Loading...
HomeMy Public PortalAbout08-19-1912_fioe of Beard of Public Works, City of P.ichmond, India s, Thursday August 15t11,1912. The Board of Public Works of the Clold ity oof Richmortu,d on Indiana, met In reiular session at the offAll-thesaidFm� bars Ofsaid 1912, at 9 ifelbek A• ,oiil Cnarle3 Z11"LRArman, August 15th9 resent, liessrs, Kenna} , Board being i roceedings 'i7ele nad, to-ti+it:- the following P c s presement side'.v,il Ks 3i n etiti�n Raented., far constructing side of North wide on souE Street, from North 13th to 15t1: for ,lans for Street, referred to 5ngineer The City Civil Ingir1e°r was directed to prepare flans euzQ s.•,u<- ,.ica;;e- for the constriction of Ce'sunn Street: Also cement sidewalks on both isiue- of rt. 'Wayne Ave, from Main to North walks on :`orth 8th Street, both sides from l.iain to 1lorth "F" St, where not already eon3tzucted'. primary assessment roll for the improverr.r.: 4he Board approved 8 of South 164,I ^,treat, by constructing cement si 1er!aliC3 &curb gutters, as provided for by Improvement Resolution `10. 299-191C. mbe Board approved a primary assessment roll for the conetruc,i �n of Dement si( 5' ,vide on both ^ides of North llth Street, ^rom North "u" La Worth "J" Street, as provided for by Improve ment Pesolution No. 311-1912. The Board approved a primary assessment roll in the :.'latter of the imprcverient Of South "C" "treat, from South 1 5th' to 16th Street, by grading, graveling the roadway and constructing cement curb, utters & sidewalks B' wide on both sides the points named as orivided for by Impovemm t Resolution ',o. B22-1912. Thi Bo4id approved a primary assessment roll for the construe` " of eemert roadway in tha 1st alley north of Main Street, irol. ;Borth 13th to 19th Street, as provided for by Improvement ResOi- ution ido. 321-1912. The Board approved a primary assessnent roll i'or the constlroID uct ion of cement curb & gutter on south oide of Main Street, South 22nd to South 23rd Streit, ae provided for by Improvement Resolution No.•329-1912. :he Board a.)l,rovsd a primary assessment roll for the construol�� of cen^nt s`idewsjka on both sides of Ft. Wayne Ave, from Lot f to north line of North "F" St, as provided. for by Imps gem nt Resolution No. 327-1912. The City Civil Engineer report-d the completion of contract'r,�r Improvement Resolution No..326-1912 for LhA construction of Sanitary Sdwer in alley between South -,,i.t 4th St, from SOu pad. "^," to ■D" Street, same was accepted and as3e331nent roll orde The Board did then adjourn' �' / President o1' Romer. Office of Board of Public Works, 201 City of Richmond, Indiana, Monday August 19th,1912. The Board of Public Works of the City of Richmond, Indiana, met in re;ular session at the office of said Board on aonday August 19th, 1912, at 9 O'clock A, 119 The following members being present, liessrs, Charles and Zilmnerman, Absent Ur, Kennepohl, two :members being present the following proceedings were had, to —wit: — Mr. D. Lic?fanus. appeared before the Board stating that Laurel Street, host Sheridan to West 1st Street, had just recently been i)aproved by constructing cement curb, gutOr & sidewalks, and that the street should be macadamised, On motion of Ur. Zimmerman Mr. tic!Ganus was instructed to see that property owners: have taps connected with their lots & properties on said atreet, and if city has money the street be macadamized if taps are :made, so ordered. The Board approved a pririary assessment rol:t in the matter of construction of sanitary sewer in the alley between South 3rd and 4th Street, frolft South "C" to "D" Street, as provided for by Improvement Resolution No. 326-1912. The City Civil Engineer reported the completion of contract under Im roveme rt Resolution ]bo. 289-1911, for the construct - of Ftn WaynemAve,stoP}North 16th Street,als on both ssameNwashaccepted and tion Street,Zro. assessment roll ordered. The City Civil Engineer reported the completion of contract under Improve:ent Resolution No. 298-191:1 for the construct- ion of cement sidewalks on both sides of train Street, from Bourth Street to llth Street. A complaint was received from P.C.C.& St L. RY CO., in regard to catch basin on North "E" Street, at Depot, referred to the City Civil Engineer. The Board did they, adjourn, Presideni Attest: Clerk of Board.