HomeMy Public PortalAbout4.6 - CDD - PWDEPARTMENT SUMMARY
PUBLIC WORKS
Program 71: Administration and Engineering
Maintai n City inf rastructure.
Program72: Street Cleaning
Street sweeping and cleaning services.
Program 73: Traffic Signal Maintenance
Maint ai n and operate t ra ffic signals .
Program 74: Traffic Signs and Striping Maint.
Maintain and replace signs and street marking.
Program75: Street Mai~tenance.
Re pa ir and res urface pu f>l ic streets/alle ys.
Program 76: Sidewalk Maintenance
Mainta in/re pair public sidewal ks.
Program77: Solid Waste Management
Trash and recycling pick-up and programs.
Program 78: Street lighting
Maint. and utility p rovision for street light s.
r--:-=='-='-'-'-~==..!.!.~=c:...:..;"-"'=='---------, FV 2013-14: Pro osed Reso urces Allocated
8,690
45%
RESOURCES ALLOCATED
Perso nnel Costs
Operat ing Exp enses
PROGRAM FINANCING
Genera l Fund
Gas Tax
Landsc ape & Li gh ting District
Traffic Congestion Relief Fund
Se w er Reconstruction Fu nd
SB821
Used Oil Grant
• General Fund
•Gas Tax
• Landscape Lighting
District
•sewer
Reconstruction Fu nd
• Used Oi l Grant
ACTUAL
2011-12
94,0SO
763,8S4
Total: $ 857,904
97,314
361,955
385,124
-
-
-
13,511
Total: $ 8 57,904
175
180,125
13%
• Personnel Costs
• Operating Expenses
87%
ADOPTED ESTIMATED PROPOSED PROPOSED
2012-13 2012-13 2013-14 2014-15
109,830 109,830 180,125 186,980
1339,325 881,585 1,254,690 1,294,930
$ 1,449155 $ 991,415 $ 1,434,815 $ 1,481,910
205,870 204,920
718,165 315,465
506,430 462,130
--
10,000 -
--
8,690 8,900
$ 1449155 $ 991,415 $ 1,434,815 $ 1,481,910
(This page intentionally left blank)
176
COMMUNITY DEVELOPMENT
Program: Administration & Engineering
Account: 21~960-71
STATEMENT OF PURPOSE
The Administration & Engineering program provides the personnel and technical resources to maintain and improve the City's
physical infrastructure.
STAFFING SUMMARY
Community Dev Director 1/
Community Dev Manager 1/
Receptionist
Public Safety Officer 1/
Secretary-Pub Works
Public Safety & Services Manager
Management Analyst
FUNDING SOURCES
Gas Tax 2107.5
General Fund
KEY PROGRAM GOALS
1. Administer all infrastructure engineering and maintenance services including the Capital Improvement Program.
2. Continue to administer and implement NPDES (National Pollutant Discharge Elimination System) program.
3. Continue to monitor and reduce TMDLs (Total Maximum Daily Loads) of storm drain pollutants.
4. Develop Downtown Parking Master_ Plan and Citywide Traffic Calming Master Plan.
PROPOSED PROPOSED
KEY WORKLOAD MEASURES
Staff attendance at the San Gabriel Valley Council of Governments Public Works Technical Advisory Committee.
Staff attendance at NPDES training (10-15 staff members each time).
Administer NPDES consultant contract.
Develop Five Year Capital Improvement Program.
Adopt Downtown Parking and Citywide Traffic Calming Plans. 4/
FOOTNOTES:
1/ Reorganization and additional staff/duties allocation .
2/ Elimination of position.
3/ Secretary vacation coverage.
4/ Project completion carryover to 2012-13 due to delays from windstorm.
177
2013-14 2014-15
12
1
1
2
12
1
1
1
2
EXPENDITURE DETAIL
ACTUAL
PERSONNEL 2011-12
ACCT.
