As it has been written elsewhere, the Federal Authorization for the Tybee Island Shore
Protection project expires in 2024, 50 years after the initiation of construction. We have 10 years
to prepare for a new era with a change in the funding and execution of shore protection projects.
It can be said that there are several ways forward towards a continuation of the placement of sand
on the seaward beach on a regular basis. These are:
1. Seek an extension of the existing Federal Renourishment Project through enacting Section
1037 of WRRDA 2014 allows for:
1. "the Secretary shall, at the request of the non-Federal interest, carry out a study to
determine the feasibility of extending the period of nourishment described in
subsection (a) for a period not to exceed 15 additional years beyond the maximum
period described in subsection (a).
This provision would allow for the Local Sponsor(The City of Tybee Island) to request the
Corps to perform another Feasibility Study(similar to the 1989 Section 934 report) to re-verify the
Engineering, Economics and Environmental aspects of the Federal Shore protection project. The
cost of the 1988 Section 934 Report was $2.5 million and took three years to complete. Because
this is a delegated authority to the ASA(CW), no new Congressional Authorization would be
required. It is assumed that the study would be cost shared 50% Federal and 50%non-Federal.-
Timeline: Upon the receipt of a letter from the City of Tybee Island for the study, funds would be
requested from Congress (18 months), a Feasibility Cost Sharing agreement executed(one year),
Study completed (3 years), review and approval (2 years), a total of 7 to 8 years, depending on
funding. End result: a 15 year extension of Federal Authorization to 2039, if approved.
2. Complete the Phase II of the Channel Impacts study, which would provide the Engineering,
Economics and Environmental impacts of the mitigation options to offset the impacts of the
on-going Federal Navigation project, along with a specific recommendation to resolve the
problem
The completed study with a specific recommendation, a project cost estimate and
environmental approvals would have to be reviewed and approved by UQUSACE, OMB,
ASA(CW), etc. and submitted to Congress for a New Congressional Authorization.
The remainder of the study would be cost-shared at 50%Federal and 50%non-Federal, with
the implementation cost of the mitigation feature cost shared to be determined. A possible benefit
to this path is that the project would no longer be justified on Storm Damage Prevention and/or
Recreation,but as a mitigation feature that must be funded as long and the Offshore Channel is
maintained.
Timeline: Revise the Feasibility Cost sharing agreement to include the new Phase 2. Prepare
the Phase 2 report(3 years), obtain approval (one year) and obtain inclusion in a new Water
Resources Development Act (problematic).
3. Go it alone. Beginning 2015,work to obtain State and Local funding for a 2025
Renourishment. Similar to Hilton Head, funds could come from GPA, GaDNR, Ga DOT,
Chatham County. The City of Tybee Island would be responsible for obtaining all
environmental approval and government coordination. Sand could be placed where ever
the City wanted with no regard to the "Federal"template,but still subject to Federal and
State environmental permits.
4. FEMA has a program to reduce the flood insurance rates if homes were raised to provide
additional "freeboard"to prevent the first floor from flooding during a storm event. If
freeboard is provided to homes, it may provide for a reduction in Federal Flood Insurance
Program Insurance premiums. However, since the existing Federal project is mostly
justified based on the Storm Damages prevented, raising the first floor will reduce some the
project benefits to any future Federal project not justified on Mitigation from the Channel
Impacts.
Page 2
It is a recommendation of the Tybee Island Beach Task Force that a meeting should be held this
fall to fully explore each of these, and other options to map out the best way forward for the beach
at Tybee Island.
All stakeholders should be invited to participate at the Federal, state and local levels to fully
explore each of these options, with the benefits, risks and uncertainties of each option. 2024 is just
around the corner.
Page 3
ACKNOWLEDGEMENTS
Ms. Berta Adams,Tybee Island Beach Task Force
Dr. Clark Alexander, Skidaway Institute of Oceanography and Georgia Southern University Ms. Deb
Barreiro, Georgia Department of Natural Resources, Coastal Resources Division Mr. Bart Brophy,
Living Independence for Everyone (LIFE) Inc.
