HomeMy Public PortalAbout04 April 10, 2023 CSTAC
RIVERSIDE COUNTY TRANSPORTATION COMMISSION
Citizens and Specialized Transit Advisory Committee
TIME: 11:00 a.m.
DATE: Monday, April 10, 2023
LOCATION: Riverside County Transportation Commission
March Field Conference Room A
4080 Lemon Street, 3rd Floor, CA 92502-2208
VIDEO CONFERENCE SITES:
Palo Verde Valley Transit SunLine Transit Agency
415 N. Main Street 32505 Harry Oliver Trail
Conference Room A Board Room
Blythe, CA 92225 Thousand Palms, CA 92276
COMMITTEE MEMBERS
Lisa Castilone, Chair, GRID Alternatives, Western and Southwest Riverside County
Gloria J. Sanchez, Vice Chair, Menifee Senior Advisory, Southwest Riverside County
John Krick, Second Vice Chair, T-Now Member, Northwest Riverside County
John Chavez, Retired Citizen, San Gorgonio Pass
George Colangeli, Palo Verde Valley Transit Agency, Palo Verde Valley
Alejandra Gonzalez, Norco Seniors on the Move, Northwest Riverside County
Jack Marty, Retired Citizen, San Gorgonio Pass
Mary Jo Ramirez, Workforce Development Member, Southwest Riverside County
Ivet Woolridge, Independent Living Partnership, Riverside County
Riverside Transit Agency, Western Riverside County
SunLine Transit Agency, Coachella Valley
RIVERSIDE COUNTY TRANSPORTATION COMMISSION
CITIZENS AND SPECIALIZED TRANSIT ADVISORY COMMITTEE
www.rctc.org
AGENDA*
*Actions may be taken on any item listed on the agenda
11:00 a.m.
Monday, April 10, 2023
Riverside County Transportation Commission
March Field Conference Room A
4080 Lemon Street, Third Floor
Riverside, California
VIDEO CONFERENCE SITES:
Palo Verde Valley Transit Agency SunLine Transit Agency
415 N. Main Street 32505 Harry Oliver Trail
Conference Room A Board Room
Blythe, CA 92225 Thousand Palms, CA 92276
For members of the public wishing to submit comment in connection with the Committee Meeting please
email written comments to the Clerk of the Board at lmobley@rctc.org prior to April 9, 2023 at
5:00 p.m. and your comments will be made part of the official record of the proceedings. Members of the
public may also make public comments through their telephone or Zoom connection when recognized by
the Chair.
In compliance with the Brown Act and Government Code Section 54957.5, agenda materials
distributed 72 hours prior to the meeting, which are public records relating to open session agenda
items, will be available for inspection by members of the public prior to the meeting on the
Commission’s website, www.rctc.org.
In compliance with the Americans with Disabilities Act, Government Code Section 54954.2,
Executive Order N-29-20, and the Federal Transit Administration Title VI, please contact the Clerk
of the Board at (951) 787-7141 if special assistance is needed to participate in a Committee
meeting, including accessibility and translation services. Assistance is provided free of charge.
Notification of at least 48 hours prior to the meeting time will assist staff in assuring reasonable
arrangements can be made to provide assistance at the meeting.
1. CALL TO ORDER
2. ROLL CALL
Citizens and Specialized Transit Advisory Committee
April 10, 2023
Page 2
3. PUBLIC COMMENTS – Under the Brown Act, the Board should not take action on or discuss
matters raised during public comment portion of the agenda which are not listed on the
agenda. Board members may refer such matters to staff for factual information or to be
placed on the subsequent agenda for consideration. Each individual speaker is limited to
speak three (3) continuous minutes or less.
4. ADDITIONS/REVISIONS (The Committee may add an item to the agenda after making a
finding that there is a need to take immediate action on the item and that the item came
to the attention of the Committee subsequent to the posting of the agenda. An action
adding an item to the agenda requires 2/3 vote of the Committee. If there are less than
2/3 of the Committee members present, adding an item to the agenda requires a
unanimous vote. Added items will be placed for discussion at the end of the agenda.)
5. CONSENT CALENDAR - All matters on the Consent Calendar will be approved in a single
motion unless a Committee member(s) requests separate action on specific item(s). Items
pulled from the Consent Calendar will be placed for discussion at the end of the agenda.
5A. APPROVAL OF MINUTES – FEBRUARY 13, 2023
Page 1
6. FISCAL YEAR 2023/24 – 2025/26 DRAFT SHORT RANGE TRANSIT PLAN UPDATES
Page 5
Overview
This item is for the Committee to receive and file Draft Fiscal Year (FY) 2023/24 – 2025/26
Short Range Transit Plan (SRTP) updates from the cities of Banning, Beaumont, Corona,
and Riverside; Palo Verde Valley Transit Agency (PVVTA); Riverside Transit Agency (RTA);
SunLine Transit Agency (SunLine); and the Commission’s Rail and Vanpool Programs.
7. COMMITTEE MEMBER / STAFF REPORT
Overview
This item provides the opportunity for the Committee members, transit operators, and
staff to report on attended and upcoming meetings/conferences and issues related to
Committee activities.
8. ADJOURNMENT
The next Citizens and Specialized Transit Advisory Committee meeting is scheduled for
June 12, 2023.
AGENDA ITEM 5A
MINUTES
RIVERSIDE COUNTY TRANSPORTATION COMMISSION
CITIZENS AND SPECIALIZED TRANSIT ADVISORY COMMITTEE
February 13, 2023
Minutes
1.CALL TO ORDER
The meeting of the Citizens and Specialized Transit Advisory Committee was called to
order by Chair Gloria Sanchez at 11:04 a.m. via Zoom ID 859 2177 6691. Pursuant to
Governor Newsom’s Executive Order N-29-20, (March 18, 2020), the Citizens and
Specialized Transit Advisory Committee was only be conducted via video conferencing
and by telephone.
2.ROLL CALL
Members Present Members Absent
Lisa Castilone
Christian Castro
John Chavez
Alejandra Gonzalez
John Krick
Mary Jo Ramirez*
Gloria J Sanchez
*arrived after meeting started
Jack Marty
Ivet Woolridge
Riverside Transit Agency
Sunline Transit Agency
3.PUBLIC COMMENTS
There were no public comments.
4.ADDITIONS/REVISIONS
None
5.CONSENT CALENDAR - All matters on the Consent Calendar will be approved in a single
motion unless a Committee Member requests separate action on specific item(s). Items
pulled from the Consent Calendar will be placed for discussion at the end of the agenda.