4117 Community Dev Director 19,333
4118 Commun ity Dev Manager 4,347
4116 Receptioni st -
4132 Public Safety Officer 8,126
4135 Public Safety & Services Manager -
4130 Secretary-Pub Works 10,440
4174 Man agement Ana lys t -
4161 Part Time -
4190 Allocated Be n e fits 12,853
Total: $ 55,099 $
ACTUAL
OPERATING EXPENSES 2011-12
ACCT.
4215 LA CO-Genera l Services 340
4239 Engineering Services 4,539
4277 NPDES 51,870
4310 Optional Benefits Program -
4320 Health Insurance -
4340 PERS Retirement -
4350 Medicare Tax -
4360 Other In surance -
4410 Meeting Expense 10
4420 Fares & Subsis tence -
4425 Members hips/Subscriptions 75
4440 Telephone -
4465 Specia l Dept Suppli es 128
4490 Tr ain in g 4,135
Total: $ 61,097 $
ACCOUNT MODIFICATIONS
ADOPTED
2012-13
19,670
-
8,220
8,600
-
11,250
-
30,160
-
77,900
ADOPTED
2012-13
500
50,000
57,000
535
7,490
10,985
730
1,530
so
3,000
230
720
700
500
133,970
COMMUNITY DEVELOPMENT
Program: Adm inistration & Eng ineering
Acco u nt: 21-960-71
ESTIMATED PROPOSED PROPOSED
2012-13 2013-14 2014-15
19,670 26,7 55 27,280
-
8,220 8,665 9,190
8,600 9,125 9,680
-10,450 11,080
11,250 15 ,085 15,380
-4 ,255 4,510
30,160 3 8,450 39,470
-
$ 77,900 $ 112,785 $ 116,590
ESTIMATED PROPOSED PROPOSED
2012-13 2013-14 2014-15
500
50,000
500 500 I
50,000 50,000
59,000 64,700 64,700
535 780 780
7,490 12,010 13,365
10,98 5 14,050 14,605
730
1,530
1,620 1,690 i
3,535 3,945
150 15 0 150
1,000 3,000 1,500
-230 230
-720 360
1,000 1,000 1,000
100 500 500 i
$ 133,020 $ 152,795 $ 153,325
Represents a minimum 10% vari ance (+/-) between th e adapt ed FY 2012-13 and proposed FY 2013-14 budgets.
ACCT.
4410 200% increase due to increased cost s res ulting from add it i onal meetings needed fo r sp ecia l PW Ci ty projects .
4465 43% i ncr ease du e to need fo r speci al supp l ies as sociated with engi neerin g/public works office .
178
Personnel
Salaries
4117 Community Development Director (20%)
4135 Public Safety & Services Manager (10%)
4132 Public Safety Officer (10%)
4116 Receptionist (20%)
4130 Secretary-Public Works (25%)
4174 Management Analyst (10%)
4161 Part Time
Management Analyst ($20.45 x 35 Hrs/Wks x 52 Wks)
Secretary vacation relief
4215 LA Co-General Services
General administrative services, public works plan checks, construction
permit processing, engineering surveys 1 and special project assistance
performed by the County, City portion of LAFCO costs
4239 Engineering Services
Professional engineering services, public works construction plan
checks, inspection services, engineering surveys, and special project
assistance performed by private company
Engineering/Public Works Contract Services
4277 NPDES
National Pollutant Discharge Elimination System (Environmental Engineering
Servcies for NPDES Program Development and Implementation)
NPDES Storm Drain Filming For Illegal Connections
Administer TMDL (Total Maximum Daily Loads) mandated by California Regional
Water Quality Control Board annual waste discharge (SRWCB)
Increase Catch Basin Maintenance per MS4 Permit
179
26,755
10,450
9,125
8,665
15,085
37,220
1,230
4320 Health Insurance
Medical, dental and vision
4340 PERS Retirement
4350 Medicare Tax
4360 Otherlnsurance
4410 Meeting Expense
Meeting Expense for Public Works
4420 Fares & Subsistence
Public Works Training/Conference for Public Safety Officer
and Director of Community Development
