Loading...
HomeMy Public PortalAbout01-25-1912 (3)so •#ft oo� y 25tri, 1912• Thursday January 25th, 19120 Thursday January Did of D. C. Bilrkhardt, continued: Sewer bids, continued: #15 per linear foot Cement Crows -walks 5 ft. widew;0.70 Per linear foot. er, bid:- _ 2• eVit-Brick Cross -walks 5• wide - 0,75 • ■ late _ 2.72 ■ 126$e.Y'•T'Com; g, Schau_ _ 3, 5 „ " ■ Schneider Bros., bid:- .2p„ • ■ - _ 5•25 Cement sidewalk 5 ft, wide - -l0.57 per Lin, foot 24' „11 skind ! Sons, 11 being rth�hP°contracdt weswjtt Cement walk intersections - - 0.12 • sq. 499 • iri.. , - The bid of Philte elp Lhp city Civil Eng Cement Cross -walks 5 f wide - 0.65 ° Lin, in the est saki Philip Hip' of & Sons. Vit-Drick Cross -walks 5ft. wide 1.00 ' ■ Y awarded to improvement of East Main St, • H. C. Foster, bid: - bid bid for the imp 22nd St, as provided for' _ _ Tj7q Board receive' of South 20tri to r,emnnt sidewalk 5 foot wide - - =0.60 per linear foot east line 784-1911, as follows, to -wit: Cement walk intersections 0.12 " square " from the Resolution No. by Improvement Cement Cross -walks 5 ft. wide_ - 0.60 ' linear • Gant, bid:- $0,50 per linear foot Vit-Brick Cross -walks 0,95 • • Boots & gutter 0,60 „ Straight Dement iUBT &„ are yard • Philip Hipskind W Sons, bid:- - curb & gutter Brick 1.95 _ 0,68 uer linear foot Circle Metropplltan " ■ • Cffinent sidewalk 5 ft, wide Paving roadway:- Y + Cement walk intersections - - �:;5 „ linear „ „ Townsend ■, 1.90 " - ■ ■ Harris cement Cross -walks 5 ft. wide- 1. - • Vit-Brick Cross -walks 5 ft, wide 11 ' ' ■ ■ Philip Hipskind! Sons, bid:-- 0 58 per linear foot Y Straight cement curb & gutter - 0.58 " Circle curb & gutter - square yard roadway:- ldetrohol" itan Brick 1.95 • , roa Paving . Townsend 1.92 " Y • " 1.93 " " . Harris . ' • Street railway add 40 " „ Creosoted -Wooden Block - $2.46 sq•yd• Concrete - $1.50 • Cronin & Meredith, bid:- 30.60 per linear foot Cement curb & gutter - - " square yard Paving roadway:- Yetropolltan Brick 2.04 11 " • St."Car work ■ • •2'25 • creosoted Wooden Block 2•94 " Y atils And the Board now enters its preliminary order, desith that said roadway be improved by paving said roadwa, Stj brick in accordance with the plans and specifications, The Board receives bids for the improvement of North O by constructing cement sidewalk on both sides thereof 9re c,3mf3nteofr Ft. Wayne Ave, to North 16th Street, except 'rrhrovided for struction of good quality already exists, as Provided Improvement Resolution No. 280-19119 as follows, Cement5 Boots sidewalk bid: - wide - $0.49 'g per linear ft' Cement walk intersections - 0.12 " square ° Cement cross -walks 5" wide 0.60 " linear ° Vit-Brick cross -walks 5" wide - 0.75 " ■ Cementsidewalk sdt• 5 ft, wide - 0.52 per linear f0+ Cement walk Intersections - Coll • square , cement Cross -walks 5" wide - 0.55 Y linear , Vit-Brick Cross -walks 5" aide - 0,80 " ■ Cement ne sidewalk 5l Go aftt'wlde $0,54 per linear f,ot Cement walk intersections _ 0011 11 square Work done several years ago by trie firm of Boots of the&aGant being the cause for considerable complaint, Mr. a nt aid firm was before the the Board toitby withdrawey the bids Afro Cant submitted by him on the different improvements, request was on motion unanimously given to withdraw said bids. The bid of F. E. Slick being the lowest &best bid recder Improvemeived ent on the improvement of North "C• Street as specified Resolution No, 2.80-1911, and being within the estima te t •Slicko Civil Engineer, the contract was awarded to the The Board did then adjourn, 9 z6 Attest: ?resident or Board. Clerk of Board,