M/S/C (Castilone/Gonzalez) to approve the following Consent Calendar item(s):
5A. APPROVAL OF MINUTES – December 12, 2022
At this time, Mary Jo Ramirez joined the meeting.
1
Citizens and Specialized Transit Advisory Committee
February 13, 2023
Page 2
6. MEASURE A SPECIALIZED TRANSIT PRESENTATION
This item is for the Committee to receive and file a presentation from Measure A
Specialized Recipients, the City of Norco and United States Veterans (U.S. Vets).
Eric DeHate, Transit Manager, introduced Gage Zettelmeier from the city of Norco to
present their specialized program.
Mr. Zettelmeier presented an overview of the programs offered at the Rose M. Elder
Senior Center.
Vice Chair Castilone asked how the increase in gas prices has affected their budget.
Mr. Zettelmeier replied that gas price increase was not taken into consideration and they
will have evaluate and look at further.
Chair Sanchez asked if the riders were encouraged to make donations or pay any fees.
Mr. Zettelmeier replied seniors are not asked to donate and drivers are instructed not to
accept donations. The only time seniors are charged a fee is when there is a ticket price
involved in the excursions.
John Krick asked if it was possible to get same day transportation or if they could only
accommodate when given a weeks notice.
Mr. Zettelmeier responded the seniors can call to get a ride the day they need it but it
cannot be guaranteed so they are advised to call in advance to make sure transportation
is available.
Chair Sanchez requested a breakdown of where the riders are going.
Mr. Zettelmeier replied the majority of the rides are to medical appointments and the
senior center itself.
Vice Chair Castilone inquired about the marketing and outreach for this program.
Mr. Zettelmeier responded they do 3-4 tabling events a year with the driver going to the
senior living centers with information regarding all the programs and services they
provide.
Mr. DeHate introduced Nicole Starks-Murray from U.S. Vets Inland Empire to present the
programs they provide.
2
Citizens and Specialized Transit Advisory Committee
February 13, 2023
Page 3
Ms. Starks-Murray presented an overview of the programs offered by the U.S. Vets Inland
Empire.
Chair Sanchez asked what kind of pick ups are offered.
Ms. Starks-Murray stated that there are multiple types of pick ups provided. The person
just needs to call in to request a ride.
Chair Sanchez commented that the veterans in the city of Menifee have trouble finding
transportation to Loma Linda for appointments.
Ms. Starks-Murray discussed the various ways the veterans in the city of Menifee and
various other areas can utilize their services.
Vice Chair Castilone asked if they are able to use the vouchers provided by places like
Loma Linda.
Ms. Starks-Murray replied that if they are unable to transport the veteran then they
provide alternate transportation and resources such as the Loma Linda voucher program.
Mary Jo Ramirez asked what size their fleet is.
Ms. Starks-Murray responded they currently have one 15 passenger and one 12
passenger van and a few smaller van fleets for the Colton and San Bernardino sites. We
are a small but we are a 24-hour program.
7. ELECTION OF OFFICERS
This item is for the Citizens and Specialized Transit Advisory Committee to conduct an
election of officers for 2023 – Chair, Vice Chair and Second Vice Chair.
M/S/C (Ramirez/Gonzalez) to elect Lisa Castilone as Chair.
M/S/C (Ramirez/Castilone) to elect Gloria Sanchez as Vice Chair.
M/S/C (Ramirez/Sanchez) to elect John Krick as Second Vice Chair.
8. COMMITTEE MEMBER/STAFF REPORT
8A. Chair Sanchez updated the committee on the pilot program in Menifee.
3
Citizens and Specialized Transit Advisory Committee
February 13, 2023
Page 4
8B. Mr. DeHate reminded the committee the next meeting will be in person and gave
an update on Commission meeting.
8C. Mr. DeHate updated the committee on LCTOP funds.
8D. Vice Chair Castilone asked if there were any news regarding the Menifee high
school issues from the previous meeting.
8E. Lorelle Moe-Luna, Multimodal Services Director, replied that all the comments
were forwarded to RTA and they are doing a sustainable service plan study and
we can ask them to share the results with us.
8E. Chair Sanchez asked about an update on the Temescal Valley comments that were
received during the last meeting as well.
8F. Ms. Moe-Luna replied that RTA is working on that as well.
9.ADJOURNMENT
There being no further business for consideration by the Citizens and Specialized Transit
Advisory Committee, the meeting adjourned at 11:59 a.m.
Respectfully submitted,
Lorelle Moe-Luna, Multimodal Services Director
4
AGENDA ITEM 6
Agenda Item 6
RIVERSIDE COUNTY TRANSPORTATION COMMISSION
DATE: April 10, 2023
TO: Citizens and Specialized Transit Advisory Committee
FROM: Eric DeHate, Transit Manager
THROUGH: Lorelle Moe-Luna, Multimodal Services Director
SUBJECT: Fiscal Year 2023/24 – 2025/26 Draft Short Range Transit Plan Updates
STAFF RECOMMENDATION:
This item is for the Committee to receive and file Draft Fiscal Year (FY) 2023/24 – 2025/26 Short
Range Transit Plan (SRTP) updates from the cities of Banning, Beaumont, Corona, and Riverside;
Palo Verde Valley Transit Agency (PVVTA); Riverside Transit Agency (RTA); SunLine Transit Agency
(SunLine); and the Commission’s Rail and Vanpool Programs.
BACKGROUND INFORMATION:
The SRTPs serve as the Commission’s primary justification for federal and state grants for transit
operations and capital and provides a short-term vision of public transportation for the county
including strategies that will help guide transportation decisions over the next three to five years.
In Riverside County, there are seven public bus transit operators (Banning, Beaumont, Corona,
and Riverside; RTA; SunLine; and PVVTA), and the Commission as a commuter rail and vanpool
operator – a total of eight transit operators.
Under state law, the Commission is tasked with the responsibility to identify, analyze, and
recommend potential productivity improvements to ensure federal, state, and local funds are
allocated to transit operators to provide needed transit services for county residents. An annual
SRTP update is a mechanism to meet this obligation and coordinate transit services throughout
the county. The core components of each agency’s SRTP includes the operating and capital plans
and project justifications that are utilized as the basis for receiving transit funding. The SRTPs
also document each operator’s system and route performance data, which provide the basis for
the Commission’s oversight activities to ensure compliance with the Transportation
Development Act, federal regulations, state law, and Commission-adopted policies and
guidelines.
