Loading...
HomeMy Public PortalAbout01-25-1912 (2)n rlLh, 191�• o11ll ThuredeY JunuerY oV The Board receives bide for the ettimprovement by constructing rcementSt� ■ Str'�et r byL roveme .r• to South rovlded for DY mp nt from Sout•- sides, as p to -wit: - curb & butter on both as follows, Resolution No. 287-1911, Foster, bid'- _ PW n. l ■.' Cement curb & gutter strat51�t - ♦ Circle curb & gutter - • Daniel G. Burkhardt, bid,- - - Straight curb & gutter - Circle cubb & gutter ■ F, F, Slick, bid:- _ Straight curb & gutter - Circle ourb & gutter - $o,52 poor linear fo 0 . g') ■ " $00so pr linear Loot 007.9 ■ • a Thursday January 25th, 1912. I. R. No. 290-1911, bide cor.tlnued. ■ v^ronin & 10 redith, bid: - Cement sidewalk 9 ft. wide - $0.99 yer Lin. foot. ^,emint walk intersections - 0.13 • eq. ■ e Schneider Bros., bid: - Cement sidewalk 9 ft. wide - $1,08 per Lin. foot Cement walk intersections - 12} • sq. ■ The bid of F. L• Slick, being the lowest and within the estinate of the City Civil Lnglneer, the contract was awarded to the said F, Z, Slick. The Board receives bids on the improvement of Southwest 4th Street aational Road to Southwest •E" Street, by grading & graveling ;O.BS. Del 1lnearfc:, from 0.70 • • the roadway, and constructing cement sidewalk 8 ft. wide & cement curb & gutter on both sides thereof, as provided for by Improvement Resolution No. .289-1911, as follows, to -wit:- ■ Schneider Bros., 1)14:- Straight curb & gutter _ =0.65 per linear fa 0.80 • ' Circle curb & gutter - Boots & Gant, bid:- $0955 per linear f. Straight curb & gutter - 0,75 r • • Circle curb & gutte- - • Philip Hipskind-& Sons, bid:- to,88 per linear fo. Straight curb & gutter - 0.70 'o Circle curb & gutter The bid,of H. C. Foster, being the lowest and Fithin the 93: mate of the City Civil Engineer, the contract was awarded to' said H. C. Foster, The Board .receives bids for the improvement of lnain Street,%i constructing cement sidewalk on the south side, from Soutb 11t to South 22nd st, and on the north side from North "1st to 9� Street, as provided for by Improvement Resolution No. 790"1 as follows, to -wit:- • F, E. Slick, bid: - Cement sidewalk 9 ft, wide Cement calk Intersections - ■ Daniel G. Burkhardt, bid: - Cement Sidewalk 9 ft. wide Cement walk intersections _ ■ H. C. Foster, bifl:- Cement sidewalk 9 ft, wide _ Cement walk Intersections _ " Boots & Gant, bid:. Cement sidewalk 9 ft, wide _ Cement walk intersections _ • Philip Hipskind & Sons, b1d:- Cemnnt Sidewalk 9 ft, wide _ Cement walk Intersections _ to,92 per Lin. fool 0,101." sqn. $0.95 per Lin. f� ; 0.12 • egre at $0.97 per Lin. 0.1p u sqre, fool to.99 per e'Qn' 0.1� to 99ar lipear pf 0.11 • sqre • H, C. Foster,. bid: - Street Complete - - =4.09 per Lin, foot • Crdnin & Meredith, bid:- Street Complete - - =4.13 per Lii. foot ■ Nolte x Thompson, bid:- $4,34 per Lin. foot R Street Complete. - - ■ F, F,. Slick, bid:- $4.74 per Lin. foot Street Complete - - ■ Philip Hipskind & Sons, bid:- =8,po per Lin, foot. Street bid Complete plHe C. Foster being the lowest and within the eatinate of the (71ty Civil 1Engineer, the contract wa3 awarded to the said H, C. Foster, j The Board receives olds for the extension of the CasCas'follows�as Provided for by Improvement Resolution No. to -wit:- • Philip Hipskind t Sons, oid:- $14.50 pet Lin.. foot Sewer Complete - - E. Slick, bid:- $17.49 per Lin. foot "ewer Complete - 44 Sons Ast and within the estimate The bid of Phl,llp Hipskind being the low. Of the City Civil Engineer, the contract was awarded to the said Philip Hipskind A Sons. stem west The Board receives bids for the construction of Sewer sY Of Ridge St, & north of Linden Ave.,as rivito-ded for,by Improvement Resolution No..292-1911, as follows, • Philip Hipskind* Sons, bid:-- $1.87 per linear foot Sewer Complete - - 2,30 Is • " 20" 11 • - 2,70 ■ • ■ 60 " 24■ 421, u • _ —