4425 Memberships/Subscriptions
Memberships for Public Works Organizations
4440 Telephone
Cell phone usage for Director of Community Development
4465 Special Department Supplies
General office supplies
4490 Training
Training for Public Works personnel (workshops, seminars & conferences)
180
4117
4135
4132
4116
4130
Personnel
Salaries
Community Development Director (20%)
Public Safety & Services Manager (10%)
Public Safety Officer (10%)
Receptionist (20%)
Secretary-Public Works (2S%)
4174 Management Analyst (10%)
4161 Part Time
Management Analyst ($21.68 x 35 Hrs/Wks x 52 Wks)
4215 LA Co-General Services
General administrative services, public works plan checks, construction
permit processing, engineering surveys, and special project assistance
performed by the County, City portion of LAFCO costs
4239 Engineering Services
Professional engineering services, public works construction plan
checks, inspection services, engineering surveys, and special project
assistance performed by private company
Engineering/Public Works Contract Services
4277 NPDES
National Pollutant Discharge Elimination System (Environmental Engineering
Servcies for NPDES Program Development and Implementation)
NPDES Storm Drain Filming For Illegal Connections
AdministerTMDl (Total Maximum Daily loads) mandated by California Regional
Water Quality Control Board annual waste discharge (SRWCB)
Increase Catch Basin Maintenance per MS4 Permit
4310 Optional Benefits Program
181
27,280
11,080
9,680
9,190
15,380
Medical, dental and vision
4340 PERS Retirement
4350 Medicare Tax
4360 Other Insurance
4410 Meeting Expense
Meeting Expense for Public Works
4420 Fares & Subsistence
Public Works Training/Conference for Public Safety Officer
and Director of Community Development
4425 Memberships/Subscriptions
Memberships for Public Works Organizations
4440 Telephone
Cell phone usage for Director of Community Development
4465 Special Department Supplies
General office supplies
(BNI Public Works Green Book, Cost Book, Standard Plans)
4490 Training
Training for Public Works personnel (workshops, seminars & conferences)
182
COMMUNITY DEVELOPMENT
Program: Street Cleaning
Account: 21-960-72
STATEMENT OF PURPOSE
Provide effective street cleaning services commensurate with public health and street maintenance requirements.
STAFFING SUMMARY
BUDGET SUMMARY
Personnel Costs
FUNDING SOURCES
General Fund
Gas Tax
KEY PROGRAM GOALS
ACTUAL
2011-12
PROPOSED PROPOSED
2013-14 2014-15 ------------------
------------------0.00 o.oo
PROPOSED PROPOSED
2013-14 2014-15
122,340 200,000
$ 122,340 $ 200,000
PROPOSED
2013-14
122,340
$ 122,340 $
PROPOSED
2014-15
200,000
200,000
1. Ensure that all commercial areas and public parking facilities are thoroughly swept no less than once per week.
2. Conduct scheduled street inspections, identify street cleaning deficiencies and coordinate appropriate corrective action.
KEY WORKLOAD MEASURES
Number of curb miles swept.
Implementation of city wide street sweeping ordinance.
183
PROPOSED PROPOSED
2013-14 2014-15
3,600
100%
6,900
100%
COMMUNITY DEVELOPMENT
EXPENDITURE DETAIL
PERSONNEL
OPERATING EXPENSES
ACCT.
4256 Street Cleaning
ACCOUNT MODIFICATIONS
ACTUAL
2011-12
Represents a minimum 10% variance(+/-) between the adopted FY 2012-13 and proposed FY 2013-14 budgets.
ACCT.
4256 63% increase due to cost of street sweeping all city streets once weekly.