Each operator will provide an overview of the major projects and activities anticipated in their
FY 2023/24 SRTP update. The purpose of the presentations is to seek feedback and input from
the CSTAC for future improvements. Staff will bring the final FY 2023/24 SRTP requests for
funding approval to the Commission in June 2023.
5
FY24 Operating and Capital Budget*
FY24 –FY26 Short-Range Transit Plan
CSTAC Meeting
April 10, 2023
* Budget numbers presented here are estimates and not final.
32 Local fixed routes
3 Commuter routes
Riverside County
Orange County
San Bernardino County
1 GoMicro Transit Zone
Fixed Route Bus Service
Bus Fleet
145 Directly Operated
78 Contracted Fixed Routes
84 Dial a Ride
8 GoMicro
315
RTA’s mission is to provide safe, reliable and cost-effective transportation for the
public of western Riverside County.
FY24 Mission and Strategy
To carry out that mission in FY24, staff is implementing a strategy and plan to:
•Preserve –and grow -ridership
•Budget within forecasted revenues and in concert with RCTC direction
•Continue providing routes/service that meets rider demand
•Continue to be fiscally responsible with taxpayer funds and comply with all laws and
regulations
FY24 SRTP: Budget Summary
The FY24 Operating Budget reflects service growth of 9%in terms of revenue
service hours.The budget also incorporates recommendations from the Board
approved Sustainable Service Plan (SSP).
Current FY23
Budget
FY24
Proposed
Change
Incr.+/(Decr.)
Change
%
Operating Budget 93,245,222$ 102,028,908$ 8,783,686$ 9%
Capital Budget 15,917,364$ 18,542,680$ 2,625,316$ 16%
Total Budget 109,162,586$ 120,571,588$ 11,409,002$ 10%
•Operating Budget increase largely driven by increases in Dial-A-Ride and Microtransit service.
•Capital Budget increase primarily driven by programming for vehicle purchases.
FY24 Service Profile
•Fixed Route Revenue Service Hours
•Implement Year 1 service improvements from the Sustainable Service Plan
•Increase service on Route 44 along San Jacinto Avenue
•Continue no service on 6 major holidays
•DAR Service and Passenger Demand
•Coverage window similar to pre-COVID-19
•9th year of DAR Plus (¾ mile to 2 ¾ miles)
•Anticipate higher ridership demand than FY23
FY24 Operating Budget Highlights
•Operating budget = $102,028,908
•9% or $8,783,686 increase over FY23
•Staffing compared to FY23 Budget
•Coach Operators: 11 positions higher to 265
•Maintenance and maintenance-related: 1 position higher to 93 (Project Manager)
•Purchased transportation costs reflect service plan and
contractual rates for new year.
•Service level similar to FY23, with growth in Dial-A-Ride and
Microtransit, implementation of SSP recommendations
Operating Budget: Major Functions
FY23 Budget FY24 Budget
Change
Incr+/(Decr)
Growth
%Comments / Drivers
Operations 55,755,397$ 62,275,755$ 6,520,358$ 12%Increased service
Maintenance 14,808,613$ 15,806,657$ 998,044$ 7%Increased fuel and parts costs
Planning 904,450$ 1,018,207$ 113,757$ 13%Scheduling software and support
Administration 21,776,762$ 22,928,289$ 1,151,527$ 5%Increases in insurance, wages and benefits
Total Operating Budget 93,245,222$ 102,028,908$ 8,783,686$ 9%
Operations
61%
Maintenance
16%
Planning
1%
Administration
22%
Operating Budget: Major Cost Elements
FY23 Budget FY24 Budget
Change
Incr+/(Decr)%Rationale
Salaries & Benefits 44,492,579$ 46,770,244$ 2,277,665$ 5%Wage and benefit growth
Contracted Routes 28,376,201$ 34,209,955$ 5,833,754$ 21%Increased DAR and MT service
Materials & Supplies 5,949,261$ 6,181,165$ 231,904$ 4%Increased fuel and parts
Services 4,270,744$ 4,325,535$ 54,791$ 1%
Other Expenses 10,156,437$ 10,542,009$ 385,572$ 4%Insurance growth
Total Operating Budget 93,245,222$ 102,028,908$ 8,783,686$ 9%
Salaries &
Benefits
46%
Contracted
Routes
34%
Materials &
Supplies
6%
Services
4%
Other
10%
FY24 Capital Budget
Capital Budget = $18,542,680
–Funding to purchase DAR buses
and hydrogen fuel cell electric buses
–Construction of the hydrogen fueling
stations
–Installation of solar panels
–Associated Transit Improvements
–Tire lease
–SB1 SGR Agency Improvements
–Maintenance capital parts
Funding sources:
–Federal 5307 and 5339
–State Transit Assistance
–Local Transportation Funds
–SB1 SGR
FY23 Major
Accomplishments
•Vine Street Mobility
Hub
•Implementation of Fare
Promotions
•Completion of the SSP
•Launch of GoMicro
•New fareboxes
•GoMobile
SunLine Transit AgencyFY24 –26 SRTP
Riverside County Transportation CommissionCSTAC MeetingApril 10, 2023
FY24 –26 SRTP OBJECTIVES
•Continuing to build back and evolve services
•Inclusive and balanced pandemic recovery plan
•Much depends on Operator levels and recruitment efforts
•Continuing to implement the Innovative Clean Transit (ICT) plan
•Transition to zero emissions by 2035 –five years ahead of the deadline set in ICT Regulation (2040)
•Innovative, flexible and adaptable remains our approach
FY24 –26 SRTP HIGHLIGHTS
•Working toward transitioning to regular service
•Step-by-step process requiring whole-of-agency effort
•Increasing advertising and recruitment activities that focus on obtaining more Motor Coach Operators
•Expanding and improving SunRide zones
•Focused on updating and enhancing service by soliciting and responding to rider input
