Loading...
HomeMy Public PortalAbout05-15-1916 (1)office of Board of Public Works, City of Richmond, Indiana. Monday May 15th, 1916, The Beard of Public Works of the City of Richmond, Indiana met in regular session at the office of said Board Monday May 15th, 1916, at 9 o'clock A.", Present, iiesera, Bavis, Marlatt & Etc1.'inn, All the members being present the following proceedings Were had , to -w it : - In matter of petitions filed for paving the roadway of South 17th Street, South 18th Street, and Reeveston Road, the Engineer %as directed to prepikre plans, and report the city's cost on said improvements, (Reeveston Streets). A petition was presented for improving North 17th Street, from North ,F" to "J" Street, by constructing curb, gutter, sidewalks and grading & graveling the roadway between the points named. The Board unanimously adopted Improvement Resolution No. 515.1916, for constructing cement curb,gutter, & sidewalks on both sides of street, and grading & graveling the roadway North 17th Street, from North "F" to "J" Street. The Board approved the contract & bond .of Jas. S. Logan, contract- or for painting hose houses. The matter of shortage of meters, transformers etc., in the sum of 41368.40, in the purchase of Electric plant of Richd. Light, Heat & Power op., was on motion referred to City Attorney., for Investigation and report. Pursuant to postponement to this date, the Board meets to hear all persons primarily asces<ed in the matter of widening the let alley south of West Main Street, from SW. 4th St, west, as pro- vided for by Dec&dratory Resolution No, 114-1916, The Board de- cide on account of dog in said alley, the same should not be widened, and on moti on rescind said resoluti on. Upon the payment of y10.00, and signing proper agreements. the Board grant permission to Mrs, Gregp„ to tap the sewer across Harris Street at the lst alley south of School Street, to connect Lot No, 8, Official Map, City of Richmond. The City Civil Engineer was directed to have hill side brick laid on North 5th Street hill instead of cement , the additional cost to be charged to the City of Richmond Indiana, as the Board deem cement construction on this part of work would be dangerous* Mr. Chas. Fetzer lessee of refreshment privileges at Glen Mil- ler Park, appearedp before th Board, askIrg thett his lease be transferred to Frank Williarplas he had sold his equipment to the said Fmnk Williams, the same was referred to City Attorney to draw up transfer. The City Engineer reported in the matter of remonstrance filed against improvement SW.3rd St from Rational Road to SW* "Ell St, that there are 42 resident owners £0 of whom have signed the remonstrance. Yonda y May 15th, 1916, BoardThe received d walks on eaetside Of North 8tb construction ction of cefr m"rt elde- 8 Street 916�caet fo l lowsere sl to -wit, ender Improvement resolution W, R. Payne, bid; Sidewalk complete___________ __ " Daniel G. Burkhardt, bid; =0.1141ar aq_ft Sidewalk complete ------------------ " Schneider Bros, bid: Z0•ll�fl per eq_h sidewalk complete --------____-_ ,12� per e The bid of ii.R.Payne & D. G. Burkhardt be7 q e ceived and under the estimatenof the City the lowest re - on request of D. G. Burkhardt, thehe up_ W. R. Payne . as warded to The Board received bide for the improvement of Soethwest 9th St, from National Road to Southwest "A" Street, by constructing cement curb, gutter, 5' sidewalk both aides, grading, graveling & paving roadway wi th either Concrete-Bitumdnone Macadam-Bitumd. nous-Concrete or Brick, under Improvement neseluticn Bo. 502-191E as follows, to -wit :- " i'. E. Slick, bid: Walk 5' wide----------------------_------$O.lOQ per sq-foot Straight curb & gutter ------------------- 0.65e lin-ft. Circle curb & gutter--------------------- 0.75i ^ Concrete roadway------------------------- 1.81 sq-yard. The Board thereupon designate that said street, be paved with Concrete. The Board received bids for the construction of cement roadway in the alley between Boyer & Ridge Street, from School to Grant Street under Improvement Resolution No. 505-1916, as follows: - "Daniel G. Burkhardt, bid; .0 13,E per sq-ft. Cement roadway complete --------------- ;r a F " Schneider Bros . , bid ; Cement roadway complete--------------------0.19�� " We R. Payne , bid ; Cement roadway complete--------------------j0'1 5� " " The bid of Daniel G. Burkhardt, being the lowest and within the estimate of the Cit; Civil EhFineer, the contract was awarded to said Daniel G. Burkhardt. The Board received bids, for the construction of cemennttooadway in the alley between Ridge and Runt Street, from Z°ee foilows: - StLeet, under Improvement Resolution No. 5C4-1916, " Ilaniel G. Burkhardt, bid; $0 12� rer sq-footo Cement roadway complete --------- „ " Schnei der Bros , bid ; _ ement roadway complete ------------ " CeW• R' Payne, bid ; -- ,p0.15� the lowest & the sent roadway complete -- -- --- within motion The Did of Daniel G. Burlhardt, being was on asOf of the City Civil Engineer, the contract awarded to said Daniel G. Burth°rdt.