide - _ 0.17y
(Cont'd., next i,age),
Thursday April 1st, 1915,
45;;_1915,bids cont'd.,
" Daniel G. Burkhardt, bid;
Sidewalk 6' wide- -
Cement crosswalk 6' wide _ _ �0.1 Per sq- t.
11
Brick crosswalk 5' wide - - 0018Q „ 11
" Schneider Bros., bid;
Sidewalk 6'-adde- - - 0.22y per sq-ft,
6
Cement crosswalk ' v.1de - - y0.22� „
Brick crosswalk 5' vide 0.28�
The bid of eve it. Payne, being the lowest and being within the
estivate of the City Civil Engineer, the contract was on motion
awarded to the said 'el. Re Payne,
The Board received bids for the furnishing of castings to be used
Burning the year ending April late 1916, as follows, to-
wit:-" Reliance Foundry Company, bid:
For all castings as per aneci fications 43-600 per hundred pounds
F. 0. Be any place within City limits.
" Srayne, Robinson & Company, bid;
For ell castings as nerspeci fications, 3y Ter pcund, delivered an.-7
place d'iithin the city limits.
Both bids being the same, the Board postponed action on bide
for considerateon of conditions contained in Svayne, Robinson
Co., bid.,
AtteSt `/
• :I.2-TT
The Board then ad? ours ed ,