FY24 –26 SRTP HIGHLIGHTS
•Enhancing our traditional recruitment by:
•Participating in local career fairs/events
•Securing ad space on City of Cathedral City’s digital billboard
•Securing ad space on the digital monitors at the Palm Springs DMV –hiring video now live
•9’ flags with “Now Hiring” going up at the Thousand Palms Hub
•Targeting recruitment efforts at Motor Coach Operators
•Rider’s Guide back cover focused on hiring Operators
ROUTES 1EV and 1WV
•Improve reliability –add more running time
•Standardize weekend frequency on Route 1EV & 1WV to every 30 minutes from current 20 minutes
•Weekday 20 minute peak and 30 minute off-peak will remain the same
•Add one more eastbound trip to Route 1EV in response to customer requests, 7 days a week
Route Frequency
Regular service (approved
Refueled plan)
Weekday Saturday Sunday
Effective May 7, 2023
Weekday Saturday Sunday
Effective January 1, 2023
Gurrent
1WV
Palm Desert Mall - Palm. Springs
(peak period 20 min service ""
7:00am to '"5: 0Opm)
E/W
20/30
20/30
20/30
20/30
30
30
20/30
20/30
20/30
1EV
Coachella - Palm Desert Mall
(peak period20 min service "'
7:00am to '"5:00pm)
E/W
20/30
20/30
20/30
20/30
30
30
20/30
20/30
20/30
2
Desert Hot Springs - Palm
Springs - Cathedral City (peak
period 20 min service "' 9:00am
to—5:00pm)
N/S
20/40
20/40
20/40
20/40
30
30
20/40
20/40
20/40
3
Desert Edge - Desert Hot Springs
Er'`'a"d
60
60
60
60
60
a6:
60
60
60
4
Palm Desert Mall - Palm Springs
E/V'J
40
60
60
60
60
60
60
60
60
5
Desert Hot Springs - CSUSB Palm
Desert -
Palm Desert Mall (peak only
service 3 AM&PM round trips)
N/S
60
NS
NS
60
NS
NS
6
tis
NS
6
Coachella - Via Fred Waring -
Palm Desert Mall
EPA:
45
60
60
60*
NS*
NS*
60
60
60
7
Bermuda Dunes - Indian Wells -
9a Quinta
N%S
45
90
9:
90
90
90
90
90
90
8
North Indio - Coachella -
Thermal/Mecca
N/S
40
60
6C,
60
6:
60
60
60
60
9
North Shore - Mecca - Oasis
E/W
60
60
60
60**
60'
HO.'
60
60
60
10
Indio - CSUSB-PDC - CSUSB -
San Bernardino Transit Center
(SBTC)/Metrolink
E/W
4
round
trips
NS
NS
4
round
trips
NS
NS
-
round
trips
NS
NS
NS: No Service
• Temporary aveekday peak only service between ~6:00 AM to 10.00 AM and ~2:00 PM to 6:OD PM, no weekend service
•• Temporary peak only service, ail week, ~ 6:00 AM to 10:00 AM and -2:0D PM to 7:00 PM
Sun[ ne
Hide to the
Future
Frequency improvements required to get to Regular Service
Thank You!
SHORT RANGE TRANSIT PLAN
2023/2024 –2025/2026
•Service since 1973
•Expanded to two routes in 1985
•Currently operates 3 Fixed Routes and Dial-a-Ride System
•Covers approx. 35 square miles
•Commercial and Residential areas of Banning and Cabazon
•Morongo Casino
•Beaumont
•Fleet: 6 Fixed Route Buses (2010-2017) and 3 DAR (2010-2018)
•CNG Station
•Field Supervisor, 8 F-T Drivers and an Executive Secretary (Dispatch)
FY 2023 PERFORMANCE REPORT
PERFORMANCE
INDICATORS
PROJECTED
PLAN
YEAR-TO-DATE %
Expenses $1,645,079 $1,256,702 76.4%
Fare Box Revenue $55,023 $48,993 89.0%
Passengers 63,245 70,008 110.7%
Farebox Recovery
(Estimated)
3.33%3.89%
Covid-19 Impacts
•Reduction in ridership
•2018 = 126,793
•2019 = 116,748
•2020 = 106,908
•2021 = 86,681
•2022 = 68,021
•2023 = 116,181 Projected
•2024 = 127,799 Projected
126,793
116,748
106,908
86,681
68,021
116,181
127,799
0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
FY18 FY19 FY20 FY21 FY22 FY23 FY24
PASSENGER TRIPS
March 2020
PROPOSED OPERATIONS BUDGET
FY 2024
TOTAL OPERATING REVENUE TOTAL FARE REVENUES
$2,003,300 $200,330
10.0% FAREBOX RECOVERY = 10.0%
TOTAL OPERATING BUDGET FARE RECOVERY
$2,203,630 10.0%
LTF SGR STA FARE
BOX LCTOP Other Local
Revenue
$1,913,300 $50,000 $40,000 $76,100 $50,000 $74,230
CAPITAL PROJECTS
FY 2024
Project #PROJECT DESCRIPTION BUDGET
24-01 Bus Replacement $850,000
24-02 Maintenance and Operations Facility Improvements $500,000
24-03 CNG Rehabilitation $1,000,000
24-04 Bus Stop Improvements and Transit Advertising $50,000
24-05 Transit Bus Wrapping Program $100,000
24-06 Electric Charging Infrastructure $750,000
24-07 Comprehensive Operating and Capital Needs Analysis $150,000
TOTAL $3,400,000
FY 2024 OPERATIONAL
HIGHLIGHTS
•Return of Ridership to Pre-COVID Level
•Advertising Program to generate revenue
•CNG facility; possible revenue generator
•Free fare promotion expansion
•Comprehensive Operations and Capital Needs
Analysis
•ZEB Pilot Program
THANK YOU !
SHORT RANGE TRANSIT PLAN
FY 2023/24 –2025/26
Services We Provide
•Curb to curb paratransit service for ADA passengers.
•4 Fixed Routes -Casino Express, 3, 4 & 3/4.
•2 Peak Service Fixed Routes -7 & 9.
•2 Commuter Links -120 & 125.
amazon
W 4th St
MAP NOT TO SCALE
Vineland St
Oak Valey Pkwy
Brookside Ave
1st Street
SYSTEM MAP
Legend
Casino Express
Route 3
Route 3/4
Route 4
Route 7-1
Route 7-2
Route 9
(951) 769-8530
www.beaumontca.gov
Commuter Link
Deviation
Interstate & Highways
Commuter Link 120 Commuter Link 125
San Bernardino
Transit Center
2nd Street
Rialto Ave
Loma Linda
Veterans Hos-
Benton
M
Redlands Transit Center
Redlands Blvd
February 2023
BEAUMONT
—CALIFORNIA—
Our Fleet
Fleet Size: 22 Units
11 units are in the process of being replaced.
2 units are zero-emission (battery electric).
Beaumont is currently finalizing its Zero-Emission Bus Rollout and
Implementation Plans.
