HomeMy Public PortalAboutr 18-087Yttsolutt of thie c3 orough of &rterd, N- � c
No. 18 -87
Date of Adoption 19, 2018
AUTHORIZING A PROFESSIONAL ENGINEERING AND SURVEYING SERVICES
CONTRACT WITH CME ASSOCIATES, FEE ESTIMATE FOR THE
NJDOT FY 2017 LOCAL FREIGHT IMPACT FUND
IMPROVEMENTS TO PETER J. SICA INDUSTRIAL
HIGHWAY/MIDDLESEX AVENUE
WHEREAS, the Borough of Carteret is in need of specialized engineering and surveying
services in connection with the NJDOT Fiscal Year 2017 Local Freight Impact Fund Grant
Program with regard to Improvements to Peter J. Sica Industrial Highway /Middlesex Avenue;
and
WHEREAS, CME Associates, 1460 Route 9 South, Howell, New Jersey 07731, possesses the
requisite experience and expertise to provide said services; and
WHEREAS, CME Associates has submitted a proposal to provide said services at a total cost
not to exceed $245,000.00; and
WHEREAS, the Mayor and the Council have reviewed said proposal; and
WHEREAS, the Chief Financial Officer has certified that funds are or will be available for said
purpose. Acct. # C- 04-18- 101 -202
NOW, THEREFORE, BE IT RESOLVED by the Mayor and the Council of the Borough of
Carteret, County of Middlesex, State of New Jersey, as follows:
1. The proposal from CME Associates for engineering services related to the
NJDOT FY 2017 Local Freight Impact Fund Grant Program with regard to
Improvements to Peter J. Sica Industrial Highway /Middlesex Avenue at a cost not
to exceed $245,000.00 is hereby approved.
2. This action is approved as an award of a professional services contract pursuant to
N.J.S.A 40A:11- 5(1)(a) in accordance with the Borough's Fair and Open Process
as authorized by law.
3. A copy of this Resolution be forwarded to the Borough's Purchasing Department,
the Borough Director of Engineering and CME Associates.
Adopted this 19" day of April, 2018
and certified as a true copy of the
original on April 20, 2018,
KATHLEEN M. BARNEY, MMC
Municipal Clerk
RECORD OF COUNCIL VOTE
�
COUNCILMAN
YES
NO
NV
A.B.
COUNCILMAN
YES
NO
NV
A.B.
BELLINO
X
JO HAL
X
D
X
KRUM
X
DIMASQ10
X
NAPLES
X
X - Indicate Vote AB - Absent NV - Not Voting XOR - Indicates Vote to Overrule Veto
Adopted at a meeting of the Municipal Council
April
19, 2018
L RK
�
418925 Borough of Carteret
r
KM
OFFICE OF
HATHLEEN M. BARNEY, RMC /CMC
MUNICIPAL CLERK
11:25:34 a.m. 04 -19 -2018 112
Poron of &rfrref
MIDDLESEX COUNTY
TEL (732) 541.3800
FAX (732) 541 -8925
61 COOI{E AVENUE
CARTERET, NEW JERSEY 07008
Date: Aril 19 2018
To: Patrick DeBlasio
Treasurer
Borough of Carteret
REQUEST F R CERTIFIC ON OF AVAILABLE FUNDS
For: AUTHQRIZING A ENGINEERING AND SURVEYINCr SERVICES CONTRACT WITH
CME ASSOCIATES FEE ESTIMATE FOR THE NJDOT LOC AL FREIGHT IMPACT FUND
Name of Account: RESOLUTION #18-
AMOUNT TO BE ENCUMBERED: TOTAL COST NOT TO EXCEED $245,000.00 BILLABLE WITH
ASSOCIATES EXISTING CONTRACT WITH THE BOROUGH
KATHLEEN M. H ARNtt, MMC
Municipal Clerk
CERTIFICATION OF AVAILABILITY OF FUNDS
I, Treasurer of the Borough of Carteret, do hereby certify that there are sufficient funds available in the current
budget to enable the Municipal Council to authorize the entering into a Contract between the Borough of Carteret
and, '366 OF C,y��
The funds available for this contract are in the Budget, in the account of
9�n 8 -nr C °`t la log - � MAY 1 b 2018
In the amount of:
S ov
By this certification, I have hereby encumbered the above named account for the amount of the contract pending
Council action,
Patrickbefflasio
Date•
/a /! i3 Treasurer
Hand Delivered and Via Electronic Mail (d upontj(oD - carteret.net
Borough of Carteret
Municipal Building n y,
61 Cooke Avenue
Carteret, NJ 07008
Attn: John DuPont, PE, PP, CME - Director of Municipal Engineering
Re: Fee Estimate for Professional Engineering and Surveying Services for
NJDOT FY2017 LFIF Grant Program
Improvements to Peter J. Sica Industrial Highway /Middlesex Avenue
Borough of Carteret, Middlesex County, NJ
Proposal No. 2018 -046
Dear John:
We are pleased to present our estimate of fees for professional engineering services for the above -
referenced project.