184
Program:
Account:
Street Cleaning
21-960-72
PROPOSED PROPOSED
2013-14 2014-15
$ $
PROPOSED PROPOSED
2013-14 2014-15
122,340 200,000
$ 122,340 $ 200,000
4256 Street Cleaning
Athens Services -Street sweeping contract services
185
4256 Street Cleaning
Athens Services-Street sweeping contract services
( Including landfill) $10,195 x 12
186
COMMUNITY DEVELOPMENT
Program: Traffic Signal Maintenance
Account: 47-960-73
STATEMENT OF PURPOSE
Provide the energy and maintenance services required to operate the City's 28 signalized intersections and ten additional
signa.!ized intersections that are shared with the State of California, Los Angeles County, and City of Arcadia.
STAFFING SUMMARY
BUDGET SUMMARY
Personnel Costs
FUNDING SOURCES
Lighting & Landscape District
KEY PROGRAM GOALS
PROPOSED PROPOSED
2013-14 2014-15 ------------------0.00 0.00 ---------0.00 0.00
PROPOSED
2013-14
151,800
PROPOSED
2014-15
136,500
$ 151,800 $ 136,500
PROPOSED
2013-14
151,800
PROPOSED
2014·15
136,500
$ 151,800 $ 136,500
1. Provide comprehensive traffic signal maintenance services commensurate with contemporary industry standards.
2. Provide comprehensive traffic signal maintenance services commensurate with public safety requirements.
3. Monitor contract service operations, identify deficiencies, and promptly coordinate appropriate corrective action.
PROPOSED PROPOSED
KEY WORKLOAD MEASURES 2013-14 2014-15
Traffic signals inspected and serviced. 50% 100%
187
COMMUNITY DEVELOPMENT
EXPENDITURE DETAIL
PERSONNEL
OPERATING EXPENSES
ACCT.
4216 Contract Service· Public
4435 Utilities
4960 Administrative Charges
ACCOUNT MODIFICATIONS
ACTUAL
2011-12
ACTUAL
2011-12
Represents a minimum 10% variance(+/-) between the adopted FY 2012-13 and proposed FY 2013-14 budgets.
188
Program:
Account:
PROPOSED
2013-14
115,000
35,000
1,800
$ 151,800
Traff. Sig. Maint.
47-960-73
PROPOSED
2014-15
100,000
35,000
1,500
$ 136,500
4216 Contract Service-Public
Los Angeles County Public Works Department
Signal maintenance services (estimated) 38 signals control intersections
4435 Utilities
Edison International-Energy for 38 signal controlled intersections
4960 Administration
Reimbursement for general fund direct and indirect cost associated with
managing the program budget
189
115,000
4216 Contract Service-Public
Los Angeles County Public Works Department
Las Tunas/Muscatel (SO%)
Santa Anita/Freer (50%)
Temple City/Camino Real (50%)
Santa Anita/Live Oak
Rosemead/Longden (50%)
Signal maintenance services (estimated) 38 signals control intersections
4435 Utilities
Edison International-Energy for 38 signal controlled intersections
4960 Administration
Reimbursement for general fund direct and indirect cost associated with
managing the program budget
190
COMMUNITY DEVELOPMENT
Program:
Account:
Traffic Signs and Striping Maintenance
21-960-74
STATEMENT OF PURPOSE
Program provides the resources required to perform routine and emergency maintenance, the repairing & replacement of
traffic signs, and scheduled repainting of street markings.
STAFFING SUMMARY
Maintenance Lead Worker
Maintenance Worker
BUDGET SUMMARY
Personnel Costs
KEY PROGRAM GOALS
1. Conduct scheduled street sign and striping maintenance inspections.
2. Repaint all stop sign/bar-stop pavement markings.
3. Repaint all school zone pavement markings.
PROPOSED PROPOSED
2013-14 2014-15
37,475 38,970
188,145 139,445
$ 225,620 $ 178,415
PROPOSED PROPOSED
2013-14 2014-15
225,620 178,415
$ 225,620 $ 178,415
4. Repaint all pavement markings on primary thoroughfares and secondary collector streets, including crosswalks.
5. Repaint stop bars and pavement markings in areas with new asphalt or slurry seal.
KEY WORKLOAD MEASURES
Replace traffic signs with retro-reflectvity compliant signs.