Ridership Report 175,013 176,546
103,757
23,494
55,585
71,982 79,180
-
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23
Projected
FY 23/24
Proposed
Fixed Route Service
12,443
18,252 17,567
13,636
10,464 11,426
12,569
-
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
18,000
20,000
FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23
Projected
FY 23/24
Proposed
Commuter Service
10,211
8,862
5,820
2,071 2,408
3,646 4,011
-
2,000
4,000
6,000
8,000
10,000
12,000
FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23
Projected
FY 23/24
Proposed
Dial-A-Ride Service
197,667 203,660
127,144
39,201
68,457
87,054 95,759
-
50,000
100,000
150,000
200,000
250,000
FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23
Projected
FY 23/24
Proposed
Systemwide Passengers
Performance Report
Performance
Indicators
Plan Year-To-Date
(Jul -Feb)
Year End Projection
Expenses $2,771,617 $1,632,031 $2,548,046
Revenues $322,000 $202,863 $304,860
Passengers 77,007 61,344 87,054
Farebox Recovery
(All Routes:
Estimated)
11.62%12.43%11.9%
Operating Budget
Funding FY 23 Plan FY 24 Proposed
LTF $2,449,617 $2,656,495
Measure A $140,000 $169,000
Farebox $70,000 $21,025
LCTOP $62,000 $129,149
Other $10,000 $18,000
Total Budget $2,771,617 $2,993,669
Farebox Recovery Ratio
(All Routes)
10.32%11.26%
12.41% Farebox Recovery (With Exemptions)
Capital Budget
Project Description Amount
7 -32’ EZ Rider II CNG Buses $6,350,000
3 Support Vehicles $120,000
Bus Stop Improvement Plan $40,000
Bus Stop Improvements and Amenities $60,000
Increasing trips to Redlands on the Commuter 125.
Expanding service area on the Casino Express and Route 7.
Adjusting timepoints on the Route 3.
Incorporating a fare increase as recommended in our COA.
Continuing to clean and sanitize the fleet.
Service Updates
Project Updates
Zero-Emission Bus Rollout Plan -Currently being finalized for submission this June.
Zero-Emission Implementation Plan –Goal for completion is November.
Planning to launch a 3-year discounted fare promotion through the LCTOP program this August.
4th & Veile master plan is currently in the development phase.
GPS and passenger prediction software has been fully implemented.
Micro-transit Feasibility Analysis –Goal for Completion is December.
Future Travel Training Locations
Downtown
Disney
LA Union
Station
San
Clemente
Stay Tuned for Future Dates
Questions
1
Sudesh Paul
Transit Program Manager
April 10, 2023
FY 24-FY26
Short-Range
Transit Plan
CSTAC Meeting
2
Services Provided▷Corona Cruiser, fixed route▷Blue Line & Red Line▷Citywide Dial-A-Ride (DAR) ▷For all seniors and persons with disabilities▷DAR provides complementary paratransit
in compliance with ADA ¾ mile corridor▷Operate on weekdays and Saturdays▷20 vehicles in fleet (13 DAR; 7 Cruiser)
Service Pre-COVID
FY 18-19
FY19/20 FY20/21 FY 21/22 FY 22/23
Estimate
DAR 52,580 39,989
30.4%
13,386
66.8%
22,673
69.4%
33,400
47.3%
Cruiser 118,366 100,186
18.1%
76,645
23.5%
95,892
25.1%
113,400
18.2%
Ridership Data
-
20,000
40,000
60,000
80,000
100,000
120,000
FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23*
Corona Cruiser DAR
FY 23/24 Transit Operating Budget
$3.4 Million Operating Budget
•Contracting Services 85%
•Contracted Transit Operations
•Maintenance Oversight Services
•Consulting Services
•Salaries & Benefits 5%
•Fuel 7%
•Materials & Supplies 3%
4
Contracted Services
Fuel
Salaries &
Benefits Materials & Supplies
Current Year Updates
5
▷PROJECTS IN PROGRESS▷Comprehensive Operations Analysis for
service enhancements and operational
efficiency▷Vehicle Maintenance Oversight▷Zero-emission Bus Rollout Plan▷CHALLENGES▷Continued impacts of COVID-19; ridership
slowly recovering▷Competing priorities make it difficult to fast-
track projects
COA –Service Alternatives Objectives
COVERAGE
Expand access to
more destinations.
RELIABILITY
Update schedules
to improve
reliability.
PRODUCTIVITY
Increase ridership
through various
service
enhancements.
COST
Provide services
that are sustainable
and within
projected budget
enhancements.
1 432
7
SCENARIO 1▷One (1) Fixed Route ▷Citywide Microtransit▷Cost increase by 40%
8
SCENARIO 2▷Three (3) Fixed Routes ▷Two (2) Microtransit
Zones with ten (10) key
destinations▷Cost increase by 15%
Future Improvement Plans
Continue marketing
efforts by engaging
the public.
Planning for
implementation of
new routes and
micro transit service.
Start procurement
activities for capital
projects:
•DAR bus purchase
•Intelligent
Transportation System
9
Thank you!
Sudesh.Paul@CoronaCA.gov
www.CoronaCA.gov/transit
Palo Verde Valley Transit Agency
Short Range Transit Plan FY23/24
The PVVTA serves the City of Blythe and
the Eastern most unincorporated areas of
Riverside County including Mesa Verde
and Ripley with six deviated fixed routes
and a TRIP Reimbursement Program
In regular operation PVVTA used 6 buses in revenue service
with 3 buses as spare.The current average life of the revenue
vehicle fleet is 3.5 years old.Most vehicles possess a 20/2
passengers capacity.All vehicles are ADA compliant and
PVVTA purchases a new revenue vehicle every year on average.
Budget & Plan Changes
•Continued increase based on “normal” service in comparison to FY23 year due to
new operator contract and finance system
•Reintroducing the reduced fare program from LCTOP for $300,000
•Use of 5311 and ARPA for operating assistance ($485,568)
•Ridership has reached passenger counts higher than those pre-Covid and efforts
must be made to maintain ridership
Post Pandemic
•In FY 22-23 PVVTA has seen a near double increase in ridership
from the previous year
•The system’s free fare services paid by LCTOP have reached its end
in February 2023
•Establish complete services that were available in pre-Covid19
•Reestablish reduced fair program to aid community
•Fare relief helped passenger counts increase consistently but
PVVTA must maintain passenger count before more relief is received
Anticipated Projects
•PVVTA to undertake agency rebranding project to refresh image
and mission of agency ($40,000)
•CNG Replacement Bus ($220,000)
•Acquisition of Electric Forklift to assist utilities ($20,000)
•Facility Maintenance Improvements for acclimatization ($60,000)
•Finalizing implementation of new finance system to streamline
reporting procedures for team
Future Outlook
•Increased efficiency in ridership tracking
•Retain ridership
•Look into administrative technology upgrades
•Implement hydrogen systems for the fleet
•Expand on maintenance facility?
