Loading...
HomeMy Public PortalAboutP&RAC Minutes 1988 11/16 OFFICE OF THE CLERK BOX 1065 McCALL, IDAHO 83638 Minutes Park Recreation Advisory Meeting November 16, 1988 McCall City Hall 7: 30p.m. Members Present: Williamson, Muller, Killen, Laidlaw, Droulard. Staff- Cooke, Schmidt Guests- Mayor Allen, Councilman Wallace Chairman Williamson opened the meeting with a review of Park Inspection conducted earlier. Comments and ideas were shared. Members developed maintanance construction rating lists for seven park/beach sites and one pathway network along lake shoreline. Members suggested sixty-six potential projects to review and evaluate. Williamson instructed members to return worksheets prior to Thanksgiving to McCall City Hall. (Preliminary ranking is attached) Next meeting set for Monday. December 19, 1988, 7:00p.m. at McCall City Hall. Meeting adjourned at 10:10 p.m. Staff Member Park/Beaches Inspection Report Nov. 1988 Priority of Maintainance, Repair, Acquisition Park and Recreation Advisory Committee (66 features/projects evaluated) Priority Items: LOCATION: ITEM TOTAL POINTS 1. Clean-up, Marina to Mill Park Shoreline 2. Clean-up, Waterfront/pump station #1 area (Cutty Sark to Marina) 3. Clean-up, Abandoned Docks/marina area 4. Rotary Beach - Screen Dumpster 5. Rotary Beach - Improve and secure steps 6. Water Front Park - Aquire Brown's property 7. Turf Care - Fairway Park 113 104 101 101 100 96 94 93 8. Mill Park - Wood Deck Repair, Observation Platform --- 9. Waterfront Park - Define "Swim Only" & designate area Buoys 93 10. Waterfront Park - Build year round permanent restrooms 92 11. Mill Park - Clean and Designate Beach Swim Area 91 12. Waterfront Park - Define & Develope Paths & Access --- 90 13. Mill Park - Improve main access - Walking 90 14. Waterfront Park - Addition beach sand 90 15. Marina/Mill Park Area - Clean & Thin Brush & Shrubs -- 90 Five committee members scoring; 25 points maximum each person. PARK & RECREATION ADVISORY COMMITTEE FACILITY INSPECTION & RECOMMENDATIONS NOV. 1988 Each of the attached sites were inspected and areas of improvement/repair/maintenance were noted. Davis Beach 1. Define parking area; Pave, mark, ect. 2. Gate - Diamond Street 3. Additional benches 4. Sign - consolidation 5. Restrooms - lack of 6. Define the beach boundaries 7. Define Swim Area - buoys installed 8. Clean-up of Shoreline Fairway Park 1. Additional public parking 2. Additional benches 3. Sign - Consolidation 4. Permanent restrooms 5. Playground equipment - add tot lot 6. Aggressive turf care 7. Additional shade trees 8. Improve drinking fountainl 9. Erect additional (Cai-Gas) barrier fence on property line 10. Land acquisition west end - near Davis Street 11. More portable bathrooms Mill Park 1. Improve parking - additional space & better utilization 2. Improve access - Hemlock Pathway into park 3. Additional tables 4. Signs - Consolidation 5. Restroom security - lighting 6. Define Beach areas - clean (mark known hazards) 7. Clean Swimming area 8. Repair or replace flood lighting in observation area 9. Add Secruity lights 10. Add playground equipment 11. Designate tot swimming area 12. Burner removal 13. Deck maintainance and repair 14. Irrigation rehab 15. Firepit removal 16. Build picnic shelter 17. Maintain play area - volleyball/horeshoe pits 18. Turf maintenance - aggressive, annual fertilizer Waterfront Park 1. Parking d~signated 2. Additional benches 3. Sign - Consolidation 4. Install permanent restroom 5. Define swim area - buoy "swimmers only" 6. Security lights 7. Playground equipment 8. Turf care - aggressive 9. Screen pumphouse 10. Acquire Brown's property 11. More beach sand 12. Shoreline Clean-Up 13. Path access - Marina to Sportsman Bar & Grill 14. Install drinking fountain 15. Acquire Century 21 site Art Roberts Park 1. Improve path entry 2. Additional benches 3. Sign - Consolidation 4. Remove existing restroom bldg. - West side 5. Security lighting - Maximum 6. Irrigation Rehab 7. Aggressive turf maintenance 8. Drinking fountain repair 9. New trash recepticle 10. Dock bumpers 11. Rehab storm drain 12. New restroom Rotary Beach 1. Finish paving parking 2. Improve steps 3. Sign - Consolidation 4. BBQ Pits 5. Add sand - Clean beach 6. Improve garbage dumpster 7. Repair retaining wall Community Park 1. Benches 2. Drinking Fountain Other Items Beach/Trails 1. Clean-up of dock building area. 2. Remove-Marina abandoned docks 3. Thin shrubs/brush Mill Park to Marina