Repaint stop sign/bar pavement markings.
Repaint school zone pavement markings.
191
.
PROPOSED PROPOSED
2013-14 2014-15
50%
SO%
50%
100%
100%
100%
COMMUNITY DEVELOPMENT
EXPENDITURE DETAIL
PERSONNEL
ACCT.
4139 Maintenance Lead Worker
4146 Maintenance Worker
4190 Allocated Benefits
OPERATING EXPENSES
ACCT.
4255 Striping/Pavement
4266 Curb Addressing
4310 Optional Benefits Program
4320 Health Insurance
4340 PERS Retirement
4350 Medicare Tax
4360 Other Insurance
4265 Special Dept Supplies
4510 Maintenance & Repair
ACCOUNT MODIFICATIONS
Total:
Total:
ACTUAL
2011-12
17,743
ACTUAL
2011-12
22,989
Represents a minimum 10% variance(+/-) between the adopted FY 2012-13 and proposed FY 2013-14 budgets.
ACCT.
Program:
Account:
PROPOSED
2013-14
18,830
18,645
TrafSig/Stripe
Maint
21-960-74
PROPOSED
2014-15
19,200
19,770
$ 37,475 $ 38,970
PROPOSED PROPOSED
2013-14 2014-15
125,000 100,000
25,000
575 575
6,660 7,420
8,180 8,505
545 565
1,785 1,980
400 400
20,000 20,000
$ 188,145 $ 139,445
4266 $25,000 increase due to the inititation of the City's efforts to re-paint curb addresses within 'residential properties.
192
4139
Personnel
Salaries
Maintenance Lead Worker (30%)
4146 Maintenance Worker (40%)
4255 Striping/Pavement
Schedule striping and pavement marking including select system
school zones, curb painting, new pavement, and pavement reflector
replacement (estimated)
4266 Curb Addressing
Perform every 5 years
4310 Optional Benefits Program
4320 Health Insurance
Medical, dental and vision
4340 PERS Retirement
4350 Medicare Tax
4360 Other Insurance
4465 Special Department Supplies
Small Tools and Materials
4510 Maintenance & Repair
City routine sign maintenance, replacement & repair (estimated)
193
18,830
4139
4146
Personnel
Salaries
Maintenance Lead Worker (30%)
Maintenance Worker (40%)
4255 Striping/Pavement
Schedule striping and pavement marking including select system
school zones, curb painting, new pavement, and pavement reflector
replacement (estimated)
4266 Curb Addressing
Perform every 5 years, next due FY2018-19
4310 Optional Benefits Program
4320 Health Insurance
Medical, dental and vision
4340 PERS Retirement
4350 Medicare Tax
4360 Other Insurance
4465 Special Department Supplies
Small Tools and Materials
4510 Maintenance & Repair
City routine sign maintenance, replacement & repair (estimated)
194
19,200
COMMUNITY DEVELOPMENT
Program: Street Maintenance
Account: 21-960-75
STATEMENT OF PURPOSE
Program provides the resources required for the maintenance and repair of all public streets, alleys, and access easements.
STAFFING SUMMARY
BUDGET SUMMARY
Costs
KEY PROGRAM GOALS
PROPOSED PROPOSED
2013-14 2014-15 --------------------0.00 0.00 --------------------0.00 0.00
PROPOSED
2013-14
122,500
$ 122,500 $
PROPOSED
2014-15
147,500
147,500
PROPOSED PROPOSED
2013-14 2014-15
10,000
122,500 137,500
$ 122,500 $ 147,500
1. Provide comprehensive street maintenance services to ensure proper maintenance of all public rights-of-way.
2. Perform scheduled street inspections, identify maintenance deficiencies and coordinate appropriate corrective action.
3. Perform scheduled resurfacing of selected streets from the pavement management study.
KEY WORKLOAD MEASURES
Scheduled hardscape repair and slurry seal in Maintenance Areas1 & 2. 1/
Scheduled hardscape repair and slurry seal in Maintenance Areas 3 & 4. 1/
Conduct Pavement Management Study & schedule hardscape and slurry repairs.
