Loading...
HomeMy Public PortalAbout09-21-19110 Office of Board of Public n'at Indiana, City of Sept tuberchmon , at 911. 21 , �` Thursday of Richmond, Indiana, ! blic Works of the City the office of said Boflrmembersuofday The Board °fa 9Caeion at , fi A. K, All the net in regular eg2 at, lgl', at 9ycssrs, Ij Yar.ond, Charles & 7,Sru7nrman, September resent, were to-wlt:- said Board beinsehad, The following proceedings_act & bond of A• Harsh Coal & Snpp rove the QOof Coal to the N. E L• & P. P. for The boardtheP�ishinB the Year ending September 20th, 1912• The Board meets to near all persons interested or whose 'proper! Sa affected et the following described public improvement: 40, 279-1911, providinF for the grading, ImprovementbResolutionwidering&'3 brick center of the alley between ■F%" Street to the P,C•C,1 graveling, l5th Street, from NOT all interested persons to North 14th & right-of-waY• After hearing St L. R.R• ri ht one appearing) and after carefully tend Of ih' who appeared, said improvement of cement instead of es an estimate on making tY rovament are equal to the er above stated. the board decides that�the benefits to proper liable to be assess for agaestinated by the City Civil Engine+ timated cost of the aame and thereupon lades final the same on saso asito provideoforsBaldgin- Im-' ally adopted, modifyinging opovementttonsehitade hero adopted in addition to th^ plans and light FAt A petition was Phe8ll �iT9ats�rtakenan lu^.d?raadv lsemantthP corner of North 4th & The City Civil Engineer reported the completion of coftractP under improvement Resolution No. 25&-1911, providing construction of Sanitary Sewer in the alley between South 9t(. and eptaOtb St reet, approvestla"primary asseAtmnnt Board from South rollfora same. The City Civil Engineer reported the completion of contract under Improvement Resolution No. 9.69-1911, providing for the improvement of the alley, between South 17th & 18th Street, from South 'Allto °B" Street, the Board accepts the' same and orders assessment roll prepared, On motion of Mr. Zimmerman, the City Civil Engineer was diTeCt re ed to investigate and report as to the high tension wires ning along the National Road within the City. "..W..,,. The Street was directed to place grave , d 3putl 4 l in the aileY �Lr of L"yin Street, at the approaoheh of South 4th & 5tb Street, Also to sweep North •E" Street roadway & sidewalk, On motion of Mr. Zirvnerrnan the City Attorney was dirActe .d to draw up an agreement wis hereby the F. & I1. Lawrunower C° d to construct& maintain a roadway between their property 9nro• the park aqulred by the city abuttingon a'ashington Avc• p 11ded always that acid F, N, keep uP sald roadway and park, P °O is to maintain & Thursday September 21at,1911• A e )jr. Ztmmerman, moved that the maintalnance of the Horse, suer. as fend and shoeing,for the President of the Board, be paid by the City, motion prevailed. The Board reaelved bids for the improvement of South "r,■ Street by constructing, cement curb, r;utter & sidewalk on 'both 31dea of Street, from South 14th to 15th f,treet, as pr°vlded for oy Imr provement Resolution No, 277-19110 as follows:- " Daniel G. Burkhardt, old: 6 foot cement sidewalk - - $0.64 per lineal ft. Straight curb & gutter - - 0.64 Circle curb & gutter - - 0,70 ■ ■ Alley intersections - - 0.12 °. square is Schneider Bros., bid: 6 foot cement sidewalk - - $0.66 per lineal ft. Curb & gutter Straight - - 0.68 ' Circle curb & gutter - - 0.80 ■ ' ■ Cement roadway alley square ' The bid .of' Daniel G, Burkhardt, being the lowest and within the estimate of the City Civil 3ngineer, the oontract was award- ed to said Daniel G. Burkhardt, The Board receivas bids for the improvement of North 12th Strut by constructing a 6 foot sidewalk on the west side of street from North "I° to "J• Street, as provided for by Improvement Resolution No. 278-1911, as follows: " Schneider Tiros•, bid: $0,72 per lineal ft,, 6 foot cement sidewalk - being the only bid received and The oid of Schneider Bros., dabove irectedPtoestimate if' SchneidertBrosV,lwouldntakEng1eere contractthe nf'or la said improvement at Engineer's estimate• Pursuant to postponement the Board met to take final action Declaratory Resolution No. 75-1911, Providing for the op^.ning of the alley between South •3rd & 4th Street, from South •C° to °D• Street, the Board after having viewed the PrerisC9tOf mat - the alley proposed to be opened and carefully J. I. Schnelle ters referred to by H• U. Johnson, attorney consis* the Board takes thereupon,being 1-ully advised in the, premise without modification, final action on said resolution, confirming, nog orders a list all .former action taken on same.rs of 's and of or roll prepared of all l p°goers ught*toobeetaken oroto be injurfou.— valuable interest th�r.ln, ly affected, which list or roll shall also describe the property beneficially affected. Claims to the amount of .4583.93 were allowsd & ordered paid. The Board did then adjourn, President of Board• Attest: /1/ ll! City Clerk.