Loading...
HomeMy Public PortalAbout03.13.00 COW AgendaRichard A. Rock PRESIDENT TRUSTEES Stephen J. Calabrese VILLAGE OF PLAINFIELD Mich ei co® s WILL COUNTY'S OLDEST COMMUNITY Katnyo'Conneu Steven L. Rathbun Raymond Smolich Susan Janik VILLAGE CLERK WORKSHOP OF THE PRESIDENT AND BOARD OF TRUSTEES HELD ON MONDAY, MARCH 13, 2000 AT THE VILLAGE BOARD ROOM 530 W. LOCKPORT STREET, SUITE 206, PLAINFIELD 7:00 P.M. 1) CALL TO ORDER, ROLL CALL, PLEDGE 2) 2000-2001 BUDGET DISCUSSION. We will be discussing the proposed budget for fiscal year 2000-2001 for the Public Works Department. Supt. Persons will review the salient portions of the proposed expenditures for the Streets and Water and Sewer Divisions. He • will also review the proposed Utility Expansion Expenditures including the second Wastewater Treatment Plant. Mr. Minick will discuss the proposed 15% water/sewer rate increase and the proposed vehicle sticker increase. Mr. Minick will then also review the miscellaneous funds' budgets. After this review, we will have reviewed the proposed budgets for all of the funds and departments of the Village. Please bring your Budget Book to the Meeting. 3) ANY OTHER BUSINESS. DEFERRED ITEMS Joint Meeting with Plan Commission -Jeff Durbin Ordinance Updates -Jeff Durbin Open Space Definition -Jeff Durbin Infrastructure Maintenance Fee-Chris Minick- FYI-This is on hold. State Supreme Court has to rule on its validity. Radium Compliance -Allen Persons Oswego Boundary Agreement -Terry Burghard DesPlaines Street Power Lines-Terry Burghard 530 W. LOCKPOI~T STREET, SUITE 206 PLAINFtELp, ILLINOIS 60544 (815) 436-7093 Fax (815) 436-1950 '"' VILLAGE OF PLAINFIELD WILL COUNTY'S OLDEST COMMUNITY March 8, 2000 To: Mayor Rock and the Board of Trustees From: Chris Minick, Finance Director Subject: 2000-2001 Budget Discussion Richard A. Rock PRESIDENT TRUSTEES Stephen J. Calabrese John H. Cherry Michael Collins Kathy O"Connell Steven L. Rathbun Raymond Smolich Susan Janik VILLAGE CLERK On March 14, we will be discussing the budget for the remaining department, Public Works and its divisions, Streets, Water and Sewer. Please bring your copy of the draft budget to the meeting. We will also be discussing the proposed 15% rate increase. The amount of the increase is $.56 per 100 cubic feet (748 gallons) of water consumed. This rate increase is necessary to fund the compliance portion of costs attributable to the new sewer plant. The compliance portion of these casts represent costs to comply with more stringent EPA standards regarding Ammonia discharge. The Village Board and the Village's outside consultant have previously determined that it is not cost efficient or practical to try to implement these changes at the existing sewer plant. The increase is also to offset some additional operational expenditures of the water and sewer operation, such as engineering services for compliance with the proposed radium standard and costs of replacing water and. sanitary sewer mains and lines on Des Plaines Street from Lockport St. north to Main St. I have enclosed an analysis of how we came to the allocation of costs of the second sewer plant for compliance and for growth. We have allocated about 68% of costs to growth and 32% of costs to compliance. Due to the stricter Ammonia standards, we will lose approximately 10,600 PE from the existing sewer plant. These PE have been factored into the allocation of costs for the new sewer plant. I will explain this schedule in detail at the Meeting. 530 W. LOCKPORT STREET, SUITE 206 PLAINFIELD, ILLINOIS 60544 (815) 436-7093 Fax (815) 436-1950 Village of Plainfield WWTP#2 Cost Analysis Summary of Costs per PE October 26, 1999 Costs Costs of Construction of WWTP # 2 19,500,000 Interest Costs 14,704,fi05 Percentage Allocations Total Costs of WWTP # 2 34,204,605 Growth Portion of PE Constructed 23,000 68.45% Less: PE "lost" from WWTP # 1 10,600 31.55% Total PE Constructed 33,fi00 100.00% Total Costs of WWTP #2 34,204,605 Compliance Percentage of PE 31.55% Total Compliance Allocation of Costs 10,791,553 Total Growth Allocation of Costs 23,413,052 ~" Cost and PE data based on Facilities Plan-Wastewater Treatment System Design Repork compiled by Baxter and Woodman, Consulting Engineers in May of 1999. •