We understand that the Borough has long sought additional funding to effectuate improvements to
Peter J. Sica Industrial Highway /Middlesex Avenue whichis in a deteriorated condition due to heavy
commercial traffic associated with the millions of square feet of warehouse and distribution space in
the Borough.
In accordance with our general authorization, our office conducted a traffic and speed study along
the roadway in support of the Borough's application to the NJDOT's Local Freight Impact Fund
(LFIF). The purpose of the LFIF program is to provide assistance to municipalities whose roadways
are affected by heavy truck traffic associated with warehouses, shipping, and port terminals. This
study concluded that of the 15,100 vehicle daily traffic count, approximately 44% of these vehicles
consisted of commercial trucks, far surpassing the minimum 5% truck traffic minimum for grant
eligibility.
In December 2017, our office prepared a scope of work, cost estimate, and grant application to the
LFIF for necessary improvements to Industrial Highway and Middlesex Avenue. The preliminary
construction estimate for the reconstruction and resurfacing of the roadway as submitted to the
NJDOT was approximately $6,365,300.
At this time, it is anticipated that the Borough may receive a grant award in the amount of
approximately $2,000,000. Accordingly, CME Associates has prepared a scope of work to best
utilize this funding to maximize improvements to the roadway. As discussed, we anticipate the scope
of this proposal to include survey and basemapping for Industrial Highway from Drift Way to Lower
Roosevelt Avenue. The scope of design phase, bid phase, and construction administration phase
services will be limited to improvements from Drift Way to Upper Roosevelt Avenue.
&kCarter Wroposals12016 -046 LFIF Grant Industrial Ave.docx.doc
CONSULTING AND MUNICIPAL ENGINEERS
1460 ROUTE 9 SOUTH • HOWELL, NEW JERSEY 07731 . (732) 462 -7400 9 FAX: (732) 409 -0756
JOHN H.ALLGAIR, PE, PP, LS (19832001)
DAVID J. SAMUEL, PE, PP, CME
JOHN J. STEFANI, PE, LS, PP, CME
-.Ruwmnw�-
JAY B. CORNELL, PE, PP, CME
MICHAEL J. McCLELLAND, PE, PP, CME
GREGORY R. VALES[, PE, PP, CME
TIMOTHY W. GILLEN, PE, PP, CME
BRUCE M. KOCH, PE, PP, CME
���
LOUIS J. PLOSKONKA, PE, CME
ASSOCIATES
TREVOR J. TAYLOR, PE, PP, CME
BEHRAM TURAN, PE, LSRP
LAURA J. NEUMANN, PE, PP
April 16 2018
DOUGLAS ROHMEYER, PE, CFM, CME
ROBERT J. RUSSO, PE, PP, CM E
Hand Delivered and Via Electronic Mail (d upontj(oD - carteret.net
Borough of Carteret
Municipal Building n y,
61 Cooke Avenue
Carteret, NJ 07008
Attn: John DuPont, PE, PP, CME - Director of Municipal Engineering
Re: Fee Estimate for Professional Engineering and Surveying Services for
NJDOT FY2017 LFIF Grant Program
Improvements to Peter J. Sica Industrial Highway /Middlesex Avenue
Borough of Carteret, Middlesex County, NJ
Proposal No. 2018 -046
Dear John:
We are pleased to present our estimate of fees for professional engineering services for the above -
referenced project.
We understand that the Borough has long sought additional funding to effectuate improvements to
Peter J. Sica Industrial Highway /Middlesex Avenue whichis in a deteriorated condition due to heavy
commercial traffic associated with the millions of square feet of warehouse and distribution space in
the Borough.
