HomeMy Public PortalAbout2008-39 Approving Work Authorization with Corzo Castella Carballo Thompson Salman, P.ARESOLUTION NO. 2008-39
A RESOLUTION OF THE VILLAGE COUNCIL OF THE
VILLAGE OF KEY BISCAYNE, FLORIDA, APPROVING
WORK AUTHORIZATION FOR THE SERVICES OF THE
FIRM OF CORZO CASTELLA CARBALLO THOMPSON
SALMAN, P.A. ("C3TS"); PROVIDING FOR C3TS TO
PERFORM FINAL DESIGN, PREPARATION OF
CONSTRUCTION DOCUMENTS, AND CONSTRUCTION
ADMINISTRATION SERVICES IN CONNECTION WITH
CHANGE ORDER NO. 1 TO THE TRANS FLORIDA
DEVELOPMENT CORP. ZONE 2/3 WATER & SEWER
CONTRACT; PROVIDING FOR IMPLEMENTATION;
PROVIDING FOR EFFECTIVE DATE.
WHEREAS, pursuant to Resolution No. 98-34, the Village of Key Biscayne (the "Village")
has previously entered into a series of continuing contracts with engineering and architecture firms
for necessary services; and
WHEREAS, the engineering, architecture and planning firm of Corzo Castella Carballo
Thompson Salman, P.A. ("C3TS") is under a continuing contract to the Village as authorized by
Resolution No. 98-34, and has provided professional services to the Village on several projects in
a timely and efficient manner; and
WHEREAS, the Village finds that it is in the best interest of the Village to utilize C3TS for
the purpose of performing final design, preparation of construction documents, and construction
administration services in associated with Change Order No. 1 to the Trans Florida Development
Corp. Zone 2/3 Water & Sewer Contract (the "Project") in accordance with the attached Work
Authorization attached to this Resolution.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE VILLAGE
OF KEY BISCAYNE, FLORIDA, AS FOLLOWS:
Section 1. Recitals Adopted. That each of the recitals stated above is hereby adopted
and confirmed.
Section 2. Work Authorized, Limitation on Funds.
A. That pursuant to the existing continuing contract between C3TS and the Village, the
performance of additional engineering and related services (the "Engineering Services"), as
described above and as described in the attached Work Authorization, dated July 8, 2008, is hereby
approved and authorized for the Project.
B. That the total fees and costs for the services authorized pursuant to the Work
Authorization shall not exceed Twenty Nine Thousand Six Hundred and Fifty Dollars ($29,650), in
the absence of further Council authorization.
Section 3. Work Authorization Approved.
A. That the Village Manager is hereby authorized to execute the Work Authorization,
in substantially the form attached hereto, for the accomplishment of the Engineering Services which
are authorized hereunder, once approved by the Village Attorney as to form and legal sufficiency.
Section 4. Implementation. That the Village Manager is hereby authorized to take any
and all action which is necessary to implement the purposes of this Resolution and the Work
Authorization.
Section 5. Effective Date. That this Resolution shall be effective immediately upon
adoption hereof.
PASSED AND ADOPTED this 8th day of July, 2008.
(signatures appear on the next page)
2
MAYOR ROBERT L. VERNON
CONCHITA H. ALVAREZ, CMC, VILLAGE CLERK
APPROVED AS TO FORM AND LEGAL SUFFICIENC
VILLAGE ATT • R
3
1
C G' 7 C)
CAS1 E LLA
CA RBA Lt C)
Ti-iC111 PSON
SAL MAN
CM
Engineers
Architects
Planners
FF10005022
AAC002142
WORK AUTHORIZATION
July 8, 2008
Village of Key Biscayne
88 West McIntyre Street
Key Biscayne, Florida 33149
Attention: Chip Iglesias, Village Manager
Reference: W. McIntyre Street/Glenridge Road/Ridgewood Road Improvements
Final Design and Construction Phases
Village of Key Biscayne, Florida
Dear Mr. Iglesias:
The firm or Corzo Castella Carballo Thompson Salman, P.A. (C3TS) is pleased to submit this
proposal for professional services for the Village of Key Biscayne to perform the final design,
preparation of construction documents, and provide construction administration services for this
project associated with Change Order No. 1 to Trans Florida Development Corp. under the
Zone 2/3 Water & Sewer Contract.