FOOTNOTES:
1/ As identified per the Pavement Management Study (PMS).
195
PROPOSED PROPOSED
2013-14 2014-15
100%
100
COMMUNITY DEVELOPMENT
EXPENDITURE DETAIL
PERSONNEL
OPERATING EXPENSES
ACCT.
4216 Contract Service-Public
4231 Prv/Spc Contract Services
4257 Street Maintenance
ACCOUNT MODIFICATIONS
ACTUAL
2011-12
147,315
Represents a minimum 10% variance(+/-) between the adopted FY 2012-13 and proposed FY 2013-14 budgets.
196
Program:
Account:
PROPOSED
2013-14
97,500
25,000
$ 122,500
Street Maint.
21-960-75
PROPOSED
2014-15
97,500
25,000
25,000
$ 147,500
4216 Contract Service-Public
Los Angeles County Public Works Department
Routine street maintenance and repair
Storm damage repairs and debris removal
4231 Prv/Spc Contract Services
4257 Street Maintenance
Pot Hole Repair
197
90,000
7,500
4216 Contract Service-Public
los Angeles County Public Works Department
Routine street maintenance and repair
Storm damage r€pairs and debris removal
4231 Prv/Spc Contract Services
Sewer & Street Funding Analysis
(Sewer Reconstruction funded $10,000)
4257 Street Maintenance
Pot Hole Repair
198
90,000
7,500
COMMUNITY DEVELOPMENT
Program: Sidewalk Maintenance
Account: 21-960-76
STATEMENT OF PURPOSE
Program provides the resources required to perfor~ routine maintenance and repair of City sidewalks.
STAFFING SUMMARY
BUDGET SUMMARY
Personnel Costs
SOURCES
SB821
Gas Tax
KEY PROGRAM GOALS
PROPOSED PROPOSED
2013-14 2014-15 --------------------0.00 o.oo --------------------0.00 o.oo
PROPOSED
2013-14
PROPOSED
2014-15
165,000 165,000
$ 165,000 $ 165,000
PROPOSED PROPOSED
2013-14 2014-15
165,000 165,000
$ 165,000 $ 165,000
1. Provide comprehensive sidewalk maintenance services to ensure the proper maintenance of all public sidewalks.
2. Perform scheduled sidewalk inspections, identify maintenance deficiencies.
3. Conduct citywide sidewalk needs assessment.
KEY WORKLOAD MEASURES
Scheduled hardscape repair in Maintenance Areas 1 & 2.
Scheduled hardscape repair in Maintenance Areas 3 & 4.
Monthly inspections of City sidewalks.
Install new ADA ramps. 1/
Sidewalk construction and improvements.
FOOTNOTES:
1/ ADA Ramps installation CDBG funded.
199
PROPOSED PROPOSED
2013-14 2014-15
100%
12
20
12
so
TBD
EXPEND ITURE DETA I L
ACTUAL ADOPTED
PERSONNEL 2011-12 2012-13
AC CT.
--
Total: $ -$ -
ACTUAL ADOPTED
OPERATING EXPENSES 2011-12 2012-13
ACCT.
42 16 Contract Se rv ice -Public 14,386 35,000
4 258 Sid ewalk M ainten ance 2,950 130,000
Total: $ 17,336 $ 165,000
ACCOUNT MODIFICATIONS
$
$
COMMUNITY DEVELOPMENT
ESTIMATED
2012-13
-
-
ESTIMATED
2012-13
10,000
10,000
20,000
Program:
Acc ount :
PROPOSED
2013-14
35,000
130,000
$ 165,000
Sid ewa l k Ma int.