•Establish PVVTA’s new image in community
Questions?
RiversideCa.gov
1
RiversideCa.gov
Special Transportation’s Short
Range Transit Plan Overview
Parks, Recreation, and Community Services Department
Citizens and Specialized Transit Advisory
Committee
April 10, 2023
RiversideCa.gov
2
The City of Riverside’s Special
Transportation Program was
established in 1975 and works
under an agreement with the
Riverside Transit Agency (RTA)
to operate a Paratransit (origin-
to destination) Service within
the Riverside city limits.
Providing Transportation Services to Seniors over 60 and the Disabled
Community around the City for 48 Years
RiversideCa.gov
3
PRCSD –Special Transportation Division
23 -Bus Drivers
5 -Dispatcher/Scheduler
2 -Operations Supervisors
1 –Senior Office Specialist
1 –Senior Management Analyst
1 –Transit Manager
Transit Personnel
RiversideCa.gov
4
•34 –16 Passenger Cutaway ( Ford E-450)
•2 –9 Passenger Ford Transit Vans
•1 –NorCal Van (Dodge)
•1 –Admin Car (Honda)
Transit Fleet
RiversideCa.gov
5
Miles
Traveled
Established in 1975
7 Days/ 363 Days per year
36 Mini-Buses
250-300 rides per day
(Pre COVID = 400 –500 rides per day)
Service Area
81.54 Sq. Miles
Medical/Dialysis
Appointments Shopping
Disabled Seniors Over 60
Workshops /
Employment
On Time
Performance
Restaurant/
Social Events
369,209
FY2021-22 98.6%
26,153
FY2021-22
22,985
FY2021-22
FY19-20 = 44,737 FY19-20 = 37,103
FY19-20 = 475,855
48
Who do we serve and what do we do…
RiversideCa.gov
6
Current Statistics
42,290 Trips
271,328 miles
So far in Fiscal Year 2022-2023, Riverside Connect has…
Traveling
18,932 Seniors
23,358 ADA
RiversideCa.gov
7
Budget Item
FY 2022/23 FY 2023/24 Variance
Plan Plan
Salaries & Benefits $2,374,410 $3,162,857 33.21%
Materials & Supplies $52,494 $51,725 -1.46%
Fuel $225,000 $225,000 0.00%
Maintenance $400,000 $400,000 0.00%
Contract Services $126,263 $125,000 -1.00%
Non-Personnel Costs $1,132,165 $1,302,687 15.06%
Total $4,310,332 $5,267,269 22.20%
Operating Budget
RiversideCa.gov
8
•Ongoing challenge with decreased
service demands.
•Staffing
•Infrastructure for zero emission fleet
•Ability to meet Farebox Recovery Ratio
Challenges…
RiversideCa.gov
9
•Continued marketing of the service.
•RFP for a new Scheduling Software System
•Comprehensive Operational Analysis of
program.
•Mobility on Demand
•Future Rate Increase
Moving Forward…
RiversideCa.gov
10
Questions or Comments???
Thank You
Questions?
RCTC RAIL PROGRAM
FY 23-24 Short Range Transit Plan (SRTP)
Citizens & Specialized Transit Advisory Committee (CSTAC)
April 10, 2023
1
RCTC Routes
APRIL 11, 2022
2
•Riverside Line
–Weekdays: 11 Daily Trains
–(Short 1 off peak train)
•91/PV Line
–Weekday: 12 Daily Trains
–Weekend: 4 Daily Trains
•IEOC Line
–Weekdays: 14 Daily Trains
–(Short 1 off peak/1 reverse)
–Weekends: 4 Daily Trains
Metrolink FY 24 Highlights
3
•Continued slow ridership recovery
•Potential service restoration to 100% pre-Covid levels,
routes and schedules to be determined for Oct 2023
•No Fare Increases
•Continued Promotions and Marketing Efforts
•• Operating Revenue -$54.2M
•• Decrease from FY23 of $12.3M or 18.5%
•• Total Expenses -$314.5M
•• Increase from FY23 of $18.2M or 6.1%
•• Member Agency Support -$260.3M APRIL 10, 2023
Metrolink Overall Budget Highlights
4
•Operating Revenue -$54.2M
–Decrease from FY23 of $12.3M or 18.5%
•Total Expenses -$314.5M
–Increase from FY23 of $18.2M or 6.1%
•Member Agency Support -$260.3M
–Increase from FY23 of $30.5M or 13.3%
•• Operating Revenue -$54.2M
•• Decrease from FY23 of $12.3M or 18.5%
•• Total Expenses -$314.5M
•• Increase from FY23 of $18.2M or 6.1%
•• Member Agency Support -$260.3M
•• Increase from FY23 of $30.5M or 13.3%APRIL 10, 2023
5
APRIL 10, 2023
Metrolink Recovery Plan
6
•Campaigns
–Free Fare Transit Equity Day
February
–Customer Appreciation Day
February
–Free Fare Earth Day
April
–Summer Travel Campaign
May -Sep
•Fare Promotions
–Summer Adventure Pass :
$15 systemwide weekday pass,
Memorial Day through Labor Day
–Expanded Student Discounts
APRIL 10, 2023
RCTC Recovery Plan
7
Marketing and Outreach
-Community Events
-How-to-ride Presentations
-Group Excursions
APRIL 10, 2023
Discounted Fare Programs
8
•RCTC’s LCTOP
–Riverside County Free Rail
Pass Program
–$2.4 Million (+$1M More)
–Partnership between RCTC’s IE
Commuter & SBCTA
–Timeframe: 2 year minimum
–Beginning in Summer/Fall 23
•Metrolink’s LCTOP
–Low Income Pilot
Program
•50% discount for low-
income riders
–$5.7 Million
–Incorporating EBT Card
technology in TVM’s
–Developing new College
Free Fare Program
APRIL 10, 2023
Capital Projects
APRIL 10, 2023
9
•Moreno Valley/March Field Station Upgrade
–Construction phase
•South Perris Station Double Track and Platform
–Design phase
•Perris Valley Line Double Track (6 Miles)
–Design phase
•Riverside-Downtown Station Track and Platform Project
–Environmental Review (Project Suspended)
QUESTIONS?