I. Scope of Services
Task A. Final Design and construction documents.
Supplementary engineering survey, final design and preparation of construction documents for
all project elements including plan and profile, typical section, grading plans, tree planting plans,
construction details, pavement markings and signage plans.
Task B. Construction Administration
During the construction phase of the construction above, it is our understanding that C3TS will
provide Construction Administration services as follows:
■ Shop drawing review.
• Respond to Contractor request for information (RFl) and clarification/
interpretation of contract documents.
■ Coordinate utility concerns and issues with regard to conflicts.
• Provide inspection services.
• Provide final inspection.
• Coordinate materials and density testing.
II. Fees
The total fees for this project have been calculated in the attached Manhour Estimates
spreadsheet. The fee for these services is broken down as follows:
Task A — Final Design & CD's $22,440
Task B — Construction Administration $ 7,210
Fee Total Lump Sum $29,650
901 Ponce de Leon Blvd., Suite 900 Coral Gables, Florida 33134 305 445 2900 1.800.448.0227 Facsimile 305.445.3366
Web Site: www.c3ts.com Equal Opportunity Employe!
Work Authorization
McIntyre St./Glenridge Rd/Ridgewood Rd Improvements
Village of Key Biscayne
July 8, 2008
Page 2
Ill. Insurance; Indemnification
C3TS shall maintain liability insurance related to the work undertaken by it hereunder, including
the Village as Certificate Holder and additional insured for this work. Further, C3TS shall
indemnify and hold harmless Village, its officers and employees in accordance with and as
authorized by Section 725.08, as if said statute was incorporated herein verbatim.
This proposal will be subject to the terms of the signed Agreement between the Village of Key
Biscayne and C3TS, PA., for Professional Services dated 07/15/98.
If you have any questions, please do not hesitate to give me a call at (305) 445-2900 or e-mail
at rcastellae,c3ts.com. We thank you for the opportunity to offer these services, and look
forward to our continued working relationship with the Village.
If this proposal is deemeo'cceptable to all parties, please sign in spaces provided.
Chip Igl las
Village Manager
Village of Key Biscayne
L:1Projects11108-001W .O-Proposals\W O070808McIntyreGlenridg eRidg ewood.doc
Ramon Castella, P.E.
PrincipalNice President
C3TS, P.A.
Corzo Castella Carballo Thompson Salman, P.A. Fee Worksheet - Page 1
DATE:
PROJECT:
Task A - Final Design Phase:
FEE WORKSHEET
July 2, 2008
W. McIntyre Street /Glenridge Road / Ridgewood Road Improvements
Final Design & construction phase services
Village of Key Biscayne
F'. ::.., ; • ._''- -::',0,....•; ; •:k'T ; is . ,; . _ .
F?rin
';-,"•;PE/ #�A.r ��,
; EI/Al..
r: T00h.
'Tech=
.� . �
. l C i I ,
Sri a
Roadway and Drainage
Typical Sections 0 sheet)
2
4
8
4
12
2
Plan & Profile Sheets (3shts @ 1"= 20')
4
8
16
12
36
Special Plan Details (1 sheet)
2
4
8
12
12
Special Profiles (1 sheet)
2
6
12
8
12
Notes, Details & Schedules (2 sheets)
2
4
8
4
6
4
Demolition Plans
2.
4
2
4
,Landscaping
Planting Plans (3 sheets)
2
4
8
6
12
2
Details, notes and schedules
2'
4
4
8
2
4
General
Coordination and Review Mtgs.
8
4
4
4
Final Design Phase Sub -Total Hours
24
40
72
56
96
16
Billing Rate
135
95
80
65
55
45'
Labor Cost
$3,240
$3,800
$5,760
$3,640
$5,280
$720
Labor Sub -Total
$22,440
Task B - Construction Phase:
- ' ,: ,' '} ; " , . . .T isk=:: ". .. ,°
Prin'
PE/RA/CM'
' . El/AI
lisp.' `. '
' ; c er�iccal .
Shop Drawing Review
2
4
4
4
Periodic Inspection - conc forming & drainage
4
6
12
48
6
Final Inspection
4
4
4
4
Construction Phase Sub -Total Hours
8
12
16,
56
14
Billing Rate
135
95'
80
55
45
Labor Cost
$1,080
$1,140
$1,280
$3,080
$630
Labor Sub -Total
$7,210