HomeMy Public PortalAbout080_011_Derelict Structures - Engineering Task Order (amended) CITY OF TYBEE ISLAND Task Order Memorandum To: Olsen Associates, Inc. Date: 13 March 2015 2618 Herschel Street Contract: Coastal Engineering Consultation Jacksonville, FL 32204 Request Made By: City of Tybee Island Request Received By: Erik J. Olsen, P.E. Task Order No. 2014-01 (Rev. 1) Task Order 2014-01 (Rev. 1)—Derelict Structure Removal—Permitting/Design/RFP This Task shall be revised to account for expanded federal interagency coordination sufficient to acquire a "Nationwide Permit" from the Savannah District, USACOE. Permit conditions will directly affect project timing. In addition, the SOW is expanded to allow for the formulation of "design" documents sufficient to solicit Proposals, the cost of a post-fill beach condition survey, the actual RFP solicitation process, analysis of same, and a recommendation to the Town. A breakdown of costs for this expanded scope is included as Exhibit A. The revised authorized budget is increased from$10K to $78K. Olsen Associates,Inc. City of Tybee Island Erik J. d e , President Diane Schleicher, City Manager Date: Date: 13 March 2015 Enc/Exhibit A - 1 - 13 March 2015 Exhibit A T.O. 2014-01 (Rev.1) DISCUSSION Background — T.O. 2014-01 was authorized for purposes of seeking Letters-of-Permission (LOP's) to perform activities required to remove the derelict structure field lying seaward of Ft. Screven. The initial T&M budget was predicated upon little to no federal interagency coordination requirements related to ESA (piping plover; red knot; sea turtles). See Memo dated 10 November 2014 discussing the original T.O. (attached). Said coordination is now necessary due to in-depth site specific interagency concerns. It is proposed that the original T.O. be expanded to address the elevated level of project permitting involved, as well as several additional activities (not previously addressed) related to design, solicitation of proposals by marine contractors, etc. SUBTASKS • Permitting — It is proposed that this Task, which includes a meeting at the Savannah District, USACOE on 12 March 2015 be expanded from the original $10K budget to $21K. • Design — Utilizing the original survey data which located the subject derelict structures prior to burial by the 2008 federal beach fill, as well as updated beach survey info, aerials, etc., the consultant will formulate documents suitable for soliciting Proposals to perform the requisite removal activities (after 31 August 2015). Note — the documents formulated are not typical design documents but rather documents suitable for receiving Proposals which delineate Work Plans and Costs — from multiple qualified marine contractors. In addition, an updated beach survey in March or April will be required. The cost for this Subtask (including the beach profile survey by a subcontractor) is $35,000. 1 olsen associates, inc. 13 March 2015 Exhibit A T.O. 2014-01 (Rev.!) • Request for Proposals (RFP) — The consultant shall advertise the subject project over a 30-60 day period, as well as directly solicit interest from an in-house list of known marine contractors throughout the Southeast. The consultant shall likewise facilitate a pre-proposal meeting with prospective Contractors on Tybee Island intended to view the site, answer questions, or provide additional information regarding the work, permit terms, etc. Subject to the Request for Proposals, the consultant will analyze the submittals and provide a written recommendation to the City. The cost of this subtask is $22,000. Not included in this revised scope are future services required for construction observation, contract management, etc. Also, not included are permit fees, costs of legal advertisements, etc. ATTACH. 2 olsen associates, inc. M r • MEMORANDUM �= • • TO: Diane Schleicher, City Manager—City of Tybee Island olsen FROM: Erik J. Olsen, P.E. Ga. 011051 E�� associates, inc. P.E., Coastal Engineering DATE: 10 November 2014 RE: Derelict Structure Removal (T.O. 2014-01) Pursuant to your request late last year, I forwarded to you a Time and Materials Task Order addressing this issue on 20 December 2013. A copy is attached again for your consideration. In executing this Task Order it must be understood that the level of effect only addresses the acquisition of a Letter-of-Permission from the State and USACOE. Should either agency require a"Biological Opinion" or other similar assessment(s) due to the timing of the proposed action, the level of effort will increase significantly. In the recent past, the two (2) issues of sensitivity have been sea turtles (in the summer) and Piping Plover (in the winter). Most of the area of interest is in federally designated Piping Plover habitat. Thank you. Enc/ olsen associates, inc. 1 2618 Herschel Street I Jacksonville, FL 32204 1 904.387.6114 I FAX 904.384.7368 www.olsen-associates.com.