10
RCTC VANCLUB
Brian Cunanan
Commuter & Motorist Assistance Manager
1
Citizens and Specialized Transit Advisory Council
April 10, 2023
What is a Vanpool?
•Sponsored by a public agency
•7 to 15 passenger vehicles
•Routes marketed to and
open to the public
•ADA accessible
FTA recognizes
vanpool as
a transit mode
3
Minimum Qualifications
•Minimum 5 participants to start
•Minimum 30+ miles commute per day
•Commute 12+ days per month
•Western Riverside County destination
VanClub Provides $400 per month
subsidy to help with lease costs from approved providers
4
Toyota Sienna
Chevy TraverseFord Explorer Dodge Durango
Dodge Caravan
Ford EconolineFord Transit
Vanpool Lease includes:
–Vehicle
–Maintenance
–Insurance
–Roadside assistance
SAVE
TIME
Access to
carpool lanes
SAVE TIME &
MONEY
Free or
reduced tolls
COMMUTE
GREEN
Reduced SOV
emissions
DRIVE LESS.
SMILE MORE.
Higher quality
of life
vs. SAVE MONEY
Estimated $833 savings per month
with VanClub subsidy
$10K savings per year*
* Irvine to Riverside scenario, 100 roundtrip miles each day, 20 days each month with 5 passengers.
Why VanClub?
6 6
41 VanClub Vanpools
•4.5 riders per trip
•49.7 miles per trip
•19.0 days per month
•$1,251 average monthly lease
•$305 monthly “fare”
(out of pocket costs with subsidy)
Lifetime program farebox return of 70.9%
Fiscal Year 2023/24
7
•Seeking approval to increase
subsidy to $600 per month
•Projecting 81 vanpools by
fiscal year end (164K trips)
•Projected $776K budget
8 8
Program performance since inception (through February 2023)
emissions reductions
5,449 tons
•397K trips reduced
•14.5M VMT reduced
QUESTIONS, DISCUSSION
9
RCTC
RIVERSIDE
COUNTY
TRANSPORTATION
COMMISSION
MIN
Investing in Our Highways and Roads
Funded 7 local bus
systems and 15
specialized transit
services
Approved Rail Ridership
Recovery Program to allow free
Metrolink rides for Riverside
County residents to start in 2023
arm
Continued construction
of 15/91 Express
Lanes Connector
Allocated $126 million
in Measure A funding for
248 local road projects
Supported
10,513
construction jobs
Received $5 million
in Congressional
Community Project
Funding to advance 1-15
Smart Freeway Project
Opened 5 highway projects: 91 Corridor Operations Project,
1-15 Railroad Canyon Interchange, Route 60 Truck Lanes,
1-15 Interim Corridor Operations Project,
1-215 Placentia Interchange
Improving Our Public Transit System
Certified program -level
environmental document for
Coachella Valley Rail service
Conducted 25
Metrolink station
construction/
maintenance projects
This year has been one of project delivery. For the first time in RCTC's 46 -year
history, we opened a total of five highway projects and made significant progress
toward advancing a transformational new passenger rail system, Coachella Valley
Rail. Efforts also continued to support ridesharing and other mobility choices, fund
local road projects, preserve land for native plant and animal species, advocate
for the funding we deserve in Riverside County, and to listen to residents and
stakeholders to improve our region's quality of living.
Total value of projects
under construction:
$879 million
Helped 63,550 motorists
in need with Freeway Service
Patrol and call box service
Supplemented transit network in Riverside County with nearly
40 subsidized VanClub vanpools reducing 55,650 single
occupancy trips and 2.1 million vehicle miles traveled
Advancing Transportation Projects
Submitted state and federal
grant applications to fund
Coachella Valley Rail project -
level studies
ae
Began final design for Mid
County Parkway Ramona
Expressway
Awarded construction contract
for 71/91 Interchange
Offering Drivers Choices
Recorded 19.8 million 91
Express Lanes trips and 23.5
million 15 Express Lanes trips
Engaging with Residents
Expanded rctc.org website
visits to an average of
53,862 per quarter
111
Marked
5 years of service
for Riverside County
91 Express Lanes
Posted 58 stories to
The Vista blog and
distributed 34 news
releases
Protecting our Environment
Supported 592 employers
with ridesharing programs
Managed Western Riverside
County Regional Conservation
Authority and preserved habitat
for 146 native animal and
plant species
Reduced 7.2 million pounds of
vehicle emissions through
IE Commuter and VanClub programs
Added 2,445 acres of protected
habitat on behalf of the Western
Riverside County Regional
Conservation Authority for a total of
44,622 acres conserved by local
sources. This is 46% of the 97,000
acres to be acquired locally
Awarded $4.4 million grant from the U.S. Fish and Wildlife
Service and eligibility for $2.3 million in matching grant funds
from the California Wildlife Conservation Board for conserving land
Began construction
of Moreno Valley/
March Field Station
improvements
Submitted state grant applications
to build Metrolink Double Track
Project on 91/Perris Valley Line
and Mid County Parkway
Ramona Expressway
Maintained 161,821 accounts
for 91 Express Lanes customers
and 11,609 accounts for
15 Express Lanes customers
Increased @therctc social media
presence to 13,004 Facebook
followers, 1,613 Twitter followers,
and 2,758 Instagram followers
Received $25 million state
grant for 91/Perris Valley Line
improvements
Launched $5 per day transit/
rideshare Incentive with expanded
eligibility to eastern Riverside County
Began environmental and engineering
studies for 1-10 Highland Springs
Interchange; continued studies
for 1-15 projects and Riverside -
Downtown Station
Provided 5,500 commuters
with car/vanpool matches, transit
options, and IE Commuter
incentive information
Secured 2,278 text
message subscribers
and 6,233 newsletter
subscribers
14,
Supported 70 agricultural
vanpools with safe and reliable
transportation to harvest areas
in Riverside County
&Q8
Launched new RCA
Stakeholders Committee
and continued Citizen
& Specialized Transit
Advisory Committee
Assisted 169,300 web visitors and 60,826 callers with real-time
traffic, transit, and rideshare information through 511 service
(951) 787-7141 • www.rctc.org
RCTC.org 4080 Lemon Street, 3rd Floor
P.O. Box 12008, Riverside, CA 92502-2208
RIVERSIDE
COUNTY
TRANSPORTATION
COMMISSION
Inversion en autopistas y carreteras
Seguimos en la construction
del Conector de las vias
rapidas 15/91
(Express Lanes)
Destinamos $126 millones
de inversion de la Medida
A para 248 proyectos de
carreteras locales
Apoyamos
10,513 empleos
de construction
Recibimos $5 millones del
Congreso para la inversion
para proyectos comunitarios
para adelantar el proyecto las
autopistas inteligentes 1-15
Este ano nosotros entregamos proyectos. Por primera vez en los 46 anos de la historia
de RCTC, hemos completamos un total de cinco proyectos de autopistas y progresamos
notablemente en fomentar un nuevo sistema de trenes de pasajeros transformador: el
Coachella Valley Rail. Ademas, siguieron los esfuerzos para apoyar los viajes compartidos
y otras opciones de movilidad, invertir en proyectos de carreteras locales, preservar la
tierra para especies nativas de animales y plantas, abogar por la inversion que merece
el condado de Riverside y escuchar a los vecinos y alas partes interesadas en mejorar la
calidad de vida de nuestra region.
