Loading...
HomeMy Public PortalAbout01-30-1911 (2)Yonday January �Oth, 1911. �� The Board meets to hear all personsinterested ior lrnprovem� property Im affected Re the iollNO. 2 p nt: Improveaent Resolution NO. 242-1911, providing for the construct- ion of a sanitary sewer in the allPv between South loth & llth running from the Pouth 'H• Street Trunk Sewer south to South ■ �te� After Y,earing all persons rho appeared and being fully advieedlt the premises, the Board de eldes teat the benefits to the property liable to be assesed for said lmprovenents are equal to the esti- mated cost of the same as reported by the City civil Engineer and thereupon takes final action on said resolution as originally ad- opted, the sane being confirmed without riodificdtion. The Board receives bids for the Improvement of South 2nd Street from gain St, to South 'A• Street, by constructing cement sidewa$. on the west side of said street & cement curb & gutter on both aides thereof between the points nar.ed, as provided for by Improve. ment Resolution 1:0. 228-19109 as follows: - Boots & Gant, Bid ■Cement Sidewalk - - - - .70 ){. per lineal foot 'Cement intersections - - .15 ° " square ■ •Roadway & alley crocsing - - 15 " ■ ■ 'Cement Curb & Gutter - - - .65 " " lineal ■ 'Cement Circle Curb & Gutter - .70 + ° ' ■ A. F. Hooton, Bid 'Cement Sidewalk - - - - .13..3/4 per square foot ■Intersections - - - _ 1F4 3 4 ° ° ° ■ 'Curb & Gutter - - - _ 73 ■ lineal foot •Circle curb & Gutter - - - .82 ■ ■ + ' •Crossings - _ _ _ _ 019 ■ + square ' Daniel G. Burkhardt, Bid •5 foot Cement sidewalk comp -lets - .58 per lineal Foot ■Curb & Gutter straight- - _ 068 Circle Curb & Gutter - _ _ ,85 + ° • • •Alley & Sidewalk intersections - .12 ° " square ' 05 foot Cross -walks - _ _ .75 lineal ' Schneider Bros., Bid 95 foot Walk - _ _ .55 per lineal foot 'Straight Curb & Gutter " ■ ' ' 68 ■Circle Curb & Gutter - .68 ■ + ' ' "Cement roadway on alley _. _ 012 ■ ■ square ' 'Cement Walk intersections 1.2 ° + ■ ' 'Geeent Cross -walks 5 ft.tvide 0lineal ° Prioicf, If rock Is found in gra(ling forcer.ient work will be extn 2.00 per cubic yard, Contract awarded to Schneider Bros., The Board receive3 bids for the improvement of North 13th Street from North Street to ?forth •H' `street by constructing cement sidewalk 6 Peet in width on the west side thereof, between the_ 1910 Points named, as Provided for by Improvement Resolution No•231 , as follows:_ A. F. Hooton, bid: Cement Sidewalk _ j'Opt Cement Crossings _ - - .13 4 per square ■ Boots & Gant, Bld. - - - .15 + + .0ep,ent Sidewalk 6 feet wide _ per lineal cot Cement Crosswalks .78 p. Pal foot J• Y. C01'fe - - - 15 ° square f 'Cement y' Bid: siuewalk _ _ 'Cement rrosa-walka _ _ _ .15 per square foot 18 Monday January .:loth, 1911. Aids on 231-1!r10, continued: Sohneider Bros, Bid: - 'Cement Sidewalk 6 feet In width - ,Cross -walks 5 feet in width _ _ :66 Per lineal foot Daniel G. Burkhardt, Bid:- ■ ,Cement Sidewalk 6 feet in width - _ ,Cement Cross -walks 5 feet 1n xidth _ :70■ 0 Per lineal feet The bid of Daniel G. Burkhardt being the lowest and within tre,eatiz ate of the Gity Civil )ngineer, on motion the contract was awarded to the said Daniel G. Burkhardt, The Board receives bids on the Improvemett of South loth Street, from Lain Strut to South 'A" Street, by crnstructing cement sire - walks on both sides thereof, between the points named, as provided for by Improvement Resolution No. 232-1910, as follows: - A. F. Hooton, Bid: 'Cement sidewalk - - - - .12 3/4 cts.per square foot 'Alley Crossings - - - - 15 ■ ■ ■ ■ Boots & Gant, Bid: 'Cement Sidewalk 6 feet in width - .84 ■ ■ lineal ■ , ■ v 12 + • ■ ■ tiou ■ ■ ■ 'Cross -walks - - J, M. Coffey, Bid: 'Cement Sidewalk 6 & 12 foot Schneider Bros., Bid: 'Cement sidewalk 6 foot wide ' + 12 ■ ■ 'Cenent intersections Alley Daniel G. Burkhardt, Bid: 'Cement Sidewdlk 6 foot wide , ■ • 12 ■ 'Alley SntPreections - Tha bid of Behneider Bros., If the City Civil Engineer, the said Schneider Bros., square ■ wide .15 cts, per square foot .64.zlcts. ' lineal ' .12 cts., ' square foot ,66 cts.,per lineal foot .11 ' ' square' ' being the lowest and within the estimate on motion the contract was awarded to The Board did then adjourn, President 0 Board,, Attest; Clerk of Board.