Loading...
HomeMy Public PortalAbout04.12.99 COW Agendar 0 VILLAGE OF PLAINFIELD WILL COUNTY'S OLDEST COMMUNITY WORKSHOP OF THE PRESIDENT AND BOARD OF TRUSTEES HELD ON MONDAY, APRIL 12,1999 AT THE VILLAGE BOARD ROOM 530 W. LOCKPORT STREET, SUITE 206, PLAINFIELD 7:00 P.M. 1) CALL TO ORDER, ROLL CALL, PLEDGE 2) MINUTES - Workshop Monday, February 8, 1999 Richard A. Rock PRESIDENT TRUSTEES Jay D. Darnell Jeffrey Dement Kathy O'Connell Steven L. Rathbun Raymond Smolich Kurt Stalzer Susan Janik VILLAGE CLERK 3) DEVELOPMENT CONCEPT PLAN. Local developers have assembled a sizeable portion of land between 127th Street south to beyond 135th Street and from Heggs Road west beyond Stewart Road. This mixed use development will have a seven to ten year buildout and incorporates various neighborhoods offering a mix in housing opportunities. The developers at this point have prepared a simple concept plan and prior to compiling the required engineering and detail study elements, they have asked for basic review by the elected officials at a public meeting. Attached is a concept map. 4) RADIUM COMPLIANCE PLAN. Last year the Village employed the engineering firm of Baxter and Woodman to prepare an analysis of the costs and options for compliance with the predicted Radium standards. Enclosed is a copy of that study. Representatives from Baxter and Woodman will be at the meeting. Attached to this Agenda is an Executive Summary. 5) ANY OTHER BUSINESS. DEFERRED ITEMS Downtown Competition Implementation TIF District Implementation Sewage Treatment Plant Expansion Traffic Signal Location Plan Train Station Relocation I-55 Connection Feasibility Joint Meeting with Plan Commission Infrastructure Maintenance Fee Economic Incentive Target Areas 23145 W. LINCOLN HIGHWAY • PLAINFIELD, ILLINOIS 60544 - (815) 436-7093 • Fax (815) 436-1950 EXECUTIVE SUMMARY This report analyzes the capability of the Village of Plainfield's water supply to provide safe, clean water in sufficient quantities to meet the present and future water needs of the Village. This report serves as the primary planning document required by the Illinois Environmental Protection Agency for participation in the Illinois Safe Drinking Water Act Revolving Loan fund. It is also intended to be an effective planning and educational tool for the Board of Trustees and the citizens of Plainfield. The report -begins with an overview of radium compliance issues, the Plainfield community and water system, project goals, and compliance schedules. The potential alternatives for achieving compliance are then reviewed in detail, and selected system wide strategies are developed. Possible financing methods are then presented and the resultant so water rates are developed for each alternative. After discussing the recommended alternative items remaining to achieve compliance are listed and a project schedule is presented. The goals for this project have been identified as follows: 1. Provide a safe, clean, aesthetically pleasing water to the community. 2. Conform to state and federal water quality regulations. 3. Achieve compliance with the radium water quality regulations. 4. Achieve compliance not later than deadlines established by the IEPA. 5. Minimize the cost impact of compliance on the consumer as much as possible. 6. Achieve compliance in a manner that allows future growth of the water system at a reasonable cost. 0 z. 0 i a listing of the significant findings, conclusions and The following s g gn $ , , recommendations of this report: ■ The current average daily pumpage is 1.0 million gallons per day (mgd). The historical maximum demand day utilized 2.2 mgd. Average and maximum day demands in Year 2020 are expected to be 4.16 mgd and 8.32 mgd respectively. ■ The firm capacity of the existing wells is 1150 gpm, or 1.65 mgd. Thus, the existing wells are not sufficient to meet the current maximum day demands. Drilling two new water supply wells each with a capacity of approximately 725 gpm will be sufficient to provide sufficient water to meet Year 2000 maximum day water demands. ■ Assuming Plainfield keeps all of the existing wells in service, constructs two new wells, and provides the treatment needed to reduce the radium, there will still be a need for additional supply sources in the future due to the projected rapid population growth. One new well with a capacity of approximately 725 gpm and with treatment facilities to remove