2 1-96 0-76
PROPOSED
2014-15
35,000
130,000
$ 165,000
Represents a minimum 10% variance (+/-) bet ween the adopted FY 2012-13 and p r oposed FY 2013-14 budgets.
200
Los Angeles County Public Works Department sidewalk
sidewalk repairs
4258 Sidewalk Maintenance
Private contractors-Project design engineering services (estimated)
Project administration and construction inspection (estimated)
Sidewalk replacement (estimated)
201
Los Angeles County Public Works Department semi-annual sidewalk
inspection program and sidewalk repairs
4258 Sidewalk Maintenance
Private contractors-Project design engineering services (estimated)
Project administration and construction inspection (estimated)
Sidewalk replacement (estimated)
202
COMMUNITY DEVELOPMENT
Program: Solid Waste Management
Account: 01-960-77
STATEMENT OF PURPOSE
The Solid Waste Management Program provides the resources required to effectively administer the City's solid waste
disposal and source reduction services.
I STAFFING SUMMARY (FTEs)-NONE 1/
BUDGET SUMMARY
Personnel Costs
FUNDING SOURCES
General Fund
Grant
KEY PROGRAM GOALS
ACTUAL
2011-12
PROPOSED
2013-14
8,690
$ 8,690 $
PROPOSED
2013-14
8,690
$ 8,690 $
PROPOSED
2014-15
8,690
8,690
PROPOSED
2014-15
8,690
8,690
L Continue to administer the City's solid waste source reduction programs and ensure compliance with related state regulations per AB 939.
2. Continue to promote the proper disposal of all household hazardous waste by encouraging participation in the Los Angeles
County Household Hazardous Waste Recycling Program.
PROPOSED PROPOSED
KEY WORKLOAD MEASURES
Provide outreach at various community events regarding used oil recycling.
Maintain City presence at the San Gabriel Valley Solid Waste Joint Powers Authority (monthly).
Administer solid waste contract.
Household Hazardous Waste event.
FOOTNOTES:
2013-14 2014-15
5
12
1
5
12
1
1
1/ Solid waste pick-up and recycling service is currently provided by Athens Services for both residential and non-residential properties.
203
EXPENDITURE DETAIL
PERSONNEL-NONE
EXPENSES
4241 SRRE Program
4605 I m
ACCOUNT MODIFICATIONS
COMMUNITY DEVELOPMENT
Program:
Account:
PROPOSED
2013-14
2,500
6,190
$ 8,690 $
Solid Waste Mgmt
01-960-77
PROPOS EO
2014-15
2,500
6,190
8,690
Represents a minimum 10% variance{+/-) between the adopted FY 2012-13 and proposed FY 2013-14 budgets.
204
Refuse consultant (to conduct analysis of the 30-year evergreen agreement)
4241 SRRE Program
Professional consultation services. Solid waste reduction and
recycling element (SRRE) (estimated contingency)
4605 Recycling Program
(Fund 17)
Used Oil Program and Recycling Grant
205
Professional consultation services. Solid waste reduction and
recycling element (SRRE) (estimated contingency)
4605 Recycling Program
(Fund 17)
Used Oil Program and Recycling Grant
206
COMMUNITY DEVELOPMENT
Program:
Account:
Street Lighting
47-960-78
STATEMENT OF PURPOSE
Program provides comprehensive maintenance services and electrical power required to operate the City's street lighting
system. The cost for a portion of the safety lighting maintenance and repair is shared with other bordering jurisdictions.
STAFFING SUMMARY
Receptionist
Secretary~ Pub Wrks
Public Safety Officer
Public Safety & Services Manager
Management Analyst
BUDGET SUMMARY
Personnel Costs
FUNDING SOURCES
General Fund
$
PROPOSED PROPOSED
2013-14 2014-15
0.00 0.00
0.10 0.10
0.10 0.10
0.10 0.10
0.10 0.10
0.40 0.40
PROPOSED PROPOSED
2013-14 2014-15
29,865 31,420
343,420 344,470
373,285 $ 375,890
PROPOSED PROPOSED
2013-14 2014-15
373,285 375,890
$ 373,285 $ 375,890
KEY PROGRAM GOALS
1. Conduct scheduled street lighting system inspections, and identify maintenance deficiencies.
2. Update the City's lighting and maintenance assessment district engineer's report in accordance with the 1972 State
Lighting and Landscape Act.
