HomeMy Public PortalAboutP&RAC Minutes 1988 11/16 OFFICE OF THE CLERK
BOX 1065
McCALL, IDAHO 83638
Minutes
Park Recreation Advisory Meeting
November 16, 1988
McCall City Hall 7: 30p.m.
Members Present: Williamson, Muller, Killen, Laidlaw, Droulard.
Staff-
Cooke, Schmidt
Guests-
Mayor Allen, Councilman Wallace
Chairman Williamson opened the meeting with a review of Park
Inspection conducted earlier. Comments and ideas were shared.
Members developed maintanance construction rating lists for seven
park/beach sites and one pathway network along lake shoreline.
Members suggested sixty-six potential projects to review and evaluate.
Williamson instructed members to return worksheets prior to
Thanksgiving to McCall City Hall.
(Preliminary ranking is attached)
Next meeting set for Monday. December 19, 1988, 7:00p.m. at McCall
City Hall.
Meeting adjourned at 10:10 p.m.
Staff Member
Park/Beaches Inspection Report
Nov. 1988
Priority of Maintainance, Repair, Acquisition
Park and Recreation Advisory Committee
(66 features/projects evaluated)
Priority Items:
LOCATION:
ITEM
TOTAL POINTS
1. Clean-up, Marina to Mill Park Shoreline
2. Clean-up, Waterfront/pump station #1 area
(Cutty Sark to Marina)
3. Clean-up, Abandoned Docks/marina area
4. Rotary Beach - Screen Dumpster
5. Rotary Beach - Improve and secure steps
6. Water Front Park - Aquire Brown's property
7. Turf Care - Fairway Park
113
104
101
101
100
96
94
93
8. Mill Park - Wood Deck Repair, Observation Platform ---
9. Waterfront Park - Define "Swim Only" & designate area
Buoys 93
10. Waterfront Park - Build year round permanent restrooms 92
11. Mill Park - Clean and Designate Beach Swim Area 91
12. Waterfront Park - Define & Develope Paths & Access --- 90
13. Mill Park - Improve main access - Walking 90
14. Waterfront Park - Addition beach sand 90
15. Marina/Mill Park Area - Clean & Thin Brush & Shrubs -- 90
Five committee members scoring; 25 points maximum each person.
PARK & RECREATION ADVISORY COMMITTEE
FACILITY INSPECTION & RECOMMENDATIONS
NOV. 1988
Each of the attached sites were inspected and areas
of improvement/repair/maintenance were noted.
Davis Beach
1. Define parking area; Pave, mark, ect.
2. Gate - Diamond Street
3. Additional benches
4. Sign - consolidation
5. Restrooms - lack of
6. Define the beach boundaries
7. Define Swim Area - buoys installed
8. Clean-up of Shoreline
Fairway Park
1. Additional public parking
2. Additional benches
3. Sign - Consolidation
4. Permanent restrooms
5. Playground equipment - add tot lot
6. Aggressive turf care
7. Additional shade trees
8. Improve drinking fountainl
9. Erect additional (Cai-Gas) barrier fence on property line
10. Land acquisition west end - near Davis Street
11. More portable bathrooms
Mill Park
1. Improve parking - additional space & better utilization
2. Improve access - Hemlock Pathway into park
3. Additional tables
4. Signs - Consolidation
5. Restroom security - lighting
6. Define Beach areas - clean (mark known hazards)
7. Clean Swimming area
8. Repair or replace flood lighting in observation area
9. Add Secruity lights
10. Add playground equipment
11. Designate tot swimming area
12. Burner removal
13. Deck maintainance and repair
14. Irrigation rehab
15. Firepit removal
16. Build picnic shelter
17. Maintain play area - volleyball/horeshoe pits
18. Turf maintenance - aggressive, annual fertilizer
Waterfront Park
1. Parking d~signated
2. Additional benches
3. Sign - Consolidation
4. Install permanent restroom
5. Define swim area - buoy "swimmers only"
6. Security lights
7. Playground equipment
8. Turf care - aggressive
9. Screen pumphouse
10. Acquire Brown's property
11. More beach sand
12. Shoreline Clean-Up
13. Path access - Marina to Sportsman Bar & Grill
14. Install drinking fountain
15. Acquire Century 21 site
Art Roberts Park
1. Improve path entry
2. Additional benches
3. Sign - Consolidation
4. Remove existing restroom bldg. - West side
5. Security lighting - Maximum
6. Irrigation Rehab
7. Aggressive turf maintenance
8. Drinking fountain repair
9. New trash recepticle
10. Dock bumpers
11. Rehab storm drain
12. New restroom
Rotary Beach
1. Finish paving parking
2. Improve steps
3. Sign - Consolidation
4. BBQ Pits
5. Add sand - Clean beach
6. Improve garbage dumpster
7. Repair retaining wall
Community Park
1. Benches
2. Drinking Fountain
Other Items Beach/Trails
1. Clean-up of dock building area.
2. Remove-Marina abandoned docks
3. Thin shrubs/brush
Mill Park to Marina