In accordance with our general authorization, our office conducted a traffic and speed study along
the roadway in support of the Borough's application to the NJDOT's Local Freight Impact Fund
(LFIF). The purpose of the LFIF program is to provide assistance to municipalities whose roadways
are affected by heavy truck traffic associated with warehouses, shipping, and port terminals. This
study concluded that of the 15,100 vehicle daily traffic count, approximately 44% of these vehicles
consisted of commercial trucks, far surpassing the minimum 5% truck traffic minimum for grant
eligibility.
In December 2017, our office prepared a scope of work, cost estimate, and grant application to the
LFIF for necessary improvements to Industrial Highway and Middlesex Avenue. The preliminary
construction estimate for the reconstruction and resurfacing of the roadway as submitted to the
NJDOT was approximately $6,365,300.
At this time, it is anticipated that the Borough may receive a grant award in the amount of
approximately $2,000,000. Accordingly, CME Associates has prepared a scope of work to best
utilize this funding to maximize improvements to the roadway. As discussed, we anticipate the scope
of this proposal to include survey and basemapping for Industrial Highway from Drift Way to Lower
Roosevelt Avenue. The scope of design phase, bid phase, and construction administration phase
services will be limited to improvements from Drift Way to Upper Roosevelt Avenue.
&kCarter Wroposals12016 -046 LFIF Grant Industrial Ave.docx.doc
CONSULTING AND MUNICIPAL ENGINEERS
1460 ROUTE 9 SOUTH • HOWELL, NEW JERSEY 07731 . (732) 462 -7400 9 FAX: (732) 409 -0756
ASSOCIATES
Borough of Carteret, Middlesex County, New Jersey April 12, 2018
Re: Proposal for Professional Engineering and Surveying Services Proposal No. 2018 -046
Improvements to Industrial Highway and Middlesex Avenue Page 2
The improvements will include the following:
• A combination of mill & overlay or full reconstruction as needed of the existing roadways;
• Concrete curb removal and replacement where required to improve drainage;
• Driveway apron, sidewalk, and handicap ramp reconstruction where required
• Installation of sidewalk in designated areas;
• Miscellaneous drainage repairs including installation of bicycle safe grates and 'ECO'
castings in accordance with NJDEP Stormwater Regulations and culvert reconstruction.
• Guide Rail replacement; and,
• Traffic Striping and Signage
With this being said, we anticipate that the following tasks will be required:
A) Survey and Base Map Phase Services — We will prepare a base map to be utilized during the
design phase services for Industrial Highway between Drift Way and Lower Roosevelt Avenue
(CR604). The base map will include Geographic Information System (GIS) mapping along with
supplemental information, as necessary, to prepare construction plans. The supplemental
information will use NAD83 horizontal and NAVD 88 vertical datum and will include:
1. Top of curb and gutter grades;
2. Roadway centerline grades;
3. Location of existing physical features;
4. Areas of proposed drainage repairs, as needed; and
5. Driveway aprons and handicap ramp locations.
B) Design Phase Services — This work will consist of the preparation of construction plans and
quantities. The project limits associated with this work will be from Drift Way to Upper Roosevelt
Avenue. The services have been divided into tasks as detailed below:
1. Perform site visits and collect existing site information and assess conditions;
2. Coordinate with utility companies for possible upgrades;
3. Prepare Construction Plans, including:
i. Legend and Baseline tie Plans;
ii. Construction Plans, Profiles, and Cross Sections
iii. Culvert Reconstruction Plan, Profile, and Cross Sections
iv. Striping and Signage Plans
SACarteret\Proposals12018 -046 LFIF Grant Industrial Ave.docx.doc
ASSOCIATES
Borough of Carteret, Middlesex County, New Jersey April 12, 2018
Re: Proposal for Professional Engineering and Surveying Services Proposal No. 2018 -046
Improvements to Industrial Highway and Middlesex Avenue Page 3
V. Soil Erosion and Sediment Control Plans and Details
vi. Traffic Control Plans
vii. Construction Details
4. Prepare Specifications in accordance with NJDOT and Borough standards;
5. Prepare Construction Cost Estimate; and,
6. Submit plans and specifications to NJDOT for review and authorization to bid.
C) Permit Phase Services — This work will include the preparation and submission of permit
applications to outside agencies for review and approval. The roadway work will require
coordination with the NJDOT Local Aid Office, Middlesex County Engineering, and the Freehold
Soil Conservation District. Additionally, the subject culvert is within an area of tidal influence,
and as a result, both the NJ Department of Environmental Protection ( NJDEP) and the US Army
Corps of Engineers (ACOE) have co- regulatory authority over the work. Each of the regulatory
requirements are discussed below.