Costo total de
los proyectos en
construction:
$879 millones
Asistimos a 63,550
conductores en problemas
con la patrulla de servicios
de autopista y el servicio de
telefonos publicos
Iniciamos 5 proyectos de autopistas: Proyecto de operaciones del corredor 91,
intersection de la I-15 Railroad Canyon, carriles para camiones en la ruta 60,
proyecto de operaciones del corredor provisorio de la 1-15, ter/
intersection de la 1-215 Placentia
Mejora del sistema de transporte publico
Hemos certificamos el
programa a nivel ambiental
para el servicio Coachella
Valley Rail
Llevamos a cabo 25
proyectos de estaciones
Metrolink de construction
o mantenimiento
Financiamos 7 sistemas
de autobuses locales
y 15 servicios de
transporte especial
Complementamos la red de transports en el condado de Riverside con casi
40 viajes compartidos de VanClub subsidiados, reduciendo 55,650 viajes
individuales y 2.1 millones de millas recorridas por vehiculos
Fomento de proyectos de transporte
Presentamos solicitudes de
subvention federales y estatales
para financier los estudios a
nivel de proyecto de
Coachella Valley Rail
Iniciamos el diseno final
para Mid County Parkway
Ramona Expressway
71 91 Otorgamos el contrato de construction
para la intersection 71/91
Oferta de opciones para conductores
Rg
Registramos 19.8 millones
de viajes en 91 Express
Lanes y 23.5 millones
viajes en 15 Express Lanes.
Cumplimos
5 anos de servicio para el
condado de Riverside en
91 Express Lanes
Compromiso con los residentes
Aumentamos las visitas al sitio
rctc.org a un promedio de
53,862 cads tres meses
Publicamos 58 stories
historias en el blog The
Vista y distribuimos 34
comunicados de prensa
Protection del medioambiente
Financiamos a 592
empleadores con programas de
viajes compartidos
Administramos la Autoridad
de Conservacion Regional del
Condado de Western Riverside,
y preservamos el habitat de
146 especies nativas
de animales y plantas
Redujimos 7.2 millones de libras
de emisiones de vehiculos con los
programas de viajes compartidos
IE Commuter y VanClub
Sumamos 2,445 acres de habitat
protegido en el nombre de la
Autoridad de Conservacion Regional
del Condado de Western Riverside
por un total de 44,622 acres
conservados por fuentes locales. Esto
representa el 46% de los 97,000
acres que seran adquiridos en la zone.
Otorgamos $4.4 millones de subvention del Servicio Federal de Pesca y
Vida Silvestre y la posibilidad de $2.3 millones en subvenciones paralelas de la
Junta de Conservacion de la Vida Silvestre de California para conservar la tierra
Comenzamos la
construction para las
mejoras estacion
Moreno Valley/
March Field
Presentamos solicitudes de
subvention estatales para construir el
proyecto de via doble de Metrolink
en la lines 91 de Perris Valley y
Mid County Parkway Ramona
Expressway
Mantuvimos 161,821
cuentas para usuarios de 91
Express Lanes y 11,609
cuentas para usuarios de 15
Express Lanes
f O
Aumentamos los seguidores de
@therctc en redes sociales a
13,004 en Facebook, 1,613 en
Twitter y 2,758 en Instagram
Aprobamos el Programa de
recuperation de Sistema de
transporte de pasajeros por tren
para para que los residentes del
condado de Riverside viajen gratis
en Metrolink a partir de 2023
Recibimos $25 millones
de subvention estatal para
mejorar la lines 91 de
Perris Valley
Lanzamos el incentivo de $5 diarios para
transporte publico o viajes compartidos con
acceso extendido al este del condado de Riverside
Iniciamos estudios ambientales y de
ingenieria para la intersection 1.10
Highland Springs; continuamos los
estudios para los proyectos
de la 1-15 y la estacion Riverside -
Downtown
Brindamos opciones de
transporte, companeros de
vanpool o carpool e information
del incentivo IE Commuter a
5,500 pasajeros
Logramos 2,278
suscriptores a SMS y
6,233 suscriptores
al boletin de noticias
Financiamos 70 vanpools
agricolas con transporte
seguro y confiable a zonas de
cosecha en el condado
de Riverside
8R8
Lanzamos el nuevo Comite de
Partes Interesadas del RCA
y continuamos con el Comite
Asesor de Ciudadania y
Transporte Publico Especial
Atendimos 169,300 consultas web y 60,826 Ilamadas con
information en tiempo real de trafico, transporte publico, y viajes
compartidos con el servicio 511
(951) 787-7141 • www.rctc.or
.11111.11
RCTC.org 4080 Lemon Street, 3rd Floor
P.O. Box 12008, Riverside, CA 92502-2208
RIVERSIDE COUNTY TRANSPORTATION COMMISSION
CITIZENS AND SPECIALIZED TRANSIT ADVISORY COMMITTEE
ROLL CALL
APRIL 10, 2023
Present Absent
Lisa Castilone X
John Chavez X
George Colangeli X
Alejandra Gonzalez X
John Krick X
Jack Marty X
Mary Jo Ramirez X
Gloria J. Sanchez X
Ivet Woolridge X
Riverside Transit Agency X
SunLine Transit Agency X