KEY WORKLOAD MEASURES .
Updated street light master plan.
Upgrade street lights with the latest energy efficiency technology.
207
PROPOSED PROPOSED
2013-14 2014-15
50%
100%
100%
COMMUNITY DEVELOPMENT
EXPENDITURE DETAIL
PERSONNEL
ACCT.
4116 Receptionist
4130 Secretary-Pub Wrks 2,608
4132 Public Safety Officer 8,126
4135 Public Safety & Services Manager
4174 Management Analyst
4390 Allocated Benefits
Total:
ACTUAL
OPERATING EXPENSES 2011-12
ACCT.
4240 Assessment District Eng 13,150
4271 Prv/Spc Prgs Contract Srv 1,016
4310 Optional Benefits Program
4320 Health Insurance
4340 PERS Retirement
4350 Medicare Tax
4360 Other Insurance
4465 Special Dept Supplies
4510 Maintenance & Repair
4570 Energy & Maintenance
4960 Administrative Charges
Total:
ACCOUNT MODIFICATIONS
Represents a minimum 10% variance(+/~} between the adopted FY 2012-13 and proposed FY 2013-14 budgets.
208
Program:
Account:
PROPOSED
2013-14
6,035
9,125
10,450
4,2S5
$ 29,865
PROPOSED
2013-14
9,000
1,500
330
5,150
6,220
435
1,185
100
40,000
275,000
4,500
$ 343,420
Street Lighting
47-960-78
PROPOSED
2014-15
6,150
9,680
11,080
4,510
$ 31,420
PROPOSED
2014-15
9,000
1,500
330
5,730
6,540
455
1,315
100
40,000
275,000
4,500
$ 344,470
4135
4132
4130
Personnel
Salaries
Public Safety & Services Manager (10%)
Public Safety Officer (10%)
Secretary-Public Works (10%)
4174 Management Analyst (10%)
4240 Assessment District Engineer
Annual lighting and Maintenance Assessment District Update
4271 Private/Special Programs Contract Services
Underground Service Alert program (estimated)
4310 Optional Benefits Program
4320 Health Insurance
Medical, dental and vision
4340 PERS Retirement
4350 Medicare Tax
4360 Other Insurance
4465 Special Department Supplies
General office supplies
4510 Maintenance & Repair
Los Angeles County Public Works Department Street Light
maintenance and repair (estimated~ includes 3% liability insurance)
4570 Energy & Maintenance
Edison International Street light energy and maintenance costs
209
10,450
9,125
6,035
Reimbursement of general funds direct and indirect costs associated
with managing the program budget
210
4135
4132
4130
Personnel
Salaries
Public Safety & Services Manager (10%)
Public Safety Officer (10%)
Sei:reta~r{-Pulllk Works (10%)
4174 Management Analyst (10%)
4240 Assessment District Engineer
Annual Lighting and Maintenance Assessment District Update
4271 Private/Special Programs Contract Services
Underground Service Alert program (estimated)
4310 Optional Benefits Program
4320 Health Insurance
Medical 1 dental and vision
4340 PERS Retirement
4350 Medicare Tax
4360 Other Insurance
4465 Special Department Supplies
General office supplies
4510 Maintenance & Repair
Los Angeles County Public Works Department Street Light
maintenance and repair (estimated-includes 3% liability insurance)
4570 Energy & Maintenance
Edison International Street Light energy and maintenance costs
211
11,080
9,680
6,150
Reimbursement of general funds direct and indirect costs associated
with managing the program budget
212