radium will be required approximately every four years to meet the projected water usage demand. ■ The water pumped from the wells generally exceeds the current interim radium maximum contaminate level of 5 pCi/l (combined for both radium -226 and radium -228). ■ Plainfield will likely be required to achieve compliance within two years of promulgation of the final radium standard by the USEPA. USEPA is obligated to complete its work by November 2000. Thus, Plainfield's compliance date is projected to be sometime between November 2001 and November 2002. ■ Water systems taking corrective action to reduce radium concentrations can choose from four primary alternatives: modification of existing well construction; development or purchase of alternative sources of water; mixture of high and low radium content water sources; and installation of appropriate treatment technology. ■ Based on an examination of the alternatives, the most feasible means of meeting the City's goals were determined to be: Alternative 1: Deep Well Water With Conventional Ion -Exchange at Each Well. Alternative 2: Deep Well Water With Conventional Ion -Exchange: Centralized 0 Treatment at Three Locations. 0 0 Alternative 3: Deep Well Water with Lime Softening. Alternative 4: Lake Michigan Water Alternative 5: Kankakee River Water ■ The present worth of the costs to construct and operate the facilities reported for each Alternative are listed below: Summary of Present Worth Analysis Present Worth Present Worth Alternative Description 1 Ci/1 5 Ci/1 No. 1 Ion -Exchange at Each Well $18,171,000 $17,664,000 No. 2 Ion -Exchange at Three Locations $20,067,000 $19,581,000 No. 3 Lime Softening $38,902,000 $38,902,000 No. 4 Lake Michigan $33,325,000 $33,325,000 No. 5 Kankakee River $23,067,000 $23,067,000 iBased on an evaluation and comparison of the cost-effectiveness, advantages, and disadvantages, we recommend Alternative 1: Deep Well Water with Ion - Exchange at Each Well. At the time this report was prepared, the Federal Standards for radium were not finalized. The recommended alternative is to plan for a possible future regulation of 1 pCi/1 for radium -228. Although the improvements would be sized for the more stringent level, the facilities will operate to meet the current regulations until the final standard is adopted. The total capital cost of these improvements is estimated to be $14,992,000 in 1999 dollars projected over the next 20 years. ■ Some advantages of this alternative are that it is the least costly alternative to implement, it will be easy to "phase-in" in a rapidly growing community, it provides the Village with softened water and it is easy to operate and maintain. A significant disadvantage of this alternative is that the long-term ability of the sandstone aquifer to supply water to Plainfield and other communities is questionable. It may be necessary to ultimately find a replacement source of supply. ■ The recommended improvements can be implemented as a multi phased project. Phase 1 as proposed would include the improvements required to supply and treat water to meet existing water demands. The capital cost to provide treatment at Wells Nos. 3, 4, and 5 is $2,926,000. The capital cost to drill and treat Wells Nos. 6 and 7 which are needed to meet Year 2000 demands is $4,022,000 Future 0 4. phases of the project would include proposed new deep wells with treatment facilities to meet future water demands. Before construction can begin on some of the improvements, land will need to be purchased and/or easements will need to be acquired. Table 29 shows a list of recommended improvements, the associated capital costs, and the recommended phasing. ■ Using the existing and projected operating costs detailed in Section 6 and assuming 40 percent of the borrowed funds will be provided through the IEPA low interest loan program, water rates will need to be increased from the current amount of $1.97/100 cubic feet ($2.63/1,000 gallons) to $3.63/100 cubic feet ($4.89/1,000 gallons) to fund the first phase of the improvements. Subsequent phases are expected to be funded by connection fees and other sources of revenue. ■ There remain numerous items for the Village to complete prior to the award of an Illinois Environmental Protection Agency low interest loan and the start of construction of the water treatment facilities. These tasks are listed in Section 13. is a E 0 w Ll . � . � !!-, ! t