HomeMy Public PortalAbout06-23-1905 (1)34
f Board of Public Works,
office o
Ciity fzrd�hl 05. Indinnn,
June �
The Heard of Public works of the City of BoardoRichmond, Indiana, met
at the Office of said Board on Friday
Messrs,
ession f said Board being Present,
in regular s proceedings were had,
1e05, ell the members Fosa, The following P
Teller, Davenport nn
To -wits 11) was taken up, (Here insert) and
number Eleven (who appeared and being fully advised
Resolution 11 Persons ha bRneftts to nronertp
after hearing the Board decided that t ari
in the premises, for the improvement theegrs from Oheerepert
liable to be assessed as the same ape
sneer, end thereupon the Board takes final
equal to its estimated eery finally adopted, the same
of the City Civil Erg as °rig
action upon said Resolution,
being confirmed without modification.
The matter of the petition for several Atc Lirht^ in the fleet
Dart of the City was taken under advisement.
Bids were received and opeWhichos
Bidswererasoment as provided by
followp,ToVei
Resolution number One (li
Messrs, Atkinson & Pyle t Bid for
Six
A4 per lines
Ft, and for 15 Ft walk, 51.71 p Wper lineal Ft,
F't.
Daniel G. Burkhardt, Bid for Six Ft. Walk, 755�
and for 17 Ft. Walk, $1.64 per lineal
John F. Cronin, Bid for six Ft Walk, 70 per lineal Ft, and for
1' Ft. Walk, $1.71 1/2 per lineal Ft.
John H. A. Schneider Bid for Six Ft. walk, 71 per lineal Ft.
and for 17 Ft. Walk 11.54 per lineal Ft.
tThehisBid of John He A. Schneiderp work, the Following Resolution iwas ng tadoptedsbynthe aBoard&far
Be It Resolved By the Board of Fublie Works of tt:e City of #
Richmond, Indiana, That said Board of Public 'storks does deteroiotj
and hereby orders that the improvement as designated in ResOlupl
number One (1) be made and constructed in accordance with the
heF1
specifications and estimate of cost heretofore made by a city
Civil Engineer, And the Bid of John Ile A. Schneider, or
work the same being the lowest and best Bid made thid
erefoCivild
within the estimate of cost heretofore made by the City Atto
Engineer, be and the same is herebyaccepted, and the City tO Rule
of said City be and he is hereby regdired and directed t0
bl
a written contract for said work to be made and entered inchmos�9
and between said John H. A. Schneider, and said City of RI den
and said contract is hereby awarded to said John He A• Smid SO ed ibYl
e
Said contract to be drawn in accordance with the bc
with the laws ofbile Sonformity
nASchneider,
etto ofIndiana,and with
said He iIn all rithe Provisions
of this Resolution.
Pis Resolution was adopted by the unanimous vote of the
Board.
June 26rd, 1905.
Bids were received and onened for the imnro•iement as provided
by Resolution number Two (2) which bids were ea follnw�J To-wlt;
Atkinson & Pyle Bid 75� per lineal Ft.
Daniel G. Burkhardt Bid 690 per lineal Ft.
John F. Cronin Bid 7nQ per innal Ft.
John H. A. Schneider Bid 71 per lineal Ft.
Daniel G. Burkhardt being, the loawest and beet bidder therefor,
the following Resolution was then adopted by tllF Board;
Be It Resolved by the Board of Public Works of the City of
Richmond, Indiana, That said Board does determine and hereby orders
that the improvement as designated in Resolution number Two (£)
be made and constructed in accordance with the plans, anesifications
and estimate of cost heretofore made by the City Civil F17vineer,
and the Bid of said Daniel G. Burkhardt for said Rork, the Rare
being the lowes and best bid made therefor, and within the estimate
of cost heretofore made by the City Civil Engineer for said work,
be and the same is hereby accepted, and a contract for said work
awarded to him accordingly. And the City Attorney of said City be,
and he is hereby required and directed to cause a written oortrnet
to be entered into by and between said Daniel G. Burkhardt, end
said City of Richmond, in accordance with the bid so made by said
Daniel G. Burkhardt and in all respects in conformity with the laws
of the State of Indiana, and with the provisions of this Resolution.
The above Resolution was adopted by the unanimous vote of
the Board of Public works.
Bids were received and opened for the improvement as provided
by Resolution number Five (5) Which bids were as follows; To -wit;
John F. Cronin, Bid .87¢ per lineal FY.
Henry Nolte, Bid .77¢ per lineal Ft.
Henry Nolte being the lowest end best bidder therefor, the fol-
lowing Resolution was adopted by the Board;
Be It Resolved by the Board of Public Works of the City of
Richmond, Indiana, that said Board does determine and hereby orders
that the inproverient as designated in Resolution number Five (5)
be made and constructed in accordance with the plans, specifications
and estimate- of cost heretofore made by the City Civil Engineer,
and the Bid of said Henry Nolte, for said work, the sane being the
lowest and best bid made therefor, and within the estirate of cost
heretofore made by the City Civil Engineer, for said work, be, and
the same is hereby accepted, and a contract awarded to said Henry
Nolte accordingly. And the City Attorney of said City be and he is
hereby required and directed to cause a written contract to be
entered into by and between said Henry Nolte and She City of Rich-
mond, in accordance with the bid so made by said Henry Nolte, and
In all respects in conformity with the laws of the State of Indiana,
and with the provisions of this Resolution.
The above Resolution was adopted by the unanimous vote
of the Board of Public works.
L� =
[M]