HomeMy Public PortalAbout07-07-1905ru
July 5th, 1905'
for the construction of cement aides
�e pen dclph street# frog east or Se en
side were receto
ived Resolution number Seven
provided for in
wake � the Sou contractors and in the fel•
seat Fifth Strewers frog the following
(7) 1tiSan Ls, Tc-wi�fj�s Foot.
lowing Bid 66¢ pqr linealFoote
Ft. for sidewllk, and 74y� pR
J ieltt Atkins t bid, 7Ci nor bin
lineal Ft fcr ebidawalksor Lineal Ft• Pt for stdewal`+s, and 561
Jobe F. Cronin f per lineal
John H. A. Schneider sswalks.
per lineal Ft for onoconwas awarded to John A.tkines
of Mr. DnvenpcDestthe
bidderrtherefore The following Resoln
he motion
he being the lowest and
Is as then adopted, To-witf he Board of public Yorks of the City
Be It Resolved, By t•and
Richmond, That said Board of Pudeei blic sated in Resolutionenumber
er
ordere that the improvement as gTi
�/ (7) Seven, be made ind constricted in aecorile^f�'wbphthAeCity
rE
specifications ��idetherbid of JohnOstsAtkinson�rfor sa7d wort tte
Civil Engineer, best bid made Lharef�r, and within the
same being the lowest and the City Civil Engineer, be as
estimate of cost heretofore made by
the same is hereby accepted, and n Contract of said City
said Jobs
Atkinson accordingly, and the City Attorney written said City be WIN
is hereby roquired and directed to cause and between said dcJohnr
Asaid tkinsonkto be and said City ofe and onterdd Richmond,to by said contract to beadQaIn wn all
accordance with the bid so made by said John Atkinson,
respects in conformity with the laws ofv the State of Indiana, ed
the provisions of this Resolution.
the Board of public works ofathedCitydofythe unanimous vote of
Richmond*
The Petition for the construction of a cenent curb and gutter on
both sides of South ninth street, from South B gtr,et, to gonth
► Street, was referred to the Engineering Department for plans
and estimate of costs.
11
The Remonstrance against the opening of an alley between SouLDt
and South 12th, Streets, from South G Street, to South I Str
was considered and matter laid over until the meeting of the BO
to be held an Friday July 7th, lenR.
The pity Engineer submitted plans for the nonstruetion of nement
z'rF�Fi,- ^^. "-tn Street, which were referred to the City Attorn
1%• G. q6; CA ry. and City Attorney were on motion of Mr. Dev' �
ntt
Instructed to pas,"irn tlso r,n^essary blanks and Record BOO:.
41
Office of board of Public worts,
City Of RiohmOM, Indiana.
July, 7th, 1905.
The of Public works of the City of Richmond, Indiana, net
in rs a
r session at the office of said Board on Friday July f 7th,f 7th,
lops, at 10 O'Clook A. Me All the members bf sad Board being present,
viz; Yossrss, Zeller, Davenport and Rosa. The following proceedings
were had, To —wits
Resolution number 15 was taken up and considered, and after hearing
all persons who appeared and being fully advised In the premises, the
Board decided that the benefits to property liable to be assessed for
the improvement therein designated, are equal to its estimated costs
as the same appears from the report of the City Civil Engineer, and
thereupon the Board takes final notion on said Resolution, as origi—
rally adopted, the same being conflrned wltherit rodiftentien.
Resolution number Sixteen (16) (*ere insert) was then considered,
and after hearing all persons who epreared, and being fully adv'.sed
in the promisee the Board by unanimous vote did thereupon rescind
Said Resolution.
The matter of the complaint of Mitchell and Hires was referred to
the Street Commissioner for investigation and rennrt.
There being no further business the Hood did t'-.ereuren
adjourn.
Attest, CJ__�_
Olerk of Board