Mr.Jimmy Brown, City of Tybee Island,Tybee Island Emergency Management
Mr. Karl Burgess, Georgia Department of Natural Resources
Major Chris Case, City of Tybee Island Police Department
Ms. Elizabeth Cheney, Georgia Department of Natural Resources, Coastal Resources Division Mr. Spencer
Davis, U.S. Army Corps of Engineers
Mr. Paul DeVivo, DeVivo Marketing
Mr. Brad Gane, Georgia Department of Natural Resources, Coastal Resources Division Mr.Alan
Garrett, US Army Corps of Engineers (Retired)
Mr. Mike Gleaton, Georgia Department of Community Affairs
Mr. Mike Harris, Georgia Department of Natural Resources, Wildlife Resources Division Ms. Mary
Hogan, City of Tybee Island Finance Director
Mr. Bubba Hughes, City of Tybee Island Attorney
Mr.Jonathan Lynn, City of Tybee Zoning and Planning Manager
Ms.Jan MacKinnon, Georgia Department of Natural Resources, Coastal Resources Division Mr. Pat
Monahan, Chatham County, Assistant County Manager
Mr. Burt Moore, Savannah District Corp of Engineers Ms. Hope
Moorer, Georgia Ports Authority
Page 4
Mr. Lou Off,Tybee Island Beach Task Force Olsen &
Associates
Mr. Daniel L. Parrott, U.S. Army Corps of Engineers (Retired)
Mr.James W. Price,Tybee Island Police Chief Mr. Daniel Parrott, U.S. Army Corps of Engineers (Retired)
Mr. Pete Ryerson,Tybee Island Parking Services (Retired)
Mr. Clifton "Skip" Sasser,Tybee Island Fire Chief(Retired)
Ms. Diane Schleicher, City of Tybee Island City Manager
Mr. Clayton Scott, Chatham Emergency Management Agency
Ms. Susan Shipman, Georgia Department of Natural Resources, Coastal Resources Division (Retired)
Ms.Jennifer Spivey, Georgia Environmental Facilities Authority
Ms.Ann Thran, Georgia Department of Natural Resources, Coastal Resources Division Ms. Fran
Todd, Living Independence for Everyone LIFE Inc.
Ms. Lawanna Tsolous,Tybee Island Ecotourism Council Mr.John Walden, Georgia Department of Natural
Resources (Retired)
Ms. Kathryn Williams,Tybee Island City Council and Tybee Island Beatification Mr.Joe
Wilson, City of Tybee, Department of Public Works Director
Mr. Brad Winn, Georgia Department of Natural Resources, Wildlife Resources Division Mr. Paul
Wolff,Tybee Island City Council
Ms. Vivian Woods, City of Tybee Island Clerk of Council
Mr. Spud Woodward, Georgia Department of Natural Resources, Coastal Resources Division The
sources of funding for this project are The Coastal Management Program of the Georgia Department of
Natural Resources and The U.S. Department of Commerce, National Oceanic and Atmospheric
Administration. And, of course, all the private citizens of Tybee Island who attended the public
meetings and gave their comments and recommendations!
Page 5
LITERATURE CITED AND SUPPORTING DOCUMENTS
A Guide to a Georgia Barrier Island,Taylor Schoettle, 1996. Watermarks Publishing, St. Simons Island,
Georgia.
Beach Long Range Management Plan by Erik Olsen. This provides lots of info on the beach and
monitoring, projects,funding.
Chatham County Hurricane Plan, revised August 2004. Chatham Emergency Management Agency.
Found online at:
http://www.chathamemergency.org/Documents/EOP%201ncident%20Annex%20A%20Hurricane%201ncide
nt%20Management%20REV0709.pdf
City-Data.Com, 2005. http://www.city-data.com/city/Tybee-Island-Georgia.html. City of
Tybee Island, 2005. http://www.cityoftybee.org/code.
Comprehensive Plan for Tybee Island Georgia, 1992, and short-term work update of 1998, as
submitted to the Georgia Department of Community Affairs.
Limited Reevaluation Report,Tybee Island, Georgia, 2007 Re-nourishment, August 2005, US Army
Corps of Engineers Savannah District
North Beach berm construction permits from DNR. Spells out requirements from DNR that the City must
follow.
Page 6
Project Cooperation Agreement between the Department of the Army and the City of Tybee Island
regarding each re-nourishment funding.
Sherpa Guides, Lenz Design. 2005.
http://www.sherpaguides.com/georgia/coast/northern coast/tybee fort screven north midbeach
.html#Lighthouse.
State of Georgia ADA Coordinator's Office, 2005. http://www.ganet.org/gsfic/ada/overview.shtml.
Tybee Island Fire Department Ocean Rescue Division, Standard Operating Procedure Manual
Tybee Island, Georgia, Shoreline Protection Project, Operations, Maintenance, Replacement, Repair, and
Rehabilitation Manual, May 2002. U.S. Army Corps of Engineers, Savannah District.
Tybee Issues, 2002. http://www.tybeetyme.com/ti/tybee_beaches_lou_off.htm.
Tybee Island South Beach Business District Design Charrette. Prepared by HDR,January 2005.
Tybee Island Traffic& Parking Study. prepared by HDR Engineering, Inc. Atlanta,GA,January 2005.
View of Tybee from the Lighthouse, 2004, Application for Urban & Community Forestry Financial
Assistance Program.
Virginia Beach Management Plan, April, 2002, Beaches and Waterways Advisory Commission.
Page 7
Page 8