1. NJDEP Division of Land Use Regulation — The NJDEP regulates the construction under
the Rules on Coastal Zone Management, Waterfront Development Law (as found within
NJAC 7:7 -2.4) and the Freshwater Wetlands Protection Act Rules (as found at NJAC
7:7A- 5.10). The culvert replacement will require an approval for an In- water, Waterfront
Development Permit, and for Statewide General Permit #10 which will involve the
submission of the following:
NJDEP Permit Plan, showing the limits of freshwater wetlands, the elevation of
mean low water, mean high water and the spring high water line, and impact to
wetlands and waters areas.
ii. Details on the proposed construction within Compliance Reports for both sets of
regulations.
iii. Data sheets to substantiate how the wetlands boundary was established
iv. Site Photographs
V. Proof of Public Notice via certified mail to inform property owners within 200 ft of
the site, and to County and Borough offices informing them of the submitted
application.
Although the pipe replacement is within a NJDEP — regulated tidal flood hazard area, it will
not require the submission of a separate permit under the Flood Hazard Control Act
Rules (as found at NJAC 7:13), but we will need to address the applicable portions of the
rules within the Waterfront Development Compliance Statement. NJDEP usually takes
between six and eight months to review and approve this type of application.
SACarteretTroposals\2018 -046 LFIF Grant Industrial Ave.domdoc
ASSOCIATES
Borough of Carteret, Middlesex County, New Jersey April 12, 2018
Re: Proposal for Professional Engineering and Surveying Services Proposal No. 2018 -046
Improvements to Industrial Highway and Middlesex Avenue Page 4
US Army Corps of Engineers — The pipe replacement will require an approval form the
ACOE under Section 10 of the Harbors and Rivers Act and for Section 404 of the Clean
Water Act. The ACOE requires a similar application package as the NJDEP, but notifies
adjoining property owners, the US Fish and Wildlife Service and the National Marine
Fisheries Service as part of their public notice process. The ACOE will issue their
permits after the NJDEP issues the Waterfront Development Permit. We will be in regular
contact with the reviewers to assure the permits are issued in a timely manner.
3. Freehold Soil Conservation District (FSCD) — As the project involves the disturbance of
more than 5,000 square feet of soil, our office will prepare an application to FSCD as well
as obtain a Construction Stormwater Permit from the NJDEP.
4. NJDOT Local Aid District III — As the project will be the recipient of NJDOT funding, our
office will coordinate with the NJDOT Local Aid office to receive authorization to bid the
project, review pre- construction and post- construction submissions and process payment
vouchers to ensure the project is carried out within the requirements of the funding body.
5. Middlesex County Office of Engineering — The scope of the project includes
improvements to the one intersection of Industrial highway and Roosevelt Avenue
(CR602). Plans will be submitted to the County for review and approval related to
pavement resurfacing, striping, and ADA ramp reconstruction. County road opening
permits shall be the responsibility of the Contractor to obtain.
D) Bid Phase Services — Work in this phase will provide the following services to publicly bid the
project in accordance with the Local Public Contracts Law:
1. Provide bid documents to prospective bidders as needed;
2. Answer prospective bidder's requests for information;
3. Provide addenda for clarification of project specifications;
4. Attend bid opening; and,
5. Analyze responsible bids and recommend contract award
SACarterel\ProposalsQ018 -046 LFIF Grant Industrial Ave.docx.doc
ASSOCIATES
Borough of Carteret, Middlesex County, New Jersey April 12, 2018
Re: Proposal for Professional Engineering and Surveying Services Proposal No. 2018 -046
Improvements to Industrial Highway and Middlesex Avenue Page 5
E) Construction Phase Services — Generally, we prefer to quote services for construction phase
upon the completion of the Bid Phase as the ultimate cost for our services will depend upon a
number of factors including the final design, the contractor to whom the contract is awarded
and the desired level of construction observation required. The following services will be
provided under this phase:
1. Contract preparation including review of bonds, insurance certificates, and project
manning reports;
2. Attend preconstruction meeting;
3. Provide assistance with interpretation of the contract documents;
4. Review shop drawings for site - related items;
5. Provide daily construction observation services and prepare contractor punch lists; and,
6. Review and approve monthly progress pay estimates
We would recommend that the fee outlined below be budgeted for this purpose. Should the
final design and other contract factors preclude CME from being able to properly administer the
project within this budget, we will inform you immediately.
We will provide the necessary engineering services as described above based upon the cost
breakdown as noted below:
A. Survey and Base Map Phase Services .... ............................... 00.00
C. Design Phase Services ......... ............................... .....................$85,0
D. Permit Phase Services ......... ............................... .....................$24,0
E. Bid Phase Services ................ ............................... ......................$
F. Construction Phase Services (Budget) .........
Total Estimated Fee for Services ..................
Exceptions:
..................$100,000.00 --------
..................$258000 00
r
• Environmental investigation and LSRP services associated with the \isposal cif contamina ed,
regulated, or hazardous materials encountered during construction are i Q included.
• Any work not specified as listed in the above phases shall be considered additional services and
will be invoiced at the time said work is authorized by the Borough.
• Application fees are considered extra and will be requested at time of submission.
SACarteret1Prop0sa1s\2016 -046 LFIF Grant Industrial Ave.docx.doc
Ad Number: 0002936416 Run Dates: 05/23/18
BOROUGH OF CARTERET
NOTICE OF CONTRACT AWARD
The Borough of Carteret has awarded a contract without competi-
tive bidding as a Professional Service pursuant to N.J.S.A. 40A:1 1-
5(1)(a). This contract and the resolution authorizing it are available
for public inspection in the Office of the Municipal Clerk.
This action is approved as an award of Professional Services Con-
tract pursuant to N.J.S.A.40A:11- 5(1)(a) in accordance with the Bor-
ough's Fair and Open Process as authorized by law.
Awarded to: CME Associates
j 1 CUib
Services: Specialized Engineering and Surveying Services in
connection with the NJDOT Fiscal Year 2017 Local Freight
Impact Fund Improvements to Peter J. Sica Industrial
Highway /Middlesex Avenue
Resolution: #18 -87
Cost: Not to exceed $245,000.00 billable in accordance with the
existing contract.
Kathleen M. Barney, RMC /MMC
($20.24) Municipal Clerk
002936416 -01
AFFIDAVIT OF PUBLICATION
The following is a true copy of an Ordinance or Resolution of
the Borough of Carteret that has appeared in the Home News
Tribune, a newspaper which is printed in Freehold, New
Jersey and published in Neptune, in said County and State and
of general circulation in said county. One 1 time once in
each issue as follows:
May 23, 2018
No ary Public otNew ey
CARMELA POGORZELSKI
NOTARY PUBLIC OF NEW JERSEY
MY Commission Expires 9/27/2022
Sworn and su scribed before
me this ay of Wad I
X 4 a , e, 0�. ZZ ?, �' e I
athleen M. Barney, MM
Municipal Clerk
BOROUGH OF CARTERET
NOTICE OF CONTRACT AWARD
The Borough of Carteret has awarded a contract without comppeeti-
Uve biddingg as a Professlanal Service pursuant to N-I.S.A. 4 1 A"
5(1)(a), Thh contra? and the resolution authorizing h are .:1A
vailable
for public lnspectioo In the Office of the Municipal Clerk.
This a ?ion is approved as an award of Professional Services Con-
tract Pursuant to NJ.S.A. 40A:11- 5(1)(a) In accordance with the Bor-
ough s Fair and Open Process as authorized by law.
Awarded to: CME Associates
Services: Specialized Englneering and Surveying Services in
connection with the NJDOT Fhcal Year 2017 Local Freight
Impact Fund improvements to Peter J. Sica Industrial
Highwayy/Middlesex Avenue
Resolution: #18-67
Cost: Not to exceed $245,000.00 billable In accordance with the
existing contract
Kathleen M. Barney, RMC/MMC
(S20.24) Municipal Clerk