Loading...
HomeMy Public PortalAbout04-27-1911 (2)Thursday April 27th, '_9li, The Board accepts a rider signed by General Electric Co. to be at- tached'& to form a kart of transformer contract approved by the Board & dated ;iarch 6th, 1911. The Board appointed Geo, J. Knollenberg, as Trench Inspector & Assistant stre,t ca-ua, §tJbner, and fix the wages of same at g2,50 per day. The Board meets to hear remonstrances and take final action on Declaratory Resolution No, 70-1911, For theopening& extension of the alley between BoyerF&CroninhallStreet,rbeginninat theal. corner of Lot Not g thence south to the!'Ecorner of Lot 1 in John Flatley.'s addition: thence east 15 ft: thence north parallel with the first mentioned line, to the sl corner of Lot 23 in said Cronin's Addition: thence west 15 1't,, to the place of beginning, being part of Tract No,7590f the Offic- al !lap of the City of Richmond: Also beginning at the NEcorner of Lot No,10 in J.Flatley's addition & running thence south, parallel to Boyer St,to the north line of J.M,Star -':r addition: thence east 15 ft, thence north. parallel to the first mentioned line, to Grant St: thence west to the place of beginning, being part of Lot ill J.Flatley's addition, and of Tract No. 76, Official Map of the City of Richmond: Mr, T. McDonnell, appeared before the Board pro- testing against said alley being thrown open througb:Traot No. 76, Official Nap, City of Richmond., The Board being fully advised in the natter, takes final action on same, an? the Board approves a final assesment roll, confirming in all things, the original asses- sment roll of benefits & damages as heretofore approved, and the Board now orders same transmitted forthwith to the Department of Finance. The Board agree that said alley not be thrown open through Tract No. 76, until such tine as it becomes necessary. The Board approves a primary assessment roll in the matter of the construction of district sewer in the alley between Chestnut Stet and right-of-way of Indlanapolls Livision of P,C,C.& St L. RY• from C.1 2nd St. to center of N.N 4th St . as provided for by Improvement Resolution !To, 238-1410, The Board meets to hear ali person- interested or whose property IS ai'fected by the following described public improvement: Improvenent Resolution Ho. 258-1911 providing for the improvement Of South 18t'n Street, By prading & macadamizing the roadway, & construction of cement curb,gutter & sidewalks on both sides of said street, from SOuth "A" to "B" Street, No one appearing or remonstrating against said improvement and being fully advisd in - the premises, the. Board decides that the property liable to be assessed for said improvement are equal to the estimated cost of the same as reported by the City Civil Engineer and thereupon tak's final action on said resolution as originally adopted, the Same - beirg corfirn=d r,ithout modification. AIn the Petition was presented for the construction of cement roadway "B" alley between North 12th & 13th Street from North "A" to Street, which was referred to the City Civil Engineer for P1'n3' The Board decide to use tarvia binder on Borth 13th St. from North C p2t. to Pen., R.R, at expense of the American Scoding Machine Y• as requested by Mr. Jas, Carr, V. P. Of said CcrapanY• Thursday April 27th, 1911 The Board Rescinds the former action in co ��1+ Resolution No, : 53-1911, providing for thenfL'971Tig Improvement Street, from Gout: 9th to 12t'n Street, by co iovenent of South ■R• wr sidewalks 6 feet wide with gutter etrip on both sidle ofeat"^et and grading & graveling the roadway between the points n and the Board now direct the Clerk to re -advertise & notify property owners of re -hearing on said resolution, and fix Londay may 22nd, loll, as a date upon which remonstrances may be or presented by personsfiled interested in, or affected b posed improvement as above described; y said pled TheNorBoard receives eiveth stbids forthe improvement of the alley between said alley the full widthbthereof, from i cement roadway in of, from North ■D■ Street to a point 47 feet south of the south line of Fin Place, as provided for by Improvement Resolution No, 255-19111 as follows:- ■ Schneider Bros., bid: Cement Roadway Complete - - 25jeents per square foot ■ All grading outside of Alley line to be extra at the price of 85 cents per cubic yard, to be neasured by the City Civil Engineer beforp. work is commenced to get the amount of excavation there is to be moved, as Jones Flardware Co, is to pay for said work, Hr. Hartrond, was directed to trikethis natter up with said Co., The Board receives bids for the inprovement of the alley first north of South "A" Street, by constructing a ceme*.t roadway in said allay from South 20th to 218t Street, as provided for by Improvement Resolution No. 254-1911, as folorrs:- John B. Sittloh, bid: Improvement Complete - - 18 .0 cents per square foot Schneider Bros., bid: Improvement Complete - - 21 1((/2 cents per sQuarewWanfoot ■ The bid of John B.* Sittloh bein g tine lowest am te eati.Llat,e of the city Ciril Engineer,the contract was awarded to the said John B. Sittloh, air streets as fol_ows: The Board direct the St. Conuiissioner to rep South 7th St, from South "A" St from 16th to 2trd St. macadanln, R.R. & Fort ■E" to "H" St,macadamin, North 17th St,Mafn troll°�tr 11 Mayne Ave, from R.R. to North "F" St. Pick & The Board did thin adjourn? I - oL p�dent� . Attest: . Clerk of Board. . a �y ..y..w L. «. r-mac "•�'•a